Header Area Not Logged on, Max pages: 5( Seen ) ID:217 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Brigg Biomass Energy

Cansee = YES

Subscribers see an interactive map with Brigg Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Brigg (Biomass , Active)

 General Information.

Location in the UK : Scotland, Lincolnshire    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 40 MW
Approx Date of 1st power generation:

/YES

 Comment

This plant has been refused planning permission and is subject to a public inquiry sometime in 2011.

Brigg Renewable Energy Project: Will use straw, sourced from local farms, to generate some 300 million units of electricity annually, equivalent to the average needs of 65,000 households. The ash will be returned to the farms to be ploughed in as a fertilizer.
The generation of an estimated quarter of a million tonnes of carbon dioxide could be avoided each year.
While the soil conditioning aspect of straw being ploughed back into the soil will be lost, the overall level of sustainability within this project is high, however there will be a high volume of lorry traffic created by this scheme, apparently an alternative, being the use of barges has been dismissed.
An application for planning permission to build Brigg Renewable Energy Plant was first submitted in 2008. After consultation, these plans were withdrawn to allow Eco2 to reconsider its proposals for dealing with flood risk at the site.

Eco2 re-submitted a planning application which has taken into account Environment Agency concerns surrounding flood mitigation. The new plans included flood plain compensation and a surface water storage system that are designed specifically for the Brigg REP site. If the plans go ahead, the scheme would reduce the extent of flooding in the local area.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Brigg DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Brigg : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Fears over green power plant plan
(2008)Plans for a "green" power station near BRIGG in North Lincolnshire have sparked protests from local residents.

STRAW POLL IS ALL WE CAN OFFER
(Feb 2010) It was good of the Scunthorpe Telegraph to inform us this week that the BRIGG Biomass power plant scheme has been amended and re-submitted for council consideration.

Planning Application (Resubmission)
This page contains a listing of every document that formed part of the BRIGG planning application pack. The document comprised four volumes:

Cameron backs BRIGG biomass plant
(2008) Conservative Party leader David Cameron MP said he supported a planned biomass in BRIGG, when he attended a special public meeting last night.

Anti-biomass campaign banner stolen
(2009) CAMPAIGNERS who are fighting to block Eco2's plans to build the BRIGG biomass plant say they are not going to give up – despite having all of their banners removed.

©2017 Simon Mallett

Latest News Added
Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00

£1.3m wind farm row is settled
Saporito (Wind) Ltd claimed it contracted Vestas Danish Wind Technology to build three turbines for the Anarget Wind Farm.
Source: independent.ie, Date and Time of entry: 17 September 2017 00:00

MINNIGAP WIND FARM CONNECTION
SP Energy Networks is providing the connection for the Minnygap Wind Farm situated approximately 10km South West of Moffat. The connection will be provided via an underground cable from the wind farm to the existing Bearholm substation at Moffat.
Source: sp, Date and Time of entry: 16 September 2017 00:00

PEN Y FAN WIND TURBINE PROJECT GEARS UP FOR THE BIG POUR!
This will be Sirius Renewable Energy’s 7th turbine in the fleet and will (when completed) supply discounted renewable energy (green power) to Abingdon Flooring’s on-site factory for a minimum of 15 years
Source: sirius group, Date and Time of entry: 12 September 2017 00:00

©2017 Simon Mallett