Header Area Not Logged on, Max pages: 5( Seen ) ID:1969 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Lewis

Cansee = YES

Subscribers see an interactive map with Lewis and local projects displayed.

Subscribe for £100 to have full access to all Wave projects and details.


Subscribe to Wave for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Wave project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Lewis (Wave , Agreed/Planning)

 General Information.

Location in the UK : Scotland, Isle of Lewis    
Type of installation: Wave    on/offshore: on
Turbines :0  Capacity : 40 MW
Approx Date of 1st power generation:

/YES

 Comment

Full consent has been given for a 40MW farm off the north-west coast of Lewis - enough to power nearly 30,000 homes.

Wave energy firm Aquamarine Power said it would begin installing its Oyster devices in the next few years, once grid nfrastructure is put in place.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Lewis DECC Reference:AA797

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Lewis : Wave OFGEM Reference:-na-

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Tolsta Community Development, has been established to construct the turbine
The skyline in North Tolsta on the east side of LEWIS has changed from this weekend after the tower of the community wind turbine was erected.

New turbines for Isle of LEWIS wind project
The developer, co-operative Urras Energy, has raised £705,800 in community share investment in the scheme at Ballantrushal on LEWIS.

£1.6 million bank deal for community turbine
has secured a £1.6 million loan from the Co-operative Bank which will enable its first turbine to be delivered and installed at Ballantrushal in North LEWIS later this year.

Application for Pairc Wind Farm
An application for a 205 megawatt, 57 turbine wind farm on the Pairc peninsula, Isle of LEWIS, was submitted to the Scottish Executive on 1 June 2007 by Scottish and Southern Energy.

Beatrice wind farm work creates 71 new jobs on LEWIS
Burntisland Fabrications (BiFab) was awarded a £2million contract for Beatrice Offshore Windfarm project and started work in Arnish in October.

©2017 Simon Mallett

Latest News Added
Wind farm being sued by families admits its liability
The case against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd was taken by the Shivnen family and another six households in Banteer including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Cork village families settle action against wind turbine operators
The cases against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd were taken by the Shivnen family and others including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Lightning strikes Irish turbine
A “severe” lightning strike has destroyed a blade on an Enercon E-48 turbine at the 3.2MW Meenanilta 3 wind farm in Ireland’s north west.
Source: renews, Date and Time of entry: 20 September 2017 00:00

Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00

©2017 Simon Mallett