Header Area Not Logged on, Max pages: 5( Seen ) ID:3293 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Clayhill Solar Farm

Cansee = YES

Subscribers see an interactive map with Clayhill Solar Farm and local projects displayed.

Subscribe for £100 to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Clayhill Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, MK45 5JD    
Type of installation: Solar    on/offshore: on
Solar Panels :31240  Capacity : 10 MW
Acreage:45   or approx Hectares : 18
Approx Date of 1st power generation: September 2017

/YES

 Comment

Clayhill solar farm, located in Milton Keynes, was officially opened on 26 September 2017 by Claire Perry MP, the UK Minister for Climate Change & Industry.

It took 12 weeks to complete and combines the latest in solar and energy storage technology, with 10MW of solar PV co-located with 5 energy storage units totalling 6MW.
6MW worth of battery storage, housed in five 1.2MW containers.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Clayhill DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Clayhill : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Inside CLAYHILL, the UK’s first subsidy-free solar farm
At 10MW in size, Clay Hill Solar Farm is the UK’s first built in the absence of any government support. Construction started roughly two months after the Renewables Obligation slammed shut and long after the eligibility window closed.

CLAYHILL – the UKs first subsidy-free solar farm
CLAYHILL solar farm, located in Milton Keynes, was officially opened on 26 September 2017 by Claire Perry MP, the UK Minister for Climate Change & Industry.

Solar Farm Proposal CLAYHILL Farm Westoning
The developer, a company called Axiom, set out plans to install a large (19 MW) solar farm covering 36 ha of farmland, which will generate electricity for the grid.

©2017 Simon Mallett

Latest News Added
Dunsland Cross residents say new wind turbines have a ‘devastating’ impact
The application was received on Wednesday, December 21, 2011. It was highly contested by locals, with over 400 comments being posted on Torridge District Council’s planning website. The application was later denied.
Source: budetoday, Date and Time of entry: 10 November 2017 00:00

Senvion concludes 33 megawatt contract with Innogy Renewables UK Ltd.
Hamburg/Edinburgh: Senvion, a leading global manufacturer of wind turbines, has signed a contract with Innogy Renewables UK Ltd. to supply 16 wind turbines from its two megawatts (MW) series for the Mynydd y Gwair wind farm in South Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

Senvion grabs RWE contract
RWE has confirmed it has awarded a contract to German turbine supplier Senvion to supply all 28 turbines to its 57.4MW Brechfa Forest West Wind Farm in Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

to-the-point: RWE in Wales awards 57.4-MW turbine order to Senvion
Under the deal, financial details on which were not revealed, Senvion will supply 28 units of 2.05-MW turbines with a maximum tip height of up to 145 metres.
Source: renewablesnow, Date and Time of entry: 10 November 2017 00:00

Proposal to build Britain’s biggest solar farm near Whitstable (Cleve Hill)
Developers have today unveiled plans to blanket 890 acres of farmland near Graveney with the energy-producing panels.
Source: kentonline, Date and Time of entry: 09 November 2017 00:00

©2017 Simon Mallett