Sorry I found no matches, Please try again. 176
vid = 4979pws_id = 350295pws_id = 350295
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.138.122.195 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Pen y Fan Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Pen y Fan Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Pen y Fan Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, NP11 3XG    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 1.56 MW
Approx Date of 1st power generation: January 2017

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

It is a second hand re-conditioned Vestas V66 1.65MW from the Netherlands with a hub height of 79m and rotor diameter of 66m.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Pen-y-Fan Industrial Estate Croespenmaen Crumlin Newport NP11 3XG

 Associated Companies.

Relationship Company (For: Pen y Fan )
DeveloperSirius Group

 DECC Data on this Project: Pen y Fan :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Land At Pen Y Fan     1.5 MW
Energy Type: Wind Onshore
County: Caerphilly     Country: Wales     LPA: Caerphilly County Borough Council
Site ID and Reference: 5294 /     District:
Applicant: Clenergy     Application : 15/0388/FULL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 124 Calculated capacity: 1.5
Site Address: Land At Pen Y Fan, Industrial Estate Pen Y Fan, Newport, Gwent
  NP11 3AA
County: Caerphilly Region: Wales
OS Coordinates: 319869 / 319869
Development Status: Planning Application Withdrawn
Application Submitted: 6/5/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 8/5/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 7/28/2015    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Pen y Fan: Wind :

Site Name: Pen y Fan Wind Turbine
Generator Type: Wind
Scheme : REGO Generator ID: G01661NWWA
Capacity: 1480 Status: Live
Accreditation Date: 6/5/2015    
Commission Date: 1/21/2017    
Applicant: SRE (Pen Y Fan) Limited
Applicant Address: Sirius Russell House Langley Moor Durham DH7 8HJ England
Address: Land adjacent to Abingdon Flooring Parkway Pen y Fan Industrial Estate Crumlin NP113XG Wales
 
Assumptions: Capacity: 1480kW 1.48 MW,
Thus over the month Capacity * 720 hours per month = 1065.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
168 11.35% Issued
94 6.35% Issued
283 19.12% Issued
65 4.39% Issued
179 12.09% Issued
207 13.99% Issued
147 9.93% Issued
279 18.85% Issued
149 10.07% Issued
116 7.84% Issued
394 26.62% Issued
195 13.18% Issued
144 9.73% Issued
250 16.89% Issued
269 18.18% Issued
179 12.09% Issued

 Calculations


Capacity: 3.3
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/18/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 3.3 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350295

Project Info
PEN Y FAN WIND TURBINE PROJECT GEARS UP FOR THE BIG POUR!
This will be Sirius Renewable Energy’s 7th turbine in the fleet and will (when completed) supply discounted renewable energy (green power) to Abingdon Flooring’s on-site factory for a minimum of 15 years

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School