Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 2009
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  LongPark Wind Farm Wind 38 Scotland TD1 2QA Borders 0 / 2009 15/06/2016  
 1
  Glackmore Hill Wind Farm Wind 2.3 SIreland Co. Donegal 0 / 2009 20/09/2017  
 1
  Derrynadiva Wind Farm Wind 8 SIreland Co. Mayo 0 / 2009 20/10/2017  
 1
  Killybegs Wind Farm Wind 13.8 Aberdeenshire 0 / 2009 21/10/2017  
 1
  Birsay Wind Farm Wind 0.9 Scotland KW17 2HZ Orkney 1 / 2009 30/12/2016  
 1
  Howsham Mill Hydro 0.05 England YO60 7PA Yorkshire 1 / 2009 05/01/2017  
 1
  Garves Wind Farm Wind 15 N.Ireland Co. Antrim 1 / 2009 18/11/2016  
 1
  Advanced Manufacturing Wind Farm Wind 2.6 England S60 5TZ South Yorkshire 1 / 2009 19/08/2016  
 1
  Strath of Brydock Wind Farm Wind 6.9 Scotland AB45 3BX Aberdeenshire 1 / 2009 24/06/2016  
 1
  Bicker Wind Farm Wind 26 England PE20 3BS Lincolnshire 1 / 2009 26/03/2016  
 1
  MOEL MAELOGAN Wind Farm Wind 3.9 Wales LL26 0NY Conwy 1 / 2009 29/12/2016  
 1
  Carlin Howe Waste 2.602 England TS14 6RH Yorkshire 1 / 2009 30/10/2016  
 1
  Elsenham Waste 0.97 England CM22 6DJ Hertfordshire 1 / 2009 01/11/2016  
 1
  Manton Wood Wind Farm Wind 2 England S80 2PU Nottinghamshire 1 / 2009 14/12/2016  
 1
  Flughland Wind Farm Wind 9.2 SIreland Co. Donegal 1 / 2009 18/09/2017  
 1
  Lochhead Wind Farm Wind 6 Scotland ML9 3PP Strathclyde 1 / 2009 19/10/2016  
 1
  Lissett Wind Farm Wind 30 England YO25 8PZ Yorkshire 2 / 2009 25/03/2016  
 1
  Port of Liverpool Wind Farm Wind 10 England L20 1BA Merseyside 2 / 2009 22/11/2016  
 1
  Path Head Waste 1.015 England NE21 4SP Tyne and Wear 2 / 2009 20/02/2017  
 1
  Ballincollig Hill Wind Farm Wind 0.9 SIreland Co. Kerry 2 / 2009 27/09/2017  
 1
  Cairnhill Wind Farm Wind 2.4 Scotland Grampian 3 / 2009 30/08/2016  
 1
  Slieve Divena Wind Farm Wind 30 N.Ireland Co. Tyrone 3 / 2009 06/05/2015  
 1
  Inner Dowsing Wind Farm Wind 108 England PE24 4UD Lincolnshire 3 / 2009 31/03/2016  
 1
  Welbeck Waste 6.7 England WF6 2JA Yorkshire 3 / 2009 21/02/2017  
 1
  Coomagearlaghy II Wind Farm Wind 32.5 SIreland Co. Kerry 3 / 2009 26/09/2017  
 1
  Scarborough Biomass 1.96 Scotland YO11 3UT Grampian 3 / 2009 17/05/2017  
 1
  Sillahertane Wind Farm Wind 8.5 SIreland Co. Kerry 3 / 2009 19/10/2017  
 1
  Achairn Wind Farm Wind 4.95 Scotland KW1 5SG Caithness 4 / 2009 18/12/2014  
 1
  BARNSLEY Waste 0.86 England WV15 5HG Shropshire 4 / 2009 03/07/2015  
 1
  Courtstone Wind Farm Wind 2.3 Scotland AB41 7HH Aberdeenshire 4 / 2009 17/11/2016  
 1
  Gruig Wind Farm Wind 25 N.Ireland BT44 9JS Co. Antrim 4 / 2009 09/03/2016  
 1
  Balnamoon Wind Farm Wind 0.8 Scotland AB55 6ND Aberdeenshire 5 / 2009 31/12/2016  
 1
