Sorry I found no matches, Please try again.
Craig Wind Farm Sorry I found no matches, Please try again.
vid = 115pws_id = 351406pws_id = 351406
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.231.166.56YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Craig Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Craig Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Craig Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Dumfries & Galloway    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 8 MW
Approx Date of 1st power generation: September 2007

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

INSTALLATION OF ONE WIND TURBINE (ADDITIONAL TO 5 TURBINES GRANTED UNDER APPEAL P/PPA/170/117) AND EXTENSION TO EXISTING WINDFARM ACCESS TRACK APPLICATION WITHOUT COMPLIANCE WITH CONDITIONS 1, 3, 9 AND 10 OF PLANNING PERMISSION 09/P/4/0342
The project itself consists of four Nordex N80 wind turbines on 60 metre towers with rotor diameters of 80 metres. Construction work at the site will commence in August 2006, with electricity generation projected to start in summer 2007.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Craig DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Craig : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 10
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 08/03/2021
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 10 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351406


Weather Station Name : Evertown Latitude: 55.0758 Longitude: -3.0048 Elevation: 78

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00E 7 5 / 25 0
12/07/2018 12:00:00ESE 2 5 / 25 0
12/07/2018 15:00:00ENE 4 5 / 25 0
12/07/2018 18:00:00E 4 5 / 25 0
12/07/2018 21:00:00E 9 5 / 25 0
13/07/2018ENE 7 5 / 25 0
13/07/2018 03:00:00ENE 4 5 / 25 0
13/07/2018 06:00:00E 4 5 / 25 0
13/07/2018 09:00:00ESE 4 5 / 25 0
13/07/2018 12:00:00SE 4 5 / 25 0
13/07/2018 15:00:00S 7 5 / 25 0
13/07/2018 18:00:00SSW 7 5 / 25 0
13/07/2018 21:00:00SW 4 5 / 25 0
14/07/2018SSW 4 5 / 25 0
14/07/2018 03:00:00SSE 2 5 / 25 0
14/07/2018 06:00:00SE 2 5 / 25 0
14/07/2018 09:00:00SW 9 5 / 25 0
14/07/2018 12:00:00SW 13 5 / 25 0.081 0.812.43
14/07/2018 15:00:00SW 11 5 / 25 2.43
14/07/2018 18:00:00SW 9 5 / 25 2.43
14/07/2018 21:00:00SW 7 5 / 25 2.43
15/07/2018SSW 4 5 / 25 2.43
15/07/2018 03:00:00S 4 5 / 25 2.43
15/07/2018 06:00:00SSE 7 5 / 25 2.43
15/07/2018 09:00:00SSW 9 5 / 25 2.43
15/07/2018 12:00:00SW 9 5 / 25 2.43
15/07/2018 15:00:00SW 11 5 / 25 2.43
15/07/2018 18:00:00SW 9 5 / 25 2.43
15/07/2018 21:00:00SW 4 5 / 25 2.43
16/07/2018SSW 4 5 / 25 2.43
16/07/2018 03:00:00S 4 5 / 25 2.43
16/07/2018 06:00:00S 4 5 / 25 2.43
16/07/2018 09:00:00SW 4 5 / 25 2.43
16/07/2018 12:00:00WSW 7 5 / 25 2.43
16/07/2018 15:00:00WSW 7 5 / 25 2.43
16/07/2018 18:00:00W 7 5 / 25 2.43
16/07/2018 21:00:00W 4 5 / 25 2.43
Project Info
CRAIGGORE WIND FARM NAMED ONE OF THE BEST PROJECTS IN IRELAND
Northern Irelands first subsidy-free wind farm, CRAIGgore Wind Farm, was named as one of the Best Projects in Ireland at the second Irish Wind Industry Awards in Dublin on Friday (24th January).

This is the waterfall which formed as a reservoir
Caban Coch is part of a series of Elan Valley Reservoirs that include the Claerwen, CRAIG-goch, Pen-y-garreg and Garreg-ddu.

Temporis Arranges 82.7m Financing for Blue Energy
Temporis has arranged an 82.7m project finance loan for Blue Energys 52.9MW BlackCRAIG wind farm, with funds being provided by the Green Investment Bank and KKR via the lending programme Temporis manages for them.

Sheep farmer seals 10m pioneering windfarm contract

CRAIG Wind Farm Limited

©2018 Simon Mallett
Latest News Added
Italys Eni to buy 20% stake in worlds largest offshore wind farm
Eni will now take a share of Dogger Bank A & Dogger Bank B, which will have a combined capacity of 2.4 gigawatts when fully operational. Upon completion of the deal, Equinor and SSEs share in Dogger Bank A & B will still amount to 40% each.
Date and Time of entry: 21 December 2020 00:00

14 MW GE Haliade-X for Third Phase
GE Renewable Energy has secured a preferred turbine supplier contract to provide its 14 MW Haliade-X turbine for the third phase Dogger Bank C offshore wind project.
Source: offshorewind, Date and Time of entry: 21 December 2020 00:00

EDF submits planning permission for first 50MW UK solar farm
EDF Renewables' 49.9MW Sutton Bridge solar farm has taken another step forward as its planning application goes before South Holland District Council.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with 49.9MW site planned
EDF Renewables is looking to develop a 49.9MW solar farm at Tye Lane near Bramford. The farm if granted planning permission would provide a community fund of up to 10,000 annually for its 35-year lifetime.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with another 50MW site announced
It is planning to develop the solar farm Bloys Grove on a site between the villages of Swainsthorpe and Mulbarton, just south of Norwich, in South Norfolk.
Source: spp, Date and Time of entry: 17 December 2020 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School