Header Area Not Logged on, Max pages: 5( Seen ) ID:1969 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

Trinafour

Cansee = YES

Subscribers see an interactive map with Trinafour and local projects displayed.

Subscribe for £100 to have full access to all Hydro projects and details.


Subscribe to Hydro for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Hydro project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Trinafour (Hydro , Active)

 General Information.

Location in the UK : Scotland, Perth and Kinross    
Type of installation: Hydro    on/offshore: on
Turbines :0  Capacity : 0.5 MW
Approx Date of 1st power generation: January 1959

/YES

 Comment

Part of the Tummel Hydro Electric Power Scheme : Includes Clunie, Cuaich, Ericht, Rannoch, Cuileig, Errochty

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Trinafour DECC Reference:-na-

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Trinafour : Hydro OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
Sorry I found no matches, Please try again.

©2017 Simon Mallett

Latest News Added
Wind farm being sued by families admits its liability
The case against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd was taken by the Shivnen family and another six households in Banteer including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Cork village families settle action against wind turbine operators
The cases against Enercon Windfarm Services Ireland Ltd and Carrigcannon Wind Farm Ltd were taken by the Shivnen family and others including couples, families, and one single occupant.
Source: irishexaminer, Date and Time of entry: 22 September 2017 00:00

Lightning strikes Irish turbine
A “severe” lightning strike has destroyed a blade on an Enercon E-48 turbine at the 3.2MW Meenanilta 3 wind farm in Ireland’s north west.
Source: renews, Date and Time of entry: 20 September 2017 00:00

Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00

©2017 Simon Mallett