Header Area Not Logged on, Max pages: 5( Seen ) ID:3293 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Eshmore Wind Farm

Cansee = YES

Subscribers see an interactive map with Eshmore Wind Farm and local projects displayed.

Subscribe for £100 to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Eshmore Wind Farm (Wind , Agreed/Planning)

 General Information.

Location in the UK : N.Ireland, Co. Tyrone    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2.3 MW
Approx Date of 1st power generation: December 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Energia Renewables Planning Permission Grant
53.167429

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Eshmore DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Eshmore : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations



Alternative Wind Speed: in mph

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
WIND FARM EXTENSION TURBINE CONSENTED
A wind turbine extension to ESHMORE Wind Farm in Co. Tyrone has been recently consented with planning permission.

Energia banks Irish wind cash
A total of 25 Enercon and five Siemens turbines feature across the portfolio that includes site such as Long Mountain, ESHMORE, Gortfinbar, Glenbuck and Altamuskin.

©2017 Simon Mallett

Latest News Added
Anesco opens ‘subsidy free’ solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Ireland’s Largest Solar Project!
This is Northern Ireland’s largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett