Loading
Page views this IP this session = 1 of 10 unsubscribed pagesPen y Fan Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Pen y Fan Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Pen y Fan Wind Farm (Wind , Active) Location in the UK : Wales, NP11 3XG Type of installation: Wind on/offshore: on Turbines :1 Capacity : 1.56 MW Approx Date of 1st power generation: January 2017
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
It is a second hand re-conditioned Vestas V66 1.65MW from the Netherlands with a hub height of 79m and rotor diameter of 66m. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Pen-y-Fan Industrial Estate Croespenmaen Crumlin Newport NP11 3XG
Relationship |
Company (For:
Pen y Fan
) |
Developer | Sirius Group |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Land At Pen Y Fan 1.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Caerphilly Country: Wales LPA: Caerphilly County Borough Council
|
Site ID and Reference: |
5294 /
District:
|
Applicant: |
Clenergy
Application :
15/0388/FULL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
124 |
Calculated capacity: |
1.5 |
Site Address: |
Land At Pen Y Fan, Industrial Estate Pen Y Fan, Newport, Gwent
|
|
NP11 3AA
|
County: |
Caerphilly Region: Wales
|
OS Coordinates: |
319869 / 319869
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
6/5/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
8/5/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
7/28/2015 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Pen y Fan Wind Turbine
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01661NWWA
|
Capacity: |
1480
|
Status: |
Live
|
Accreditation Date: |
6/5/2015
|
|
|
Commission Date: |
1/21/2017
|
|
|
Applicant: |
SRE (Pen Y Fan) Limited
|
Applicant Address: |
Sirius
Russell House
Langley Moor
Durham
DH7 8HJ
England
|
Address: |
Land adjacent to Abingdon Flooring
Parkway
Pen y Fan Industrial Estate
Crumlin
NP113XG
Wales
|
|
Assumptions: Capacity: 1480kW 1.48 MW, Thus over the month Capacity * 720 hours per month = 1065.6 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 168 | 11.35% | Issued | | | | 94 | 6.35% | Issued | | | | 283 | 19.12% | Issued | | | | 65 | 4.39% | Issued | | | | 179 | 12.09% | Issued | | | | 207 | 13.99% | Issued | | | | 147 | 9.93% | Issued | | | | 279 | 18.85% | Issued | | | | 149 | 10.07% | Issued | | | | 116 | 7.84% | Issued | | | | 394 | 26.62% | Issued | | | | 195 | 13.18% | Issued | | | | 144 | 9.73% | Issued | | | | 250 | 16.89% | Issued | | | | 269 | 18.18% | Issued | | | | 179 | 12.09% | Issued |
|
Capacity: 3.3 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/18/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|