List of major Renewable Energy Schemes in the UK going live in 1995
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 54.82.79.137
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Blantyre Hydro 0.575 Scotland G72 9BX East Lothian 0 / 1995 30/09/2016  
 1
  Rigged Hill Wind Farm Wind 5 N.Ireland Co. Londonderry 3 / 1995 18/11/2016  
 1
  Borrowash Mill Hydro 0.179 England DE72 3LJ Derbyshire 4 / 1995 05/01/2017  
 1
  ElliotsHill Wind Farm Wind 5 N.Ireland Co. Antrim 4 / 1995 03/12/2017  
 1
  Four Burrows Wind Farm Wind 4.5 England Cornwall 5 / 1995 31/03/2016  
 1
  Distington Landfill Waste 1.778 England CA15 4JY Cumbria 6 / 1995 01/11/2016  
 1
  BUTCHERSFIELD Waste 2.874 England WA3 6EW Cheshire 10 / 1995 11/03/2016  
 1
  Old Walls Hydro 0.076 England TQ13 7PN Devon 12 / 1995 05/01/2017  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Norfolk Vanguard
The 1.8 gigawatt (GW) capacity project would meet the equivalent electricity needs of 5% of UK households* - around 1.3 million homes.
Source: vattenfall, Date and Time of entry: 16 November 2018 00:00

Tangy Repower
In August 2018, SSE submitted a Section 36 Application to Scottish Ministers seeking consent to replace the existing 22 operational turbines for 16 modern, more efficient machines.
Source: sse, Date and Time of entry: 16 November 2018 00:00

Plans to expand Crystal Rig wind farm lodged
A bid has been lodged to expand a wind farm in the Lammermuir Hills, taking its turbine total to more than 100.
Source: bbc, Date and Time of entry: 16 November 2018 00:00

Extra 11 turbines at Crystal Rig wind farm
Fred Olsen Ltd, has submitted an application to the Scottish Government’s Energy Consents Unit for an additional 11 turbines to the south of the current wind farm site that has 91 turbines, developed in three separate stages.
Source: berwickshire news, Date and Time of entry: 16 November 2018 00:00

Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (‘the Variation Application’)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.