Carsington Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Carsington Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Carsington Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Derbyshire    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 10 MW
Approx Date of 1st power generation: February 2014

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

September 28 2008: Proposals to erect four 102 metre high wind turbines and associated ancillary equipment on land at Carsington Pastures, Manystones Lane, Carsington have been approved by Secretary of State for Communities and Local Government following an eight day public inquiry held in July at Matlock Town Hall.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Carsington DECC Reference:EN00345

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Carsington : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 8.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 24/02/2020
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 8.2 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 350155


Weather Station Name : Ashbourne Latitude: 53.0163 Longitude: -1.7307 Elevation: 118

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00E 7 5 / 12 0
12/07/2018 12:00:00E 4 5 / 12 0
12/07/2018 15:00:00E 7 5 / 12 0
12/07/2018 18:00:00E 4 5 / 12 0
12/07/2018 21:00:00NE 7 5 / 12 0
13/07/2018E 7 5 / 12 0
13/07/2018 03:00:00E 7 5 / 12 0
13/07/2018 06:00:00E 7 5 / 12 0
13/07/2018 09:00:00ESE 7 5 / 12 0
13/07/2018 12:00:00ESE 4 5 / 12 0
13/07/2018 15:00:00SE 7 5 / 12 0
13/07/2018 18:00:00SSW 4 5 / 12 0
13/07/2018 21:00:00WSW 4 5 / 12 0
14/07/2018W 2 5 / 12 0
14/07/2018 03:00:00NW 2 5 / 12 0
14/07/2018 06:00:00NW 4 5 / 12 0
14/07/2018 09:00:00WNW 2 5 / 12 0
14/07/2018 12:00:00WSW 4 5 / 12 0
14/07/2018 15:00:00W 7 5 / 12 0
14/07/2018 18:00:00W 4 5 / 12 0
14/07/2018 21:00:00WNW 4 5 / 12 0
15/07/2018WNW 4 5 / 12 0
15/07/2018 03:00:00W 4 5 / 12 0
15/07/2018 06:00:00W 4 5 / 12 0
15/07/2018 09:00:00SW 4 5 / 12 0
15/07/2018 12:00:00SW 7 5 / 12 0
15/07/2018 15:00:00SW 7 5 / 12 0
15/07/2018 18:00:00WSW 7 5 / 12 0
15/07/2018 21:00:00WNW 7 5 / 12 0
16/07/2018WNW 4 5 / 12 0
16/07/2018 03:00:00WNW 4 5 / 12 0
16/07/2018 06:00:00WNW 4 5 / 12 0
16/07/2018 09:00:00WNW 4 5 / 12 0
16/07/2018 12:00:00WNW 7 5 / 12 0
16/07/2018 15:00:00WNW 7 5 / 12 0
16/07/2018 18:00:00NW 9 5 / 12 0
16/07/2018 21:00:00NW 7 5 / 12 0
Project Info
West Coast Energy : CARSINGTON

(2013) Wind turbines delivery could cause traffic disruption
Special delivery of wind turbine units bound from Goole for CARSINGTON Pasture Wind Farm is likely to cause local traffic disruption for two weeks from 22 November.

CARSINGTON Pastures wind farm build to get under way
CARSINGTON Wind Energy, the group behind the project, said work would begin in the week beginning 21 May and take about six months to complete.

PARWICH.ORG: CARSINGTON Wind Farm
Thank you to Martin for these photos and links relating to the controversial new wind-farm on CARSINGTON Pastures. Whatever you may think of the merits this development, it certainly photographs well:

Wind farm 'will harm Peak District', High Court hears
They are to be built at CARSINGTON Pastures, between Matlock and Ashbourne, which is just outside the park and adjoins the CARSINGTON Water beauty spot.

©2018 Simon Mallett
Latest News Added
MHI Vestas secures Seagreen turbine gig
MHI Vestas has entered into a preferred supplier agreement to supply and service up to 114 wind turbines for the 1100MW Seagreen offshore wind farm being built in Scottish waters.
Source: renews, Date and Time of entry: 18 October 2019 00:00

Corbyn says Fife wind farm contract plan -not credible
Jeremy Corbyn says plans to manufacture parts for a 2bn wind farm off the Fife coast at a site thousands of miles away are not credible.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Noisy wind farm extension paused after Barrow residents object
Residents claiming a nearby wind farm has been noisy for 20 years have convinced councillors to pause plans to keep it open for another decade.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Glenshimmeroch wind farm project approved on appeal
A 10-turbine wind farm in southern Scotland has been approved on appeal. Developers Energiekontor took the case to the Scottish government over Dumfries and Galloway Council's failure to issue a decision.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Workers at Isle of Lewis BiFab yard to lose jobs
Workers at a fabrication yard, which was brought back into use just six months ago, have been told they will not have their contracts renewed.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School