Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1999
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0
1 - 10 - YES
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  JUDKINS Waste 2.73 England CV10 0HU Warwickshire 1 / 1999 28/10/2016  
 1
  Burnt Stump Waste 0.963 England NG5 8PR Nottinghamshire 1 / 1999 18/10/2016  
 1
  Whinney Hill Waste 2.7 England BB5 6NN Lancashire 1 / 1999 29/10/2016  
 1
  Bernard Road Waste 2.1 England S4 7YX Yorkshire 1 / 1999 12/12/2016  
 1
  HILL AND MOOR Waste 3.38 England WR10 2PW Worcestershire 3 / 1999 28/10/2016  
 1
  Boston Waste 1.275 England PE21 7AA Lincolnshire 3 / 1999 01/11/2016  
 1
  BURNTSTUMP Waste 1.8 England NG5 8PR Nottinghamshire 4 / 1999 08/10/2016  
 1
  Royal Seaforth Dock Wind Farm Wind 3.6 England L20 1BG Merseyside 4 / 1999 17/06/2016  
 1
  Beinn Ghlas Wind Farm Wind 8.4 Scotland PA35 1HY Argyllshire 5 / 1999 11/10/2016  
 1
  Thetford Biomass 38.5 England Norfolk 6 / 1999 06/10/2016  
 1
  Enderby Warren Waste 4.875 England LE9 5AL Leicestershire 6 / 1999 06/10/2016  
 1
  Far Old Park Wind Farm Wind 4.62 England LA16 7UD Cumbria 7 / 1999 15/11/2016  
 1
  Summerston Waste 2.78 Scotland G23 5HD Strathclyde 7 / 1999 28/10/2016  
 1
  ECOTECH Wind Farm Wind 1.47 England PE37 7HT Norfolk 8 / 1999 27/02/2016  
 1
  Bromborough Waste 2.95 England L62 4SQ Cheshire 9 / 1999 18/05/2017  
 1
  Station Farm Waste 1.956 England PE18 9UH Cambridgeshire 9 / 1999 11/11/2016  
 1
  EcoTech Wind Farm Wind 1.5 England PE37 7HT Norfolk 10 / 1999 21/02/2016  
 1
  Ufton Waste 0.93 Wales CV33 9PP Warwickshire 11 / 1999 20/02/2017  
 1
  Croesor Hydro 0.5 Scotland LL48 655 Aberdeenshire 11 / 1999 30/09/2016  
 1
  Beeston Weir Hydro 1.66 England NG11 8NB Nottinghamshire 12 / 1999 05/01/2017  
 1
  Winscales Wind Farm Wind 7.3 England CA14 4JG Cumbria 12 / 1999 18/11/2016  
 1
  Tarn Bank Wind Farm Wind 0.845 England CA14 4JG Cumbria 12 / 1999 05/01/2017  
 9
  Askam Delete 2.303 England LA16 7UD Cumbria 7 / 1999 15/11/2016  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Clayhill the UKs first subsidy-free solar farm
Clayhill solar farm, located in Milton Keynes, was officially opened on 26 September 2017 by Claire Perry MP, the UK Minister for Climate Change & Industry.
Source: anesco, Date and Time of entry: 15 October 2017 00:00

Triodos banks on UK solar with 18 million double refinancing package
The two sites in question are the 15.1MW Stokes Marsh solar farm in Coulston, Wiltshire, and the 5MW Stoneshill solar farm in Exeter.
Source: spp, Date and Time of entry: 15 October 2017 00:00

Inside ClayHill, the UKs first subsidy-free solar farm
At 10MW in size, Clay Hill Solar Farm is the UKs first built in the absence of any government support. Construction started roughly two months after the Renewables Obligation slammed shut and long after the eligibility window closed.
Source: spp, Date and Time of entry: 15 October 2017 00:00

IRELAND: Nordex wins a 17.5MW order from ABO Wind
The deal is for seven N90/2500 turbines and a five-year service contract. The turbines will go to 15MW Gibbett Hill wind farm and 2.5MW Glenough 2 wind farm.
Source: windpower, Date and Time of entry: 13 October 2017 00:00

TOURNAFULLA
Airtricity began construction of this 18 turbine site in April 2006.
Source: sse, Date and Time of entry: 12 October 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.