Ice Solar Farm

Cansee = YES

Subscribers see an interactive map with Ice Solar Farm and local projects displayed.

Subscribe for £100 to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Ice Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, WF9 3AP    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 0.455 MW
Approx Date of 1st power generation: August 2016

/YES

 Comment

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Ice DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Ice : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Wind farm being sued by families admits its liability
The case against Enercon Windfarm ServICEs Ireland Ltd and Carrigcannon Wind Farm Ltd was taken by the Shivnen family and another six households in Banteer including couples, families, and one single occupant.

Cork village families settle action against wind turbine operators
The cases against Enercon Windfarm ServICEs Ireland Ltd and Carrigcannon Wind Farm Ltd were taken by the Shivnen family and others including couples, families, and one single occupant.

JDR completes 140km of cables for BeatrICE windfarm
English subsea specialist JDR has finished making 140km of inter array connections for the BeatrICE Offshore Windfarm.

Planning permission granted for brownfield solar PV at Snowdown Colliery
The Landmark PractICE has secured full planning permission for a 5MW solar park at Snowdown Colliery at Aylesham in Kent.

SSE Renewables applies to build NI's largest wind farm near Draperstown
SSE began engagement with the Planning ServICE in 2013 and has also held a series of community consultations. It is anticipated that the wind farm would connect to the grid at the Magherafelt substation.

©2017 Simon Mallett

Latest News Added
Wind farm being sued by families admits its liability
The case against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd was taken by the Shivnen family and another six households in Banteer including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Cork village families settle action against wind turbine operators
The cases against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd were taken by the Shivnen family and others including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Lightning strikes Irish turbine
A “severe” lightning strike has destroyed a blade on an Enercon E-48 turbine at the 3.2MW Meenanilta 3 wind farm in Ireland’s north west.
Source: renews, Date and Time of entry: 20 September 2017 00:00

Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00