Header Area Not Logged on, Max pages: 5( Seen )YESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Pen y Cymoedd Wind Farm

Cansee = YES

Subscribers see an interactive map with Pen y Cymoedd Wind Farm and local projects displayed.

Subscribe for 100 to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for 500 to include full csv downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Pen y Cymoedd Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, West of Aberdare    
Type of installation: Wind    on/offshore: on
Turbines :76  Capacity : 228 MW
Approx Date of 1st power generation: 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Pen y Cymoedd Wind Energy Project is a 76 turbine wind energy project, located in South Wales. In May 2012 the project was granted consent by the Secretary of State for Energy.

The project is expected to be operational by 2016, and will have an installed capacity of up to 228MW.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Pen y Cymoedd DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Pen y Cymoedd : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station: ST-ATHAN(3716)
Elevation of Weather Station:

Date for Wind forecast: 6/26/2017
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
PEN Y CYMOEDD Wind Energy Project

PEN Y CYMOEDD: Nuon Renewables

Mynydd Llansadwrn Action Group

Contracts to supply PEN Y CYMOEDD wind farm awarded
Developers behind the largest onshore wind farm project in England and Wales have awarded two new multi-million pound contracts to supply chain companies.

Giant wind farm one step closer Between Aberdare and Neath
The planned PEN Y CYMOEDD wind farm would stretch between Aberdare and Neath on land south of the A465 Heads of the Valleys road.

©2017 Simon Mallett

Latest News Added
DEAL TO COMBINE WIND AND TIDAL POWER OUTPUT
Lochend has reached agreement with MeyGen to allow these wind turbines to deliver electricity to the grid whenever the MeyGen tidal project is not making full use of the available export capacity.
Source: atlantisresourcesltd, Date and Time of entry: Friday, June 23, 2017 00:00

Three new Wind Turbines approved near Ottringham
THREE 50m HIGH wind turbines are to be constructed just South of Ottringham (on land North West of Far Marsh Farm, Marsh Road).
Source: hu12online, Date and Time of entry: Friday, June 23, 2017 00:00

Decision casts doubt over turbine project
Local farmer James Gammie applied to build three of the 80m high structures on neighbouring plots of land at Gawnsmoss, Gledsgreen and Cairnhill.
Source: banffshire-journal, Date and Time of entry: Friday, June 23, 2017 00:00

500kW Turbine Commissioned at Lawrence Landfill
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill,
Source: windenergydirect, Date and Time of entry: Friday, June 23, 2017 00:00

Brynwhilach Farm
The main construction phase of the first 5MW phase of the development took place between December 2016 and March 2017 when the site began exporting renewable electricity to the grid.
Source: goodenergy, Date and Time of entry: Thursday, June 22, 2017 00:00

©2017 Simon Mallett