Lower Basset Down Solar Farm

Cansee = YES

Subscribers see an interactive map with Lower Basset Down Solar Farm and local projects displayed.

Subscribe for 100 to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for 500 to include full csv downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Lower Basset Down Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, SN4 9QP    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 10.5 MW
Approx Date of 1st power generation: March 2016

/YES

 Comment

INRG Solar Operational

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Lower Basset Down DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Lower Basset Down : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info

©2017 Simon Mallett

Latest News Added
DEAL TO COMBINE WIND AND TIDAL POWER OUTPUT
Lochend has reached agreement with MeyGen to allow these wind turbines to deliver electricity to the grid whenever the MeyGen tidal project is not making full use of the available export capacity.
Source: atlantisresourcesltd, Date and Time of entry: Friday, June 23, 2017 00:00

Three new Wind Turbines approved near Ottringham
THREE 50m HIGH wind turbines are to be constructed just South of Ottringham (on land North West of Far Marsh Farm, Marsh Road).
Source: hu12online, Date and Time of entry: Friday, June 23, 2017 00:00

Decision casts doubt over turbine project
Local farmer James Gammie applied to build three of the 80m high structures on neighbouring plots of land at Gawnsmoss, Gledsgreen and Cairnhill.
Source: banffshire-journal, Date and Time of entry: Friday, June 23, 2017 00:00

500kW Turbine Commissioned at Lawrence Landfill
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill,
Source: windenergydirect, Date and Time of entry: Friday, June 23, 2017 00:00

Brynwhilach Farm
The main construction phase of the first 5MW phase of the development took place between December 2016 and March 2017 when the site began exporting renewable electricity to the grid.
Source: goodenergy, Date and Time of entry: Thursday, June 22, 2017 00:00