Sorry I found no matches, Please try again.
Bin Mountain Wind Farm Sorry I found no matches, Please try again.
vid = 47pws_id = 350827pws_id = 350827
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.231.166.56YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Bin Mountain Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Bin Mountain Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Bin Mountain Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, BT81 7QY    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 9 MW
Approx Date of 1st power generation: September 2007

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The wind farm capacity is 9MW. Bin Mountain will save over 20,000 tonnes of CO2 emissions per year and power more than 5,000 homes.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Bin Mountain DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Bin Mountain : Wind OFGEM Reference:-na-

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 9
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 08/03/2021
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 9 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350827


Weather Station Name : Castlederg Latitude: 54.7063 Longitude: -7.5909 Elevation: 45

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00N 4 5 / 25 0
12/07/2018 12:00:00NNW 7 5 / 25 0
12/07/2018 15:00:00N 7 5 / 25 0
12/07/2018 18:00:00N 9 5 / 25 0
12/07/2018 21:00:00NNE 4 5 / 25 0
13/07/2018NNW 2 5 / 25 0
13/07/2018 03:00:00WNW 2 5 / 25 0
13/07/2018 06:00:00WSW 2 5 / 25 0
13/07/2018 09:00:00W 2 5 / 25 0
13/07/2018 12:00:00W 2 5 / 25 0
13/07/2018 15:00:00WSW 4 5 / 25 0
13/07/2018 18:00:00WSW 4 5 / 25 0
13/07/2018 21:00:00SW 2 5 / 25 0
14/07/2018SW 4 5 / 25 0
14/07/2018 03:00:00SSW 7 5 / 25 0
14/07/2018 06:00:00SSW 9 5 / 25 0
14/07/2018 09:00:00SSW 9 5 / 25 0
14/07/2018 12:00:00SSW 11 5 / 25 0
14/07/2018 15:00:00SSW 11 5 / 25 0
14/07/2018 18:00:00SSW 9 5 / 25 0
14/07/2018 21:00:00SSW 9 5 / 25 0
15/07/2018SSW 9 5 / 25 0
15/07/2018 03:00:00SSW 9 5 / 25 0
15/07/2018 06:00:00SSW 9 5 / 25 0
15/07/2018 09:00:00SSW 11 5 / 25 0
15/07/2018 12:00:00SSW 11 5 / 25 0
15/07/2018 15:00:00SW 9 5 / 25 0
15/07/2018 18:00:00WSW 7 5 / 25 0
15/07/2018 21:00:00W 4 5 / 25 0
16/07/2018W 4 5 / 25 0
16/07/2018 03:00:00WSW 4 5 / 25 0
16/07/2018 06:00:00WSW 4 5 / 25 0
16/07/2018 09:00:00WSW 7 5 / 25 0
16/07/2018 12:00:00W 7 5 / 25 0
16/07/2018 15:00:00W 9 5 / 25 0
16/07/2018 18:00:00WNW 7 5 / 25 0
16/07/2018 21:00:00NW 4 5 / 25 0
Project Info
Airtricity - BIN MOUNTAIN

Electricity Generation Licence - BIN MOUNTAIN

Greencoat UK Wind: Seed Portfolio
The Company has acquired 50% of Braes of Doune, 100% of Tappaghan, 100% of Carcant and 100% of BIN MOUNTAIN from SSE and 41% of Little Cheyne Court and 24.95% of Rhyl Flats from RWE and a 24.95% interest in Rhyl Flats.

RES and airtricity Sign Deal on sale of Slieve Divena Phase II
The acquisition by Airtricity of the Slieve Divena extension is another important step in the ongoing development of the leading renewable energy companys wind farm portfolio in Northern Ireland, which includes wind farms at Tappaghan, BIN MOUNTAIN,

Wind farm under investigation as wild trout stocks disappear
During recent weeks and months, nets dropped in Lough Lee situated close to BIN MOUNTAIN above Killen and Drumquin under the instruction of the Department of Culture, Arts and Leisure, turned up only a minuscule sample of small puny fish.

©2018 Simon Mallett
Latest News Added
Italys Eni to buy 20% stake in worlds largest offshore wind farm
Eni will now take a share of Dogger Bank A & Dogger Bank B, which will have a combined capacity of 2.4 gigawatts when fully operational. Upon completion of the deal, Equinor and SSEs share in Dogger Bank A & B will still amount to 40% each.
Date and Time of entry: 21 December 2020 00:00

14 MW GE Haliade-X for Third Phase
GE Renewable Energy has secured a preferred turbine supplier contract to provide its 14 MW Haliade-X turbine for the third phase Dogger Bank C offshore wind project.
Source: offshorewind, Date and Time of entry: 21 December 2020 00:00

EDF submits planning permission for first 50MW UK solar farm
EDF Renewables' 49.9MW Sutton Bridge solar farm has taken another step forward as its planning application goes before South Holland District Council.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with 49.9MW site planned
EDF Renewables is looking to develop a 49.9MW solar farm at Tye Lane near Bramford. The farm if granted planning permission would provide a community fund of up to 10,000 annually for its 35-year lifetime.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with another 50MW site announced
It is planning to develop the solar farm Bloys Grove on a site between the villages of Swainsthorpe and Mulbarton, just south of Norwich, in South Norfolk.
Source: spp, Date and Time of entry: 17 December 2020 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School