Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1998
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 34.237.124.210
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Huddersfield Waste 9.5 England HD1 6NT Yorkshire 0 / 1998 05/10/2016  
 1
  Rachel Carson Wind Farm Wind 18 Holland Netherlands 0 / 1998 15/04/2019  
 1
  TYTHEGSTON Waste 1.175 Wales CF32 0NE Breconshire 1 / 1998 20/02/2017  
 1
  Stewartby Waste 10.66 England MK43 9LY Bedfordshire 1 / 1998 06/10/2016  
 1
  Bidstone Moss Waste 2.34 England CH44 2HE Merseyside 1 / 1998 30/10/2016  
 1
  FFESTINIOG Hydro 0.7 Wales LL41 4PB Merionethshire 1 / 1998 05/01/2017  
 1
  Stoke 14.2 England ST4 4DX Staffordshire 1 / 1998 05/10/2016  
 1
  Ellington Waste 0.945 England NE65 9XR Northumberland 1 / 1998 01/11/2016  
 1
  Seghill Village Waste 1.422 England NE23 7DY Northumberland 2 / 1998 16/10/2016  
 1
  Meece Landfill Waste 1.75 Wales 3 / 1998  
 1
  COXHOE Waste 3.8 England DH6 4RT Co. Durham 4 / 1998 06/09/2017  
 1
  Crockahenny Wind Farm Wind 5 s.ireland Co. Donegal 4 / 1998 18/09/2017  
 1
  Billinge Hill Quarry Waste 1 England WN5 7PF Merseyside 4 / 1998 30/10/2016  
 1
  BEDDINGHAM Waste 1.109 England BN8 6JS East Sussex 5 / 1998 05/10/2016  
 1
  Teesside Waste 20.069 England TS23 1PY Cleveland 5 / 1998 05/10/2016  
 1
  Bradgate Waste 2.47 England LE12 9BV Leicestershire 7 / 1998 06/07/2015  
 1
  Fjeldskar Wind Farm Wind 3.75 Norway Vest Agder 7 / 1998 29/05/2019  
 1
  Fjeldskar Wind Farm Wind 3.75 Norway Vest-Agder 7 / 1998 29/05/2019  
 1
  DULYN WEIR Hydro 0.5 England LL32 8SH Cheshire 8 / 1998 14/07/2016  
 1
  Hafotty Ucha Wind Farm Wind 0.6 Wales Gwynedd 9 / 1998 18/11/2016  
 1
  Randalstown Hydro 0.42 N.Ireland BT41 2AH Co. Antrim 9 / 1998 01/12/2017  
 1
  Pilsworth Waste 7 England BL9 7JL Lancashire 10 / 1998 16/10/2016  
 1
  Chelson Meadow Waste 3.18 England PL9 7JA Devon 10 / 1998 06/10/2016  
 1
  Kibblesworth Waste 2.34 England NE11 0TW Co. Durham 10 / 1998 01/11/2016  
 1
  Warren Waste 1.902 England LE9 3JL Leicestershire 11 / 1998 24/10/2016  
 1
  Slievenahanaghan Wind Farm Wind 1 N.Ireland BT44 9JE Co. Londonderry 11 / 1998 13/06/2016  
 1
  Lamby Way Waste 4 Wales CF3 2HP South Glamorgan 11 / 1998 15/10/2016  
 3
  Arbre Biomass 8 England Yorkshire 0 / 1998 03/07/2015  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Italy’s Eni to buy 20% stake in world’s largest offshore wind farm
Eni will now take a share of Dogger Bank A & Dogger Bank B, which will have a combined capacity of 2.4 gigawatts when fully operational. Upon completion of the deal, Equinor and SSE’s share in Dogger Bank A & B will still amount to 40% each.
Date and Time of entry: 21 December 2020 00:00

14 MW GE Haliade-X for Third Phase
GE Renewable Energy has secured a preferred turbine supplier contract to provide its 14 MW Haliade-X turbine for the third phase Dogger Bank C offshore wind project.
Source: offshorewind, Date and Time of entry: 21 December 2020 00:00

EDF submits planning permission for first 50MW UK solar farm
EDF Renewables' 49.9MW Sutton Bridge solar farm has taken another step forward as its planning application goes before South Holland District Council.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with 49.9MW site planned
EDF Renewables is looking to develop a 49.9MW solar farm at Tye Lane near Bramford. The farm – if granted planning permission – would provide a community fund of up to £10,000 annually for its 35-year lifetime.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with another 50MW site announced
It is planning to develop the solar farm – Bloy’s Grove – on a site between the villages of Swainsthorpe and Mulbarton, just south of Norwich, in South Norfolk.
Source: spp, Date and Time of entry: 17 December 2020 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.