vid = 59pws_id = 351674pws_id = 351674
--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:4247 Ind:1 IP: 52.14.253.170 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Blood Hill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Blood Hill Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Blood Hill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Norfolk    
Type of installation: Wind    on/offshore: on
Turbines :10  Capacity : 2.25 MW
Approx Date of 1st power generation: December 1992

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Comment from user (Thanks) The ten .2Mw turbines have gone, so it looks as though the 10 x .2Mw turbines have been replaced by 2 x .6Mw machines.

Blood Hill is a wind farm near Hemsby in Norfolk, England. It is the smallest windfarm owned by E.ON; taking up 3 hectares. It has a nameplate capacity of 2.25MW which is enough to power 1000 homes at peak.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Blood Hill nr. Coronation Farm Somerton Great Yarmouth Norfolk

 Associated Companies.

Relationship Company (For: Blood Hill )
DeveloperE.on UK
OperatorE.on UK
OwnerE.on UK

 DECC Data on this Project: Blood Hill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Bloodhills - repowering     1 MW
Energy Type: Wind Onshore
County: Norfolk     Country: England     LPA: Great Yarmouth Borough Council
Site ID and Reference: 3924 / C1356     District:
Applicant: The Farm Energy Partnership LLP     Application : 06/13/0093/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 0.5
Height of Turbines: Calculated capacity: 1
Site Address: Bloodhills Farm, Bloodhills East Somerton Great Yarmouth NR29 4DU
 
County: Norfolk Region: Eastern
OS Coordinates: 647642 / 647642
Development Status: Operational
Application Submitted: 2/12/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/15/2014    
Generator Live 6/15/2015 This Record Last Updated: 11/25/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Blood Hill Wind Farm     2.3 MW
Energy Type: Wind Onshore
County: Norfolk     Country: England     LPA: Great Yarmouth Borough Council
Site ID and Reference: 3358 / 01018W4     District:
Applicant: ECONET LTD     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 0.14999999999999999
Height of Turbines: Calculated capacity: 1.5
Site Address: Blood Hill nr. Coronation Farm , Somerton , Great Yarmouth , Norfolk
 
County: Norfolk Region: Eastern
OS Coordinates: 646900 / 646900
Development Status: Decommissioned
Application Submitted: 3/17/1998 Planning Permission Granted
Application Determined: Permission refused: 8/6/1999
Construction Date:    
Generator Live 7/24/2000 This Record Last Updated: 1/9/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/6/1999

 OFGEM Data on this Project: Blood Hill: Wind :

Site Name: Blood Hill Wind Farm - A
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00041RQEN
Capacity: 2250 Status: Live
Accreditation Date: 3/17/1998    
Commission Date: 9/1/1992    
Applicant: Burnley Energy LLP
Applicant Address: The Brick Barn Court Road BIRCHINGTON CT7 0PT England
Address: Blood Hill Wind Farm East SomertonEast SomertonNorfolk England

Site Name: Blood Hill Wind Farm - A
Generator Type: Wind
Scheme : REGO Generator ID: G00502NWEN
Capacity: 2250 Status: Live
Accreditation Date: 3/17/1998    
Commission Date: 9/1/1992    
Applicant: Burnley Energy LLP
Applicant Address: The Brick Barn Court Road BIRCHINGTON CT7 0PT England
Address: Blood Hill Wind Farm East SomertonEast SomertonNorfolk England
 
Assumptions: Capacity: 2250kW 2.25 MW,
Thus over the month Capacity * 720 hours per month = 1620 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
Jan-14 428428 427 18.98% Redeemed
Dec-13 359360 1 0.04% Expired
Nov-13 293292 292 12.98% Redeemed
Oct-13 425425 425 18.89% Redeemed
Sep-13 223221 222 9.87% Redeemed
Aug-13 135133 135 6.00% Redeemed
Jul-13 8784 1 0.04% Redeemed
Jun-13 209206 208 9.24% Redeemed
May-13 298298 298 13.24% Redeemed
Apr-13 374376 376 16.71% Redeemed
Mar-13 475475 475 21.11% Redeemed
Feb-13 318318 318 14.13% Redeemed
Jan-13 323320 323 14.36% Redeemed
Dec-12 436436 436 19.38% Redeemed
Nov-12 292292 292 12.98% Redeemed
Oct-12 252252 253 11.24% Redeemed
Sep-12 234233 234 10.40% Redeemed
Aug-12 153151 153 6.80% Redeemed
Jul-12 115112 115 5.11% Redeemed
Jun-12 295295 295 13.11% Redeemed
May-12 218220 220 9.78% Redeemed
Apr-12 304303 303 13.47% Redeemed
Mar-12 163161 163 7.24% Redeemed
Feb-12 370370 370 16.44% Redeemed
Jan-12 449449 449 19.96% Redeemed
Dec-11 620620 620 27.56% Redeemed
Nov-11 337337 337 14.98% Redeemed
Oct-11 378378 378 16.80% Redeemed
Sep-11 307307 307 13.64% Redeemed
Aug-11 163161 162 7.20% Redeemed
Jul-11 228228 228 10.13% Redeemed
Jun-11 192192 192 8.53% Redeemed
May-11 338337 337 14.98% Redeemed
Apr-11 240238 240 10.67% Redeemed
Mar-11 205204 206 9.16% Redeemed
Feb-11 401401 401 17.82% Redeemed
Jan-11 326326 326 14.49% Redeemed
Dec-10 302301 301 13.38% Redeemed
Nov-10 383383 383 17.02% Redeemed
Oct-10 285285 285 12.67% Redeemed

 Calculations


Capacity: 4.5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/19/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.5 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351674

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School