Header Area Not Logged on, Max pages: 5( Seen ) ID:217 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Chilton Biomass Energy

Cansee = YES

Subscribers see an interactive map with Chilton Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Chilton (Biomass , Active)

 General Information.

Location in the UK : England,    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 18 MW
Approx Date of 1st power generation: March 2012

/YES

 Comment

Installation and Operation of a Biomass Fired Heat and Power Plant and Ancillary Facilities including offices, storage and processing plant and equipment and reconfiguration of existing wood pellet factory - WPE Site Chilton Industrial Estate - Dalkia Bio Energy Limited, Staines, Middlesex - Plan Ref : 7/2008/0522/DM.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Chilton DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Chilton : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Jobs Cars Property Directory Announcements Sign In Search MORE NEWS TRANSPORT CR
The plans for the 78 metre high turbine – the height of a 25 storey building – on Maple Hill off CHILTON Street, Clare, was opposed by Clare, Stoke by Clare, Hundon, Ashen and Kedington parish councils

CHILTON Cantelo solar farm approved
The 5MW solar farm will cover 13.6 hectares of land near the village of CHILTON Cantelo in south Somerset.

Residents fear proposed solar farm will devalue their homes Read more: http://w
Plans to install a 5MW solar farm on 13.6 hectares at The Cypress House Road, CHILTON Cantelo, have been submitted to South Somerset District Council

County Durham bio-energy plant opens
A new biomass energy plant in County Durham has been officially opened. The Dahlia plant in CHILTON will make energy from recycled wood by creating wood chips which can then be burned as carbon neutral fuel.

©2017 Simon Mallett

Latest News Added
Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00

£1.3m wind farm row is settled
Saporito (Wind) Ltd claimed it contracted Vestas Danish Wind Technology to build three turbines for the Anarget Wind Farm.
Source: independent.ie, Date and Time of entry: 17 September 2017 00:00

MINNIGAP WIND FARM CONNECTION
SP Energy Networks is providing the connection for the Minnygap Wind Farm situated approximately 10km South West of Moffat. The connection will be provided via an underground cable from the wind farm to the existing Bearholm substation at Moffat.
Source: sp, Date and Time of entry: 16 September 2017 00:00

PEN Y FAN WIND TURBINE PROJECT GEARS UP FOR THE BIG POUR!
This will be Sirius Renewable Energy’s 7th turbine in the fleet and will (when completed) supply discounted renewable energy (green power) to Abingdon Flooring’s on-site factory for a minimum of 15 years
Source: sirius group, Date and Time of entry: 12 September 2017 00:00

©2017 Simon Mallett