Sorry I found no matches, Please try again.
Inverin Wind Farm Sorry I found no matches, Please try again.
vid = 5623pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.227.233.55YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Inverin Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Inverin Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Inverin Wind Farm (Wind , Active)

 General Information.

Location in the UK : S.Ireland, Inverin galway ireland    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 3.96 MW
Approx Date of 1st power generation: February 1999

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Inverin DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Inverin : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 3.3
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 19/09/2019
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 3.3 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
How to become a solar farm manager: Manish's story
Now Manish manages ten solar farm sites across the UK, which are fields of solar panels storing and converting energy from the sun
Source: bbc, Date and Time of entry: 18 September 2019 00:00

Doncaster Sheffield Airport plans £2m solar farm to cut emissions
Doncaster Airport (DSA) said renewable energy could generate 25% of its energy and would also
Source: bbc, Date and Time of entry: 18 September 2019 00:00

1.7MWp ground-mounted solar farm to be built at Doncaster Sheffield Airport
The £2 million ground-mounted farm is set to open in 2020. The Peel Group is currently reviewing the best path to delivering the project, which it claims could supply up to 4MW of green power.
Source: spp, Date and Time of entry: 18 September 2019 00:00

BayWa r.e. boasts ‘exciting plans’ for UK renewables as O&M portfolio tops 2GW
BayWa r.e. has amassed 2GW in its solar and wind management portfolio since entering the UK O&M market in 2017.
Source: spp, Date and Time of entry: 18 September 2019 00:00

York set for 400kW ‘HyperHub’ solar carport with storage.
Monks Cross carport backed up with battery storage is set to be built in York as part of its 'HyperHubs' project.The solar carport has a proposed generation capacity of up to 400kW, powering a mix of 160kW and 7kW electric vehicle (EV) chargers.
Source: spp, Date and Time of entry: 18 September 2019 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School