Header Area Not Logged on, Max pages: 5( Seen ) ID:725 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Billia Croo

Cansee = YES

Subscribers see an interactive map with Billia Croo and local projects displayed.

Subscribe for £100 to have full access to all Wave projects and details.


Subscribe to Wave for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Wave project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Billia Croo (Wave , Active)

 General Information.

Location in the UK : Scotland, KW16 3JP    
Type of installation: Wave    on/offshore: off
Turbines :0  Capacity : 0.8 MW
Approx Date of 1st power generation: January 2013

/YES

 Comment

test programme ended in 2015, when the company ceased trading.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Billia Croo DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Billia Croo : Wave OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
AQUAMARINE POWER
Oyster 800 was grid-connected in June 2012 at EMEC’s BILLIA CROO test site until the test programme ended in 2015, when the company ceased trading.

EMEC Wave test site Awareness Chart

Oyster 1, Orkney
first full-scale 315kW Oyster wave energy device at the European Marine Energy Centre's test site at BILLIA CROO, near Stromness in Orkney in the summer of 2009.

©2017 Simon Mallett

Latest News Added
Dunsland Cross residents say new wind turbines have a ‘devastating’ impact
The application was received on Wednesday, December 21, 2011. It was highly contested by locals, with over 400 comments being posted on Torridge District Council’s planning website. The application was later denied.
Source: budetoday, Date and Time of entry: 10 November 2017 00:00

Senvion concludes 33 megawatt contract with Innogy Renewables UK Ltd.
Hamburg/Edinburgh: Senvion, a leading global manufacturer of wind turbines, has signed a contract with Innogy Renewables UK Ltd. to supply 16 wind turbines from its two megawatts (MW) series for the Mynydd y Gwair wind farm in South Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

Senvion grabs RWE contract
RWE has confirmed it has awarded a contract to German turbine supplier Senvion to supply all 28 turbines to its 57.4MW Brechfa Forest West Wind Farm in Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

to-the-point: RWE in Wales awards 57.4-MW turbine order to Senvion
Under the deal, financial details on which were not revealed, Senvion will supply 28 units of 2.05-MW turbines with a maximum tip height of up to 145 metres.
Source: renewablesnow, Date and Time of entry: 10 November 2017 00:00

Proposal to build Britain’s biggest solar farm near Whitstable (Cleve Hill)
Developers have today unveiled plans to blanket 890 acres of farmland near Graveney with the energy-producing panels.
Source: kentonline, Date and Time of entry: 09 November 2017 00:00

©2017 Simon Mallett