Header Area Not Logged on, Max pages: 5( Seen ) ID:725 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Lewis

Cansee = YES

Subscribers see an interactive map with Lewis and local projects displayed.

Subscribe for £100 to have full access to all Wave projects and details.


Subscribe to Wave for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Wave project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Lewis (Wave , Agreed/Planning)

 General Information.

Location in the UK : Scotland, Isle of Lewis    
Type of installation: Wave    on/offshore: on
Turbines :0  Capacity : 40 MW
Approx Date of 1st power generation:

/YES

 Comment

Full consent has been given for a 40MW farm off the north-west coast of Lewis - enough to power nearly 30,000 homes.

Wave energy firm Aquamarine Power said it would begin installing its Oyster devices in the next few years, once grid nfrastructure is put in place.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Lewis DECC Reference:AA797

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Lewis : Wave OFGEM Reference:-na-

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Tolsta Community Development, has been established to construct the turbine
The skyline in North Tolsta on the east side of LEWIS has changed from this weekend after the tower of the community wind turbine was erected.

New turbines for Isle of LEWIS wind project
The developer, co-operative Urras Energy, has raised £705,800 in community share investment in the scheme at Ballantrushal on LEWIS.

£1.6 million bank deal for community turbine
has secured a £1.6 million loan from the Co-operative Bank which will enable its first turbine to be delivered and installed at Ballantrushal in North LEWIS later this year.

Application for Pairc Wind Farm
An application for a 205 megawatt, 57 turbine wind farm on the Pairc peninsula, Isle of LEWIS, was submitted to the Scottish Executive on 1 June 2007 by Scottish and Southern Energy.

Beatrice wind farm work creates 71 new jobs on LEWIS
Burntisland Fabrications (BiFab) was awarded a £2million contract for Beatrice Offshore Windfarm project and started work in Arnish in October.

©2017 Simon Mallett

Latest News Added
Dunsland Cross residents say new wind turbines have a ‘devastating’ impact
The application was received on Wednesday, December 21, 2011. It was highly contested by locals, with over 400 comments being posted on Torridge District Council’s planning website. The application was later denied.
Source: budetoday, Date and Time of entry: 10 November 2017 00:00

Senvion concludes 33 megawatt contract with Innogy Renewables UK Ltd.
Hamburg/Edinburgh: Senvion, a leading global manufacturer of wind turbines, has signed a contract with Innogy Renewables UK Ltd. to supply 16 wind turbines from its two megawatts (MW) series for the Mynydd y Gwair wind farm in South Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

Senvion grabs RWE contract
RWE has confirmed it has awarded a contract to German turbine supplier Senvion to supply all 28 turbines to its 57.4MW Brechfa Forest West Wind Farm in Wales.
Source: senvion, Date and Time of entry: 10 November 2017 00:00

to-the-point: RWE in Wales awards 57.4-MW turbine order to Senvion
Under the deal, financial details on which were not revealed, Senvion will supply 28 units of 2.05-MW turbines with a maximum tip height of up to 145 metres.
Source: renewablesnow, Date and Time of entry: 10 November 2017 00:00

Proposal to build Britain’s biggest solar farm near Whitstable (Cleve Hill)
Developers have today unveiled plans to blanket 890 acres of farmland near Graveney with the energy-producing panels.
Source: kentonline, Date and Time of entry: 09 November 2017 00:00

©2017 Simon Mallett