Header Area Not Logged on, Max pages: 5( Seen ) ID:217 Ind:1
- 5 - YESYESU WSHW: /5

the renewable exchange
Loading
Page views this IP this session = of 5 unsubscribed pages

OAKLAND Biomass Energy

Cansee = YES

Subscribers see an interactive map with OAKLAND Biomass Energy and local projects displayed.

Subscribe for £100 to have full access to all Biomass projects and details.


Subscribe to Biomass for exact generator location including nearby generators

Subscribe for £500 to include full csv downloads of all Biomass project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

OAKLAND (Biomass , Active)

 General Information.

Location in the UK : England, YO26 8LA    
Type of installation: Biomass    on/offshore: on
Turbines :1  Capacity : 4 MW
Approx Date of 1st power generation: March 2014

/YES

 Comment


Over a 12 month period Rural Energy installed nearly 4MW
of renewable heating into 26 poultry sheds on five sites in
North Yorkshire.

Following a successfull installation at Site 1, Rural Energy was approached
to supply and install biomass boilers at a further four locations, bringing the
total number of sheds being heated through renewable technology to 26.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: OAKLAND DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: OAKLAND : Biomass OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Any Comment (New: Uses Disqus)

comments powered by Disqus

Project Info
OAKLAND FARMS Biomass

MULTIPLE POULTRY SITES AT OAKLAND FARMS

Solar farm in Ashford borough given the go-ahead
Ashford Borough Council’s planning committee had turned down Haymaker Energy’s first application for land at OAKLANDs Farm in Hothfield in December, but granted planning permission for an amended scheme on Wednesday.

OAKLANDs Solar Farm
Construction of a Solar Park, to include the installation of solar panels to generate up to 11,4MW of electricity with transformer housings, security fencing and cameras, land-scaping and other associated works, and cable route/trench.

Good Energy propose new solar farm near Wareham in Purbeck - See more at: http:/
100% renewable energy suppliers Good Energy have informed us that they recently submitted a planning application for a 5.8MW solar farm at OAKLANDs Plantation, just north of Wareham, Purbeck.

©2017 Simon Mallett

Latest News Added
Lurganboy Wind Farm
The site is a complex site consisting of rock outcrops and high montane plateau with full exposure to the Atlantic.
Source: murrayassoc, Date and Time of entry: 19 September 2017 00:00

(2005) Ireland's largest wind farm opens in Co Donegal - Meentycat
The massive project has taken 11 months to complete and features some of the biggest turbines installed in Ireland or Britain.
Source: irishtimes, Date and Time of entry: 18 September 2017 00:00

£1.3m wind farm row is settled
Saporito (Wind) Ltd claimed it contracted Vestas Danish Wind Technology to build three turbines for the Anarget Wind Farm.
Source: independent.ie, Date and Time of entry: 17 September 2017 00:00

MINNIGAP WIND FARM CONNECTION
SP Energy Networks is providing the connection for the Minnygap Wind Farm situated approximately 10km South West of Moffat. The connection will be provided via an underground cable from the wind farm to the existing Bearholm substation at Moffat.
Source: sp, Date and Time of entry: 16 September 2017 00:00

PEN Y FAN WIND TURBINE PROJECT GEARS UP FOR THE BIG POUR!
This will be Sirius Renewable Energy’s 7th turbine in the fleet and will (when completed) supply discounted renewable energy (green power) to Abingdon Flooring’s on-site factory for a minimum of 15 years
Source: sirius group, Date and Time of entry: 12 September 2017 00:00

©2017 Simon Mallett