Sorry I found no matches, Please try again.
Four Burrows Wind Farm Sorry I found no matches, Please try again.
vid = 479pws_id = 352074pws_id = 352074
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.227.252.191YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Four Burrows Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Four Burrows Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Four Burrows Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Cornwall, Carrick    
Type of installation: Wind    on/offshore: on
Turbines :15  Capacity : 4.5 MW
Approx Date of 1st power generation: 1995

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Developed and constructed by New World Power in 1995, Four Burrows was purchased by Renewable Energy Systems Ltd in 1997.

The wind farm began generating power in March 1995 and was originally contracted under the 1994 Non Fossil Fuel Obligation (NFFO). Output is now contracted under the Renewables Obligation.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Four Burrows DECC Reference:EN00373

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Four Burrows : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 6.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 23 m/s (51.451 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 29/02/2020
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 6.2 start: 5 Optimum: 15/ Stop: 23.133333 / wind: / ratio 352074


Weather Station Name : Kennall Vale Latitude: 50.2003 Longitude: -5.1465 Elevation: 26

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00N 11 5 / 23.133333 0
12/07/2018 12:00:00NNW 11 5 / 23.133333 0
12/07/2018 15:00:00NNW 11 5 / 23.133333 0
12/07/2018 18:00:00NNW 11 5 / 23.133333 0
12/07/2018 21:00:00NNW 7 5 / 23.133333 0
13/07/2018NNW 9 5 / 23