Sorry I found no matches, Please try again.
Burbo Bank Wind Farm Sorry I found no matches, Please try again.
vid = 77pws_id = 352837pws_id = 352837
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.231.166.56YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Burbo Bank Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Burbo Bank Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Burbo Bank Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Merseyside    
Type of installation: Wind    on/offshore: off
Turbines :25  Capacity : 90 MW
Approx Date of 1st power generation: October 2007

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Burbo Bank Extension offshore wind farm was awarded an agreement for lease by The Crown Estate on 11 May 2010. This will extend the existing Burbo Bank offshore wind farm by a further 258 MW (approximately).

Emerson Network Power are supplying the critical infrastructure for the substations, UPS etc

Burbo Bank Extension to use Vestas V164 8MW

69 wind turbines to be added to the existing scheme (agreed)

The Burbo 90MW offshore wind farm uses Siemens 3.6MW turbines, the largest yet to be installed in UK waters. The Dong Energy project which starts generation in October was developed by Wind Prospect.

Vestas aims to start serial production of 80 metre blades in the second quarter of 2015, which will be used for the new 8MW turbine that has provisionally been chosen for Dong Energys Burbo Bank extension project in Liverpool Bay.

​The Burbo Bank Extension offshore wind farm was awarded an agreement for lease by The Crown Estate on 11 May 2010. This will extend the existing Burbo Bank offshore wind farm by a further 258 MW (approximately).

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Burbo Bank DECC Reference:N00445W

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Burbo Bank : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 100
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 08/03/2021
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 100 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352837


Weather Station Name : Noctorum Latitude: 53.3864 Longitude: -3.0724 Elevation: 27

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00SSE 2 5 / 25 0
12/07/2018 12:00:00SE 4 5 / 25 0
12/07/2018 15:00:00ENE 2 5 / 25 0
12/07/2018 18:00:00NNW 7 5 / 25 0
12/07/2018 21:00:00NNW 7 5 / 25 0
13/07/2018NNW 4 5 / 25 0
13/07/2018 03:00:00SW 4 5 / 25 0
13/07/2018 06:00:00S 7 5 / 25 0
13/07/2018 09:00:00S 7 5 / 25 0
13/07/2018 12:00:00SSW 4 5 / 25 0
13/07/2018 15:00:00NW 9 5 / 25 0
13/07/2018 18:00:00NW 7 5 / 25 0
13/07/2018 21:00:00WNW 4 5 / 25 0
14/07/2018WNW 4 5 / 25 0
14/07/2018 03:00:00W 4 5 / 25 0
14/07/2018 06:00:00SW 2 5 / 25 0
14/07/2018 09:00:00SW 2 5 / 25 0
14/07/2018 12:00:00NW 4 5 / 25 0
14/07/2018 15:00:00NW 9 5 / 25 0
14/07/2018 18:00:00NW 7 5 / 25 0
14/07/2018 21:00:00NW 4 5 / 25 0
15/07/2018SW 4 5 / 25 0
15/07/2018 03:00:00SSW 4 5 / 25 0
15/07/2018 06:00:00SSW 4 5 / 25 0
15/07/2018 09:00:00WSW 4 5 / 25 0
15/07/2018 12:00:00W 7 5 / 25 0
15/07/2018 15:00:00NW 9 5 / 25 0
15/07/2018 18:00:00NW 9 5 / 25 0
15/07/2018 21:00:00WNW 7 5 / 25 0
16/07/2018W 4 5 / 25 0
16/07/2018 03:00:00SW 4 5 / 25 0
16/07/2018 06:00:00SW 7 5 / 25 0
16/07/2018 09:00:00W 7 5 / 25 0
16/07/2018 12:00:00NW 9 5 / 25 0
16/07/2018 15:00:00NW 11 5 / 25 0
16/07/2018 18:00:00NW 9 5 / 25 0
16/07/2018 21:00:00NW 9 5 / 25 0
Project Info
BURBO BANK
Wind turbines thought to be the largest in the world have started generating electricity off the Merseyside coast.

Worlds largest wind turbines may double in size before 2024
17/05/2017 Dong Energy will officially open the second phase of its giant BURBO BANK Extension offshore wind farm off the coast of Merseyside coast later today by showcasing its 8MW turbines, the largest ever used.

The world's biggest wind turbine: Vestas V164
Dong Energy will be the first to install the wind turbines at its BURBO BANK wind farm off the coast of Britain in the Irish Sea. Pictured is a prototype in Denmark

BURBO BANK Website

BURBO BANK Wind Farm Extension

©2018 Simon Mallett
Latest News Added
Italys Eni to buy 20% stake in worlds largest offshore wind farm
Eni will now take a share of Dogger Bank A & Dogger Bank B, which will have a combined capacity of 2.4 gigawatts when fully operational. Upon completion of the deal, Equinor and SSEs share in Dogger Bank A & B will still amount to 40% each.
Date and Time of entry: 21 December 2020 00:00

14 MW GE Haliade-X for Third Phase
GE Renewable Energy has secured a preferred turbine supplier contract to provide its 14 MW Haliade-X turbine for the third phase Dogger Bank C offshore wind project.
Source: offshorewind, Date and Time of entry: 21 December 2020 00:00

EDF submits planning permission for first 50MW UK solar farm
EDF Renewables' 49.9MW Sutton Bridge solar farm has taken another step forward as its planning application goes before South Holland District Council.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with 49.9MW site planned
EDF Renewables is looking to develop a 49.9MW solar farm at Tye Lane near Bramford. The farm if granted planning permission would provide a community fund of up to 10,000 annually for its 35-year lifetime.
Source: spp, Date and Time of entry: 17 December 2020 00:00

EDF continues solar push with another 50MW site announced
It is planning to develop the solar farm Bloys Grove on a site between the villages of Swainsthorpe and Mulbarton, just south of Norwich, in South Norfolk.
Source: spp, Date and Time of entry: 17 December 2020 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School