Header Area Not Logged on, Max pages: 5( Seen ) ID:676 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

FEY Pickering Biomass Energy

Cansee = YES

Subscribers see an interactive map with FEY Pickering Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

FEY Pickering (Biomass , Agreed/Planning)

 General Information.

Location in the UK : Wales, Pickering, Yorkshire    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 5 MW
Approx Date of 1st power generation: Planned 2011

/YES

 Comment

FEY - Future Energy Yorkshire is a project to develop the overall biomass energy generating industry, both for specific Biomass energy generation plants and co-fired plants such as Drax, Ferrybridge and Eggborough.
The approved fuel measurement technique is a draft European standard called prCEN/TS 15440 “Solid recovered fuel - Method for the determination of biomass content”.
If the “target” biomass generation of 5 MW is achieved,
35,000 tones of Green House Gas (GHG) emissions would be offset annually. Note that these GHG emission reductions are equivalent to 3.5 X Pickering’s Municipal Operations’ annual emissions and over 10% of Pickering’s 2016 reduction target.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: FEY Pickering DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: FEY Pickering : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info

©2017 Simon Mallett

Latest News Added
World's First Floating Wind Farm Exceeds Expectations
The world's first floating wind farm only switched on three months ago but it's already performing better than expected—and that's despite a hurricane, a powerful winter storm and waves as high as 8.2 meters (27 feet).
Source: ecowatch, Date and Time of entry: 20 February 2018 00:00

River Coiltie Hydro: Works Due to Start
Access remains open across the entire site throughout construction but please be aware that it is an active construction site.
Source: canoescotland, Date and Time of entry: 16 February 2018 00:00

(2013) Wiltshire village set for solar farm
The solar farm has been proposed for a site in Codford, Wiltshire, and a planning application has now been submitted to the local council highlighting necessary work and all additional developments.
Source: evoenergy, Date and Time of entry: 08 February 2018 00:00

UK built half of Europe's offshore wind power in 2017
Britain accounted for more than half of the new offshore wind power capacity built in Europe last year, as the sector broke installation records across the continent.
Source: guardian, Date and Time of entry: 08 February 2018 00:00

Advice not to oppose Windy Standard turbine expansion
The scheme would see 20 turbines added to the current 66 already in operation at Windy Standard north of Carsphairn.
Source: bbc, Date and Time of entry: 08 February 2018 00:00

©2017 Simon Mallett