Header Area -/- YESWSHWS: ||||| showdata: WindNot Logged on, Max pages: 5( Seen )YESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Hare Hill Wind Farm

Cansee = YES

Subscribe to Wind for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm

For an example of a wind project see: Little Cheyne Court Wind Farm

To create a login account see: User Registration
This will allow 30 page views each session rather than 5

Hare Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, County Durham, England    
Type of installation: Wind    on/offshore: on
Turbines :20  Capacity : 13 MW
Approx Date of 1st power generation: November 2000

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

At the time of their construction in 2004, the turbines at Harehill Wind Farm were the largest and most powerful in the UK.
Under the terms of the first of the agreements signed with the Scottish utility1, Gamesa will install and commission 35 G52-850 kW turbines, with heights ranging between 44 and 65 metres, for expansion of the Hare Hill wind farm, a development located close to the Scottish town of New Cumnock.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Hare Hill DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Hare Hill : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 13.2
Start Speed: 4 m/s (8.948 mph)
Optimum Speed: 13 m/s (29.081 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station: SAUGHALL(3139)
Elevation of Weather Station:

Date for Wind forecast: 2/27/2017
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Gamesa contracted to supply 52 MW to ScottishPower Renewables
The company will install 35 G52-850 kW turbines at the HARE HILL wind farm and 11 of its G90-2.0 MW turbines at the Glen App development.

Scottish Power HARE HILL Wind Farm Project

E.on HARE HILL Wind Farm

©2016 Simon Mallett

Latest News Added
Horshader Community Development 900kW Wind Turbine
The turbine is operated and managed by Risort Power Generation Ltd, the trading arm of HCDT.
Date and Time of entry: Saturday, February 25, 2017 00:00

Barra & Vatersay Wind Energy
When the island of Barra’s wind turbine started operation in 2014 the community celebrated the completion of a massive project which will benefit residents for a generation.
Source: smartestenergy, Date and Time of entry: Friday, February 24, 2017 00:00

Swansea Bay wind turbine rejected due to impact fears Read more at http://www.so
CITY planning officers have thrown out a bid for a 252ft wind turbine that would have overlooked Swansea Bay.
Source: southwales-eveningpost, Date and Time of entry: Thursday, February 23, 2017 00:00

Swansea wind turbine helps Welsh Water reduce its carbon footprint
A wind turbine at the Swansea Bay Waste Water Treatment Works on Fabian Way is playing an important role in helping Welsh Water to reduce its carbon footprint by creating its own renewable energy on site.
Source: dwrcymru, Date and Time of entry: Thursday, February 23, 2017 00:00

Tolsta Community Development, has been established to construct the turbine
The skyline in North Tolsta on the east side of Lewis has changed from this weekend after the tower of the community wind turbine was erected.
Source: .hebrides-news, Date and Time of entry: Thursday, February 23, 2017 00:00

©2016 Simon Mallett