Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 2000
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 5( 1 Seen )
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian = U
Status
Tech
  Projects currently Generating
 1
  Auchtertyre Hydro 0.7 Scotland Aberdeenshire 0 / 2000 9/25/2015  
 1
  AFON IWRCH Hydro 0.36 Wales 0 / 2000  
 1
  Yanley Waste 0.945 Wales BS13 8AF Avon 1 / 2000 2/21/2017  
 1
  Todhills Waste 0.91 England CA6 4BJ Co. Durham 1 / 2000 10/19/2016  
 1
  Chavey Power Waste 0.775 England RG12 9SR Berkshire 1 / 2000 10/30/2016  
 1
  YANLEY Waste 0.945 England BS13 8AF Avon 1 / 2000  
 1
  Lendrums Bridge Wind Farm Wind 5.94 N.Ireland BT75 0LN Co. Tyrone 1 / 2000 11/24/2016  
 1
  Lendrums Bridge Wind Farm Wind 5.94 N.Ireland BT75 0LN Co. Tyrone 1 / 2000 11/24/2016  
 1
  Great Orton Wind Farm Wind 3.96 England CA5 6NL Cumbria 1 / 2000 11/18/2016  
 1
  Great Orton Wind Farm Wind 3.96 England CA5 6NL Cumbria 1 / 2000 11/18/2016  
 1
  DEEP MOOR Waste 1.95 England EX38 7JA Devon 1 / 2000 11/1/2016  
 1
  Peckfield Quarry Waste 3.922 England LS25 4DW Yorkshire 1 / 2000 11/1/2016  
 1
  Queens Park Waste 1.9 England BB10 3LB Lancashire 1 / 2000 2/20/2017  
 1
  Queens Park Waste 1.9 England BB10 3LB Lancashire 1 / 2000 2/20/2017  
 1
  LUNE POWER Waste 1.43 Wales LA1 5JR Lancashire 1 / 2000 2/20/2017  
 1
  Shearman Field Waste 1.906 England CA14 4JH Cumbria 2 / 2000 11/8/2016  
 1
  GOWY Waste 1.615 England CH2 4JP Cheshire 2 / 2000 2/21/2017  
 1
  GOWY Waste 1.615 England CH2 4JP Cheshire 2 / 2000 2/21/2017  
 1
  Baldovie Waste 8.3 Scotland DD4 0NS Tayside 3 / 2000 10/5/2016  
 1
  Sutton Waste 3 England NG17 1HK Nottinghamshire 3 / 2000 10/22/2016  
 1
  Lowca Wind Farm Wind 4.62 England CA14 5RU Cumbria 3 / 2000 11/15/2016  
 1
  Salt Ayre Waste 4 England LA1 5JS Lancashire 3 / 2000 10/16/2016  
 1
  Holiday Moss Waste 2.905 England WA11 8PG Merseyside 4 / 2000 11/8/2016  
 1
  Holiday Moss Waste 2.905 England WA11 8PG Merseyside 4 / 2000 11/8/2016  
 1
  Lackford Waste 1.17 England IP28 6HJ Suffolk 4 / 2000 11/1/2016  
 1
  High Heavens Waste 1.92 England SL7 3DJ Buckinghamshire 4 / 2000 12/16/2016  
 1
  Kirkheaton Delete 1.8 Wales 5 / 2000  
 1
  Kirkheaton Wind Farm Wind 1.8 England NE19 2DQ Northumberland 5 / 2000 2/24/2015  
 1
  Blyth Wind Farm Wind 4 England Humberside 6 / 2000 10/21/2016  
 1
  WILNECOTE Waste 1.86 England B77 1LT Staffordshire 6 / 2000 11/18/2016  
 1
  Blyth Wind Farm Wind 4 England Humberside 6 / 2000 10/21/2016  
 1
  Greenoakhill Waste 3.94 Scotland G71 7SQ Strathclyde 6 / 2000 10/17/2016  
 1
  Brazier Waste 3.88 England SG12 0AP Hertfordshire 6 / 2000 10/17/2016  
 1
  Mucking Waste 3.88 England SS17 ORN Essex 7 / 2000 10/9/2016  
 1
  Mucking Waste 3.88 England SS17 ORN Essex 7 / 2000 10/9/2016  
 1
  Somerton Wind Farm Wind 1.5 England Norfolk 7 / 2000 5/30/2016  
 1
  Shakespeare Farm Waste 0.96 England ME3 8RN Kent 8 / 2000 11/8/2016  
 1
  Lambrigg Wind Farm Wind 6.5 England SL8 5AJ Cumbria 9 / 2000 10/23/2014  
 1
  Beighton Waste 0.988 England S12 2AY Yorkshire 10 / 2000 10/8/2016  
 1
  Sigurd Wind Farm Wind 1.3 Scotland Orkney 11 / 2000 10/13/2016  
 1
  Brookhurst Waste 2.552 England RH2 4QD Sussex 11 / 2000 10/15/2016  
 1
  Brookhurst Waste 2.552 England RH2 4QD Sussex 11 / 2000 10/15/2016  
 1
  Goosey Biomass 16 England NN10 9LU Bedfordshire 12 / 2000 5/8/2017  
 1
  Burradale Wind Farm Wind 3.68 Scotland ZE29SB Shetland 12 / 2000 1/1/2017  
 1
  Ely Power Station Biomass 38 Wales 12 / 2000  
 9
  Vine Street Delete 9.5 England West Yorkshire 1 / 2000 10/5/2016  
 9
  Seamer Delete 1.33 England YO12 4QA North Yorkshire 3 / 2000 2/20/2017  
 9
  Brookhurst Wood Delete 2 England RH12 4QD West Sussex 12 / 2000 10/29/2016  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Energy firm reveals proposals for solar farm near Loughborough Read more at http
The proposed site, at Mill Farm, in Nottingham Road, is currently used for grazing. It would house rows of solar panels for up to 25 years.
Source: leicestermercury, Date and Time of entry: Tuesday, June 27, 2017 00:00

DEAL TO COMBINE WIND AND TIDAL POWER OUTPUT
Lochend has reached agreement with MeyGen to allow these wind turbines to deliver electricity to the grid whenever the MeyGen tidal project is not making full use of the available export capacity.
Source: atlantisresourcesltd, Date and Time of entry: Friday, June 23, 2017 00:00

Three new Wind Turbines approved near Ottringham
THREE 50m HIGH wind turbines are to be constructed just South of Ottringham (on land North West of Far Marsh Farm, Marsh Road).
Source: hu12online, Date and Time of entry: Friday, June 23, 2017 00:00

Decision casts doubt over turbine project
Local farmer James Gammie applied to build three of the 80m high structures on neighbouring plots of land at Gawnsmoss, Gledsgreen and Cairnhill.
Source: banffshire-journal, Date and Time of entry: Friday, June 23, 2017 00:00

500kW Turbine Commissioned at Lawrence Landfill
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill,
Source: windenergydirect, Date and Time of entry: Friday, June 23, 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.