Header Area Not Logged on, Max pages: 5( Seen ) ID:657 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Spalding Biomass Energy

Cansee = YES

Subscribers see an interactive map with Spalding Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Spalding (Biomass , Active)

 General Information.

Location in the UK : England, PE12 6BL    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 14.5 MW
Approx Date of 1st power generation: July 2015

/YES

 Comment

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Spalding DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Spalding : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Bourne solar farm is connected to National Grid
A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid. Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Bourne solar farm is connected to National Grid
Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Bourne solar farm is connected to National Grid
A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid.Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Noisy wind farm 'drove couple out of their home'
Jane and Julian Davis, moved out of Grays Farm, Deeping St Nicholas, near SPALDING, Lincs, four years ago because of the strain of living with the incessant noise.

©2017 Simon Mallett

Latest News Added
Lightning strikes Irish turbine
A “severe” lightning strike has destroyed a blade on an Enercon E-48 turbine at the 3.2MW Meenanilta 3 wind farm in Ireland’s north west.
Source: renews, Date and Time of entry: 20 September 2017 00:00

Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00

£1.3m wind farm row is settled
Saporito (Wind) Ltd claimed it contracted Vestas Danish Wind Technology to build three turbines for the Anarget Wind Farm.
Source: independent.ie, Date and Time of entry: 17 September 2017 00:00

MINNIGAP WIND FARM CONNECTION
SP Energy Networks is providing the connection for the Minnygap Wind Farm situated approximately 10km South West of Moffat. The connection will be provided via an underground cable from the wind farm to the existing Bearholm substation at Moffat.
Source: sp, Date and Time of entry: 16 September 2017 00:00

©2017 Simon Mallett