Sorry I found no matches, Please try again. 176
vid = 77pws_id = 352837pws_id = 352837
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.235.140.73 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Burbo Bank Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Burbo Bank Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Burbo Bank Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Merseyside    
Type of installation: Wind    on/offshore: off
Turbines :25  Capacity : 90 MW
Approx Date of 1st power generation: October 2007

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Burbo Bank Extension offshore wind farm was awarded an agreement for lease by The Crown Estate on 11 May 2010. This will extend the existing Burbo Bank offshore wind farm by a further 258 MW (approximately).

Emerson Network Power are supplying the critical infrastructure for the substations, UPS etc

Burbo Bank Extension to use Vestas V164 8MW

69 wind turbines to be added to the existing scheme (agreed)

The Burbo 90MW offshore wind farm uses Siemens 3.6MW turbines, the largest yet to be installed in UK waters. The Dong Energy project which starts generation in October was developed by Wind Prospect.

Vestas aims to start serial production of 80 metre blades in the second quarter of 2015, which will be used for the new 8MW turbine that has provisionally been chosen for Dong Energy’s Burbo Bank extension project in Liverpool Bay.

​The Burbo Bank Extension offshore wind farm was awarded an agreement for lease by The Crown Estate on 11 May 2010. This will extend the existing Burbo Bank offshore wind farm by a further 258 MW (approximately).

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Burbo Offshore Windfarm North Wirral and Liverpool Coastline England

 Associated Companies.

Relationship Company (For: Burbo Bank )
DeveloperDONG Energy UK
OwnerDONG Energy UK
OperatorDONG Energy UK
InstallerEmerson
DeveloperWind Prospect

 DECC Data on this Project: Burbo Bank :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Burbo Bank Extension (Burbo Bank 2)     258 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: The Planning Inspectorate - National Infrastructure
Site ID and Reference: 2539 / AA066     District:
Applicant: Orsted (formerly Dong Energy)     Application : EN010026 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 32 Turbine Capacity: 8
Height of Turbines: Calculated capacity: 256
Site Address: Burbo Flats, Liverpool Bay, approximately 6.4km (4.0 miles) from the Sefton coastline and 7.2km (4.5 miles) from North Wirral.
 
County: Offshore Region: Offshore
OS Coordinates: 315815 / 315815
Development Status: Operational
Application Submitted: 3/22/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/10/2016    
Generator Live 4/27/2017 This Record Last Updated: 5/2/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Burbo Bank     90 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: DECC (S36)
Site ID and Reference: 2487 / N00445W     District:
Applicant: Orsted (formerly Dong Energy)     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 25 Turbine Capacity: 3.6000000000000001
Height of Turbines: Calculated capacity: 90
Site Address: Burbo Flats, Liverpool Bay, approximately 6.4km (4.0 miles) from the Sefton coastline and 7.2km (4.5 miles) from North Wirral.
 
County: Offshore Region: Offshore
OS Coordinates: 321476 / 321476
Development Status: Operational
Application Submitted: 4/12/2002 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2006    
Generator Live 10/18/2007 This Record Last Updated: 2/27/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Burbo Bank: Wind :

Site Name: Burbo Offshore Windfarm - A (31/01/07)
Generator Type: Off-shore wind (RO code = RP)
Scheme : RO Generator ID: R00008RPEN
Capacity: 90000 Status: Live
Accreditation Date: 4/12/2002    
Commission Date: 7/1/2007    
Applicant: SeaScape Energy Ltd
Applicant Address: C/O DONG Energy A.C. Meyers Vaenge 9 2450 Copenhagen SV Denmark na
Address: Burbo Offshore Windfarm- A (31/01/07) 6.4 kM from the North Wirral and Liverpool Coastli England

Site Name: Burbo Offshore Windfarm - A (31/01/07)
Generator Type: Off-shore wind (REGO code = FW)
Scheme : REGO Generator ID: G01152FWEN
Capacity: 90000 Status: Live
Accreditation Date: 4/12/2002    
Commission Date: 7/1/2007    
Applicant: SeaScape Energy Ltd
Applicant Address: C/O DONG Energy A.C. Meyers Vaenge 9 2450 Copenhagen SV Denmark na
Address: Burbo Offshore Windfarm- A (31/01/07) 6.4 kM from the North Wirral and Liverpool Coastli England
 
