Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1993
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 5( Seen )
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   YES
session(showworking) = librarian = U
Status
Tech
  Projects currently Generating
 1
  Holsworthy Waste 2.3 England EX22 7HH Devon 0 / 1993 2/21/2017  
 1
  Blyth Harbour Wind Farm Wind 2.7 England NE24 1SE Northumberland 1 / 1993 11/16/2016  
 1
  Blyth Harbour Wind Farm Wind 2.7 England NE24 1SE Northumberland 1 / 1993 11/16/2016  
 1
  Rowley Waste 1.85 England Lancashire 1 / 1993 2/15/2017  
 1
  Cold Northcott Wind Farm Wind 6.8 England PL15 8PR Cornwall 4 / 1993 10/17/2014  
 1
  Milton Waste 2 England Cambridgeshire 7 / 1993  
 1
  Taff Ely Wind Farm Wind 9 Wales Rhondha Cynon Taff 8 / 1993 2/21/2016  
 1
  Taff Ely Wind Farm Wind 9 Wales Rhondha Cynon Taff 8 / 1993 2/21/2016  
 1
  Kirkby Moor Wind Farm Wind 4.8 England Cumbria 9 / 1993 2/6/2015  
 1
  Glanford Biomass 13.5 England DN15 8SB Yorkshire 11 / 1993 3/7/2016  
 1
  Royd Moor Wind Farm Wind 6.5 England Yorkshire 11 / 1993 6/25/2015  
 1
  SELCHP Waste 35 England SE14 5RS London 12 / 1993 10/5/2016  
  Projects planning approved and / or under construction
 2
  Ovenden Moor Wind Farm Wind 9.2 England West Yorkshire 6 / 1993 7/12/2016  
 2
  Ovenden Moor Wind Farm Wind 9.2 England West Yorkshire 6 / 1993 7/12/2016  
 6
  Goonhilly Downs Wind Farm Wind 0 England Cornwall 4 / 1993  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Energy firm reveals proposals for solar farm near Loughborough Read more at http
The proposed site, at Mill Farm, in Nottingham Road, is currently used for grazing. It would house rows of solar panels for up to 25 years.
Source: leicestermercury, Date and Time of entry: Tuesday, June 27, 2017 00:00

DEAL TO COMBINE WIND AND TIDAL POWER OUTPUT
Lochend has reached agreement with MeyGen to allow these wind turbines to deliver electricity to the grid whenever the MeyGen tidal project is not making full use of the available export capacity.
Source: atlantisresourcesltd, Date and Time of entry: Friday, June 23, 2017 00:00

Three new Wind Turbines approved near Ottringham
THREE 50m HIGH wind turbines are to be constructed just South of Ottringham (on land North West of Far Marsh Farm, Marsh Road).
Source: hu12online, Date and Time of entry: Friday, June 23, 2017 00:00

Decision casts doubt over turbine project
Local farmer James Gammie applied to build three of the 80m high structures on neighbouring plots of land at Gawnsmoss, Gledsgreen and Cairnhill.
Source: banffshire-journal, Date and Time of entry: Friday, June 23, 2017 00:00

500kW Turbine Commissioned at Lawrence Landfill
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill,
Source: windenergydirect, Date and Time of entry: Friday, June 23, 2017 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.