  Inverlael Hydro 2.5 Scotland IV23 2RG Inverness-shire 5 / 2009 14/07/2016  
 1
  Whitelee Wind Farm Wind 539 Scotland KA3 6EX Lanarkshire 5 / 2009 21/10/2014  
 1
  Aikengall Wind Farm Wind 48 Scotland East Lothian 5 / 2009 30/05/2016  
 1
  Broom Hill Wind Farm Wind 8 England DL15 9QU Co. Durham 5 / 2009 17/10/2014  
 1
  West Durham Wind Farm Wind 24 England DL17 9EU Co. Durham 5 / 2009 26/03/2016  
 1
  Skibeden Waste 1.96 England BD23 6AB North Yorkshire 5 / 2009 15/02/2017  
 1
  Beinn nan Oighrean Wind Farm Wind 4.6 Scotland IV19 1LH Ross & Cromarty 6 / 2009 13/11/2016  
 1
  Caledonian Biomass 26 Scotland KA11 5AT Strathclyde 6 / 2009 25/05/2017  
 1
  Lisheen Wind Farm Wind 55 SIreland Co. Tipperary 7 / 2009 07/10/2017  
 1
  Bagmoor Wind Farm Wind 16 England DN15 9HU Lincolnshire 7 / 2009 28/02/2016  
 1
  Llandulas Waste 2.73 Wales LL22 8HP Clwyd 7 / 2009 24/10/2016  
 1
  Cannington Waste 3.296 England TA5 2NJ Somerset 7 / 2009 09/10/2016  
 1
  Carnoch Hydro 1.4 Scotland PH33 7AF Highland 7 / 2009 19/05/2017  
 1
  Oyster Wave 0.35 Scotland Orkney 8 / 2009 25/10/2016  
 1
  Shannagh Wind Farm Wind 2.7 SIreland Co. Donegal 8 / 2009 20/09/2017  
 1
  North Foreshore Waste 5.68 England BT3 9JU Co. Antrim 8 / 2009 23/02/2017  
 1
  Anarget Wind Farm Wind 1.98 SIreland Co. Donegal 9 / 2009 17/09/2017  
 1
  Longlands Lane Biomass 10 Wales 9 / 2009  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Clayhill the UKs first subsidy-free solar farm
Clayhill solar farm, located in Milton Keynes, was officially opened on 26 September 2017 by Claire Perry MP, the UK Minister for Climate Change & Industry.
Source: anesco, Date and Time of entry: 15 October 2017 00:00

Triodos banks on UK solar with 18 million double refinancing package
The two sites in question are the 15.1MW Stokes Marsh solar farm in Coulston, Wiltshire, and the 5MW Stoneshill solar farm in Exeter.
Source: spp, Date and Time of entry: 15 October 2017 00:00

Inside ClayHill, the UKs first subsidy-free solar farm
At 10MW in size, Clay Hill Solar Farm is the UKs first built in the absence of any government support. Construction started roughly two months after the Renewables Obligation slammed shut and long after the eligibility window closed.
Source: spp, Date and Time of entry: 15 October 2017 00:00

IRELAND: Nordex wins a 17.5MW order from ABO Wind
The deal is for seven N90/2500 turbines and a five-year service contract. The turbines will go to 15MW Gibbett Hill wind farm and 2.5MW Glenough 2 wind farm.
Source: windpower, Date and Time of entry: 13 October 2017 00:00

TOURNAFULLA
Airtricity began construction of this 18 turbine site in April 2006.
Source: sse, Date and Time of entry: 12 October 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.