Header Area Not Logged on, Max pages: 5( Seen )YESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Hyde Solar Farm

Cansee = YES

Subscribers see an interactive map with Hyde Solar Farm and local projects displayed.

Subscribe for 100 to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for 500 to include full csv downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Hyde Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, MK46 4DU    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 4.16 MW
Approx Date of 1st power generation: March 2017

/YES

 Comment

15/01791/FUL | Construction of solar development to generate renewable electricity, to include the installation of solar panels, underground cabling, inverter / transformer stations, DNO and client sub-station, spare parts container, landscaping and other associated works | Hyde Farm Warrington Road Olney MK46 4DU

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Hyde DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Hyde : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Godley Reservoir
The Godley Reservoir is a reservoir in Godley, HYDE, Greater Manchester. It was completed in 1851, as a critical part of the Longdendale Chain project that brought fresh water to Manchester.

Europe's largest floating solar farm to open
The previous largest floating solar farm in Europe was opened in HYDE, Greater Manchester, at Christmas. It measures 45,500 sq m but it and the new farm are both dwarfed by the world's largest.

floating solar power farm on a reservoir in Tameside
Footage taken from the skies and on land shows the power-generating project, which is now operational, at Godley Reservoir in HYDE.

The Langdon Action Group is opposing plans from Lumicity
Anthony HYDE, chairman of The Langdon Action Group says he will be objecting against the proposed 50 acre solar farm at the Old Engine Shed Field on Sutton Court Farm.

HYDE landfill site earmarked for solar farm plan
The Dunkirk Farm site to the west of the junction of M67 and Dukinfield Road in HYDE, was formerly home to a rubbish tip. It was sold to Landcare (Manchester) Ltd, which is now working with Cheshire-based Green Energy on the plans.

©2017 Simon Mallett

Latest News Added
DEAL TO COMBINE WIND AND TIDAL POWER OUTPUT
Lochend has reached agreement with MeyGen to allow these wind turbines to deliver electricity to the grid whenever the MeyGen tidal project is not making full use of the available export capacity.
Source: atlantisresourcesltd, Date and Time of entry: Friday, June 23, 2017 00:00

Three new Wind Turbines approved near Ottringham
THREE 50m HIGH wind turbines are to be constructed just South of Ottringham (on land North West of Far Marsh Farm, Marsh Road).
Source: hu12online, Date and Time of entry: Friday, June 23, 2017 00:00

Decision casts doubt over turbine project
Local farmer James Gammie applied to build three of the 80m high structures on neighbouring plots of land at Gawnsmoss, Gledsgreen and Cairnhill.
Source: banffshire-journal, Date and Time of entry: Friday, June 23, 2017 00:00

500kW Turbine Commissioned at Lawrence Landfill
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill,
Source: windenergydirect, Date and Time of entry: Friday, June 23, 2017 00:00

Brynwhilach Farm
The main construction phase of the first 5MW phase of the development took place between December 2016 and March 2017 when the site began exporting renewable electricity to the grid.
Source: goodenergy, Date and Time of entry: Thursday, June 22, 2017 00:00

©2017 Simon Mallett