Header Area NO

 

Loading

List of major Wave and Tidal Power Schemes in the UK.
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 5( 1 Seen )
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian = U
Status
  Projects currently Generating
 1
  Ness of Quoys 0 Scotland KW1 4YH Caithness 6 / 2016 10/25/2016  
 1
  Warness 0 Scotland KW17 2AA Orkney 10/7/2016 0 / 0 10/27/2016  
 1
  Warness 0 Scotland KW17 2AA Orkney 0 / 0 10/27/2016  
 1
  Warness 0 Scotland KW17 2AA Orkney 0 / 0 10/27/2016  
 1
  Oyster 0.35 Scotland Orkney 8 / 2009 10/25/2016  
 1
  Billia Croo 0.8 Scotland KW16 3JP Strathclyde 1 / 2013 5/25/2017  
 1
  Ramsey Sound 1 Wales SA62 6PY Pembrokeshire 12 / 2015 10/25/2016  
 1
  Brummer 1 Scotland KW17 2AA Orkney 7 / 2013 10/20/2016  
 1
  Strangford Lough 1.2 N.Ireland Co. Down 11/1/2003 12/21/2005 3/1/2008 7 / 2008 10/20/2016  
 1
  Wave 20 England Cornwall 2/17/2005 7/15/2009 6/1/2010 9 / 2010 5/8/2017  
 1
  wave 23 England Cornwall 9 / 2010 5/8/2017  
  Projects planning approved and / or under construction
 2
  West Islay 0.1 Scotland Argyllshire 10/10/2013 7 / 2008 10/20/2016  
 2
  Lynmouth 1.2 England Devon 10/1/2011 4/27/2012 0 / 0 10/27/2016  
 2
  Wootton Bridge 2 England PO33 4LJ Isle of Wight 1/19/2009 5/8/2009 0 / 0 10/25/2016  
 2
  Mull of Kintyre 3 Scotland Argyllshire 7/23/2014 0 / 0 10/20/2016  
 2
  Pentland Firth 6 Scotland Orkney 7/19/2012 9/16/2013 1/21/2015 0 / 0 10/25/2016  
 2
  Pentland Firth 6 Scotland Orkney 7/19/2012 9/16/2013 0 / 0 10/25/2016  
 2
  Sound of Islay 10 Scotland Highland 7/25/2010 3/17/2011 0 / 0 10/20/2016  
 2
  St Catherines Race 30 England PO38 1UF Isle of Wight 12/12/2014 4/20/2016 0 / 0 8/23/2016  
 2
  Lewis 40 Scotland Western Isles 3/22/2012 5/22/2013 0 / 0 1/4/2015  
 2
  Swansea Bay 240 Wales Conwy 3/6/2014 6/9/2015 0 / 0 10/25/2016  
  Projects which are proposed and / or going through planning process
 3
  Vagr Atferth 1 Scotland KW16 3AW Orkney 0 / 0 10/20/2016  
 3
  Milford Haven 7 Wales Pembrokeshire 2/16/2007 0 / 0 1/27/2015  
 3
  Milford Haven 7 Wales Pembrokeshire 2/16/2007 0 / 0 3/19/2015  
 3
  Skerries 10 Wales Anglesey 0 / 0 8/14/2014  
 3
  Marwick Head 49.5 Scotland Orkney 0 / 0 10/20/2016  
 3
  Marwick Head 49.5 Scotland Orkney 0 / 0 8/6/2014  
 3
  West Orkney 50 Scotland Orkney 0 / 0 10/25/2016  
 3
  West Orkney Mid South 50 Scotland Orkney 0 / 0 8/14/2014  
 3
  Brough Head 50 Scotland Shetland 0 / 0 8/14/2014  
 3
  Armadale 50 Scotland Caithness 0 / 0 8/14/2014  
 3
  Ness of Duncansby 100 Scotland Caithness 0 / 0 4/9/2015  
 3
  Brough Ness 100 Scotland Shetland 0 / 0 10/20/2016  
 3
  Costa Head 200 Scotland Orkney 0 / 0 8/14/2014  
 3
  Cantick Head 200 Scotland Shetland 5/20/2016 0 / 0 10/20/2016  
 7
  Siadar Bay 4 Scotland Highland 0 / 0 8/14/2014  
 7
  Severn Barrage 8640 England Avon 0 / 0 12/5/2014  
 9
  Swansea Bay 320 Wales Glamorgan 0 / 0 2/15/2017  
Status
  Site Name
Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

UK achieves solar power record as temperatures soar
It said 8.7 gigawatts (GW) had been generated at lunchtime, representing 24.3% of total generation across the UK.
Source: bbc, Date and Time of entry: Saturday, May 27, 2017 00:00

Welsh Water installs wind turbine at Nash WwTW
Once completed the turbine will produce five million kWh each year, which is the equivalent to the annual usage of around 1,500 households.
Source: wwtonline, Date and Time of entry: Friday, May 26, 2017 00:00

Five-turbine North Yell windfarm approved by councillors
The small windfarm will consist of turbines with a hub height of 44m and a blade length of 70m situated at Garth, Yell, with a capacity of 4.25 megawatts.
Source: shetlandtimes, Date and Time of entry: Friday, May 26, 2017 00:00

SNETTERTON RENEWABLE ENERGY PLANT
Plans to generate first power and open renewable energy plant in Spring 2017, when it will generate 44MW of electricity which is enough to supply 82,000 homes.
Source: snettertonbiomass, Date and Time of entry: Thursday, May 25, 2017 00:00

Siemens & UPM Caledonian win award for large-scale biomass energy plant in Scotl
Siemens, the leading global engineering and technology company was awarded the Combined Heat and Power Associationís Industrial and Commercial Award for its work with UPMís Caledonian paper mill (UPM),
Source: siemens, Date and Time of entry: Thursday, May 25, 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.