Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1935
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.238.147.211
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Carsfad Hydro 12 Scotland DG7 3ST Dumfries & Galloway 1 / 1935 24/11/2017  
 1
  Earlstoun Hydro 14 Scotland DG7 35R Dumfries & Galloway 1 / 1935 24/11/2017  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

New 22-turbine Highlands wind farm to generate 9m a year in community benefits
The Scot-Govt. has given the planning go-ahead to construction of the 22 turbine Creag Riabhach farm on the Altnaharra Estate, near Lairg, in the North Highlands.
Source: scottishenergynews, Date and Time of entry: 26 November 2020 00:00

Planning Committee Report LA01/2018/1151/F
Proposed amendment to the overall tip height of the consented Evishagaran Wind Farm (B/2013/0120/F / 2014/A0169) to a maximum tip height of 140m;
Date and Time of entry: 26 November 2020 00:00

Turbines going up at 35m wind farm
INVERCLYDE'S skyline is changing as the first of eight massive wind turbines is installed in the hills above Greenock.
Source: greenocktelegraph, Date and Time of entry: 25 November 2020 00:00

MASSIVE Blades For Inverclyde Windfarm Turbines Start Arriving
THE first convoys carrying huge turbine blades for a windfarm being built in the hills near Greenock travelled to the area today (Tuesday). Two trucks escorted by police motorbikes travelled to the site from King George V Dock in Glasgow.
Date and Time of entry: 25 November 2020 00:00

The next frontier of wind power
A new report starkly sets out the shortcomings of Britain's role in the supply chain, while other countries surge ahead. It recommends government action to back the industry, and to counteract the risks from Brexit.
Source: bbc, Date and Time of entry: 25 November 2020 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.