Header Area Not Logged on, Max pages: 5( Seen ) ID:3293 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Burbo Bank Extension Wind Farm

Cansee = YES

Subscribers see an interactive map with Burbo Bank Extension Wind Farm and local projects displayed.

Subscribe for £100 to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Burbo Bank Extension Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Mersyside    
Type of installation: Wind    on/offshore: off
Turbines :32  Capacity : 256 MW
Approx Date of 1st power generation: April 2017

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Burbo Bank extension created as a distinct project due to different turbine make and model.
The 258MW Burbo Bank project includes 32 turbines which stand almost 640 feet high, taller than the Gherkin in London, across an area the size of 5824 football pitches.(Telegraph)

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Burbo Bank Extension DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Burbo Bank Extension : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 256
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 0 m/s (0 mph)

Local Weather Station: BALA(3409)
Elevation of Weather Station:

Date for Wind forecast: 20/01/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
World’s largest wind turbines may double in size before 2024
17/05/2017 Dong Energy will officially open the second phase of its giant BURBO BANK EXTENSION offshore wind farm off the coast of Merseyside coast later today by showcasing its 8MW turbines, the largest ever used.

BURBO BANK EXTENSION offshore wind farm

Vestas V164-8.0MW

Burbo Bank Wind Farm extension Planning
A decision on the application for a development consent order for BURBO BANK EXTENSION offshore wind farm was taken on 26 September 2014 and has now been issued.

©2017 Simon Mallett

Latest News Added
Anesco opens ‘subsidy free’ solar farm with battery storage
Solar capacity is 10MW at the Clayhill site, with 6MW of battery capacity and the company says it is the first solar farm in the UK to operate without a subsidy.
Source: theenergyst, Date and Time of entry: 16 January 2018 00:00

Turning On N.Ireland’s Largest Solar Project!
This is Northern Ireland’s largest solar energy development. The Antrim project will create enough energy to power more than 11,000 homes.
Source: lightsource, Date and Time of entry: 29 December 2017 00:00

Severn Trent invests £60m in Minworth thermal hydrolysis plant
The £60m scheme will change the way that the company treats waste before generating green power and will make the process considerably more efficient, meaning the amount of clean energy generated will increase by almost a third.
Source: severnwaste, Date and Time of entry: 29 December 2017 00:00

UK enjoyed greenest year for electricity ever in 2017
In April, the UK had its first 24-hour period without using any coal power since the Industrial Revolution.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

Last of massive piles laid for Moray Firth wind farm
Energy firm SSE, which is involved in the Beatrice Offshore Windfarm project, said a total of 86 clusters of four piles had been put in place.
Source: bbc, Date and Time of entry: 28 December 2017 00:00

©2017 Simon Mallett