Assumptions: Capacity: 90000kW 90 MW,
Thus over the month Capacity * 720 hours per month = 64800 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 19828 22.03% Issued
01/03/2018 25419 28.24% Issued
01/02/2018 25894 28.77% Issued
01/01/2018 37552 41.72% Issued
01/12/2017 28325 31.47% Issued
01/11/2017 4014 4.46% Issued
01/09/2017 17865 19.85% Issued
01/08/2017 17296 19.22% Issued
01/07/2017 15148 16.83% Issued
01/06/2017 20858 23.18% Issued
01/05/2017 14866 16.52% Issued
01/04/2017 10192 11.32% Issued
01/04/2017 10000 11.11% Retired
01/03/2017 2768 3.08% Redeemed
01/03/2017 20295 22.55% Redeemed
01/02/2017 3334 3.70% Redeemed
01/02/2017 24448 27.16% Retired
01/01/2017 22717 25.24% Retired
01/01/2017 3098 3.44% Redeemed
Dec-16 037136 24758 27.51% Issued
Nov-16 036461 21391 23.77% Retired
Oct-16 022461 14974 16.64% Issued
Sep-16 032134 21423 23.80% Issued
Aug-16 034322 22881 25.42% Issued
Jul-16 029464 15643 17.38% Issued
Jul-16 029464 19643 21.83% Issued
May-16 022281 14854 16.50% Issued
Jan-16 056514 36546 40.61% Issued
Dec-15 069325 46217 51.35% Retired
Nov-15 056814 37876 42.08% Retired
Oct-15 025300 16867 18.74% Retired
Sep-15 020707 13805 15.34% Retired
Aug-15 026586 17724 19.69% Retired
Jul-15 2465036975 3698 4.11% Redeemed
Jun-15 1865027976 8207 9.12% Redeemed
May-15 3151347270 13866 15.41% Redeemed
Apr-15 1841427421 2762 3.07% Redeemed
Mar-15 3075646134 20607 22.90% Redeemed
Feb-15 2417136257 16195 17.99% Redeemed
Jan-15 59742 13143 14.60% Redeemed
Dec-14 59468 26561 29.51% Redeemed
Nov-14 2309534642 7621 8.47% Redeemed
Oct-14 3159047386 21165 23.52% Redeemed
Sep-14 741710941 2448 2.72% Redeemed
Aug-14 3016445246 9954 11.06% Redeemed
Jul-14 1300719511 8714 9.68% Redeemed
Jun-14 790811765 5299 5.89% Redeemed
May-14 1755726336 5793 6.44% Redeemed
Apr-14 1958629379 13123 14.58% Redeemed
Mar-14 2927343910 1756 1.95% Retired
Feb-14 4000260003 2400 2.67% Redeemed
Jan-14 3429451442 26406 29.34% Redeemed
Dec-13 3934259012 6687 7.43% Redeemed
Nov-13 2723340850 1512 1.68% Redeemed
Oct-13 3539353089 27252 30.28% Redeemed
Sep-13 2099431492 1259 1.40% Redeemed
Aug-13 1904228563 1142 1.27% Redeemed
Jul-13 909313525 1545 1.72% Redeemed
Jun-13 1831727474 3114 3.46% Redeemed
May-13 2086231293 3546 3.94% Redeemed
Apr-13 2801142017 1680 1.87% Redeemed
Mar-13 2237833567 22378 24.86% Expired
Feb-13 2334235013 23342 25.94% Expired
Jan-13 2793141895 27930 31.03% Expired
Dec-12 3369050536 33690 37.43% Expired
Nov-12 2616139242 26161 29.07% Redeemed
Oct-12 2234233513 22342 24.82% Redeemed
Sep-12 2796441946 27964 31.07% Redeemed
Aug-12 1790026850 17900 19.89% Redeemed
Jul-12 1801727024 18016 20.02% Redeemed
Jun-12 2177832668 21779 24.20% Redeemed
May-12 1065615984 10656 11.84% Redeemed
Apr-12 1028715430 10287 11.43% Redeemed
Mar-12 1554823322 13060 14.51% Redeemed
Feb-12 2254533818 18937 21.04% Redeemed
Jan-12 3013345200 25311 28.12% Redeemed
Dec-11 3849757745 32338 35.93% Redeemed
Nov-11 2822342335 23708 26.34% Redeemed
Oct-11 3285549282 27599 30.67% Redeemed
Sep-11 2791841877 23451 26.06% Redeemed
Aug-11 1795826937 15084 16.76% Redeemed
Jul-11 1385620655 2217 2.46% Expired
Jun-11 1848127722 15524 17.25% Redeemed
May-11 3643154646 5829 6.48% Expired
Apr-11 1747126207 3076 3.42% Redeemed
Mar-11 1268118816 12681 14.09% Redeemed
Feb-11 2788141822 27881 30.98% Redeemed
Jan-11 2091031365 20910 23.23% Redeemed
Dec-10 1721325819 17213 19.13% Redeemed
Nov-10 2383835757 23838 26.49% Redeemed
Oct-10 2163232448 21632 24.04% Redeemed

 Calculations


Capacity: 200
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/29/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 200 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352837

Project Info
BURBO BANK
Wind turbines thought to be the largest in the world have started generating electricity off the Merseyside coast.

World’s largest wind turbines may double in size before 2024
17/05/2017 Dong Energy will officially open the second phase of its giant BURBO BANK Extension offshore wind farm off the coast of Merseyside coast later today by showcasing its 8MW turbines, the largest ever used.

The world's biggest wind turbine: Vestas V164
Dong Energy will be the first to install the wind turbines at its BURBO BANK wind farm off the coast of Britain in the Irish Sea. Pictured is a prototype in Denmark

BURBO BANK Website

BURBO BANK Wind Farm Extension

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School