Sorry I found no matches, Please try again.
DECC REPD RESTATS DECC Renewable Energy Projects Database
Not Logged on, Max pages: 10( Seen ) ID:1 Ind:0 IP: 3.227.233.55
Page views from this IP Range (Company) : All time = this month = today = This IP this session = ( of 10)YESU WSHW:
Loading

DECC: REPD / RESTATS data presented in a user friendly format

Download of DECC Data. (Original Data REPD (Renewable Energy Planning Database / RESTATS) as a spreadsheet can be found on the .gov.uk website)

Search using:
Technology: Active only : Agreed only :
Capacity: From: MW To: MW eg. 5 to 15
Planning Authority:
  (Maximum of 1,000 lines shown)
Current Listing of Renewable Energy Schemes from DECC Renewable Energy Projects Database, a public resource.
Technology being Listed:
Type name Postcode deccref date live Last Updated Planning Authority capacity
Sorry I found no matches, Please try again.
Total Sites Listed = Total Potential Capacity = 0
Total Active Capacity =


Recent News:

How to become a solar farm manager: Manish's story
Now Manish manages ten solar farm sites across the UK, which are fields of solar panels storing and converting energy from the sun
Source: bbc, Date and Time of entry: 18 September 2019 00:00

Doncaster Sheffield Airport plans £2m solar farm to cut emissions
Doncaster Airport (DSA) said renewable energy could generate 25% of its energy and would also
Source: bbc, Date and Time of entry: 18 September 2019 00:00

1.7MWp ground-mounted solar farm to be built at Doncaster Sheffield Airport
The £2 million ground-mounted farm is set to open in 2020. The Peel Group is currently reviewing the best path to delivering the project, which it claims could supply up to 4MW of green power.
Source: spp, Date and Time of entry: 18 September 2019 00:00

BayWa r.e. boasts ‘exciting plans’ for UK renewables as O&M portfolio tops 2GW
BayWa r.e. has amassed 2GW in its solar and wind management portfolio since entering the UK O&M market in 2017.
Source: spp, Date and Time of entry: 18 September 2019 00:00

York set for 400kW ‘HyperHub’ solar carport with storage.
Monks Cross carport backed up with battery storage is set to be built in York as part of its 'HyperHubs' project.The solar carport has a proposed generation capacity of up to 400kW, powering a mix of 160kW and 7kW electric vehicle (EV) chargers.
Source: spp, Date and Time of entry: 18 September 2019 00:00



| | |

test VIP = 1