Header Area Not Logged on, Max pages: 5( Seen ) ID:3293 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

test Solar Farm

Cansee = YES

Subscribers see an interactive map with test Solar Farm and local projects displayed.

Subscribe for £100 to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

test Solar Farm (Solar , Active)

 General Information.

Location in the UK : , Bretforton    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 0 MW
Approx Date of 1st power generation:

/YES

 Comment

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: test DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: test : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Dunsland Cross residents say new wind turbines have a ‘devastating’ impact
The application was received on Wednesday, December 21, 2011. It was highly conTESTed by locals, with over 400 comments being posted on Torridge District Council’s planning website. The application was later denied.

Caherdowney wind farm
Over a three day period the various sections of this turbine were tranported to the Caherdowney wind farm this wind turbine is 2500m above sea level and is the highTEST E70 turbine in the country.

FAIR HEAD TIDAL TO REVEAL LATEST PLANS TO BALLYCASTLE AND RATHLIN COMMUNITIES
The renewable energy firm behind proposals to install a tidal generation scheme off Fair Head is to host two open days to gather opinions and share information with local communities.

Turbines up at Garreg Lywd
The 17th and final turbine has been installed at RES’ 30.6MW Garreg Lwyd Hill wind farm in Powys in Wales. TESTing and commissioning works of the site’s Vestas V100 hardware are ongoing ahead of full operations.

AQUAMARINE POWER
Oyster 800 was grid-connected in June 2012 at EMEC’s Billia Croo TEST site until the TEST programme ended in 2015, when the company ceased trading.

©2017 Simon Mallett

Latest News Added
Anesco opens ‘subsidy free’ solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Ireland’s Largest Solar Project!
This is Northern Ireland’s largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett