Sorry I found no matches, Please try again. 176
vid = 5639pws_id = 322049pws_id = 322049
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.134.104.173 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Hawton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Hawton Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Hawton Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, NG24 3SD    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 7.5 MW
Approx Date of 1st power generation: February 2017

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

11/01588/FULM | Erection of 3no wind turbines of height between 105m and 126.5m to tip and associated infrastructure including access tracks, 1 switchgear and control building with transformers and grid connection infrastructure, underground cabling, turbine foundations, crane hardstandings, 1 new access point and 1 meteorological mast. | Meteorological Mast Field 6597 SK480350 Cotham Road Hawton Nottinghamshire

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Hawton Wind Farm Cotham Lane Hawton Newark NG24 3SD England

 Associated Companies.

Relationship Company (For: Hawton )
DeveloperTemporis Capital LLP
OwnerTemporis Capital LLP
OperatorTemporis Capital LLP

 DECC Data on this Project: Hawton :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hawton Wind Farm     9 MW
Energy Type: Wind Onshore
County: Nottinghamshire     Country: England     LPA: Newark and Sherwood District Council
Site ID and Reference: 4532 / AA590     District:
Applicant: Temporis Capital     Application : 11/01588/FULM (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 7.5
Site Address: Cotham Road, Hawton, Nottinghamshire
  NG24 3SD
County: Nottinghamshire Region: East Midlands
OS Coordinates: 479589 / 479589
Development Status: Operational
Application Submitted: 12/5/2011 Planning Permission Granted
Application Determined: Permission refused: 8/22/2012
Construction Date: 9/16/2016    
Generator Live 3/16/2017 This Record Last Updated: 10/31/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 9/29/2017    
Secretary of State - Appeal Lodged: 10/10/2012
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/22/2012

 OFGEM Data on this Project: Hawton: Wind :

Site Name: Newark Windfarm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00407RQEN
Capacity: 5935 Status: Live
Accreditation Date: 12/5/2011    
Commission Date: 2/21/2017    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Hawton Wind Farm Cotham Lane Hawton Newark NG24 3SD England

Site Name: Newark Windfarm
Generator Type: Wind
Scheme : REGO Generator ID: G03028NWEN
Capacity: 5935 Status: Live
Accreditation Date: 12/5/2011    
Commission Date: 2/21/2017    
Applicant: Temporis Capital LLP
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Hawton Wind Farm Cotham Lane Hawton Newark NG24 3SD England
 
Assumptions: Capacity: 5935kW 5.935 MW,
Thus over the month Capacity * 720 hours per month = 4273.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 946 15.94% Issued
01/04/2018 1467 24.72% Issued
01/03/2018 1898 31.98% Issued
01/02/2018 1584 26.69% Issued
01/01/2018 2377 40.05% Issued
01/12/2017 2086 35.15% Issued
01/11/2017 1903 32.06% Issued
01/10/2017 2154 36.29% Issued
01/09/2017 1257 21.18% Issued
01/08/2017 1191 20.07% Issued
01/07/2017 1011 17.03% Issued
01/06/2017 1540 25.95% Issued
01/05/2017 1019 17.17% Issued
01/04/2017 963 16.23% Issued
01/03/2017 713 12.01% Issued

 Calculations


Capacity: 15
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/19/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 15 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 322049

Project Info
Updated: Just how many solar projects beat the fast-track review?
Ever since the first mention of the Fast Track Feed-in Tariff Review: how many projects will beat the August 1 cut-off? Langage Westmill HAWTON toyota marston Rhos-Y-Gilwen wheal jane jb wheaton hendra coombe

£54.4m funding package settled for solar investors
Refinancing: Benbole (1.7MW), Cornwall; HAWTON (4.9MW), Nottinghamshire; Howton (5.0MW), Cornwall; Marston (4.5MW), Nottinghamshire; Sandhill (1.9MW), Somerset; and Wilburton (5.0MW), Cambridgeshire.

Two more solar farms go live
Jul 2011 - 7,098 solar panels were installed by Thermavolt at a ten-acre site at Benbole, while a 5mw project at HAWTON Farm, consisting of 17,856 panels, has been built by Oskamera Solar Power Solutions UK.

Howton Farm Cornwall
7,098 solar panels were installed by Thermavolt at a ten-acre site at Benbole, while a 5mw project at HAWTON Farm, consisting of 17,856 panels, has been built by Oskamera Solar Power Solutions UK.

News by Type
7,098 solar panels were installed by Thermavolt at a ten-acre site at Benbole, while a 5mw project at HAWTON Farm, consisting of 17,856 panels, has been built by Oskamera Solar Power Solutions UK.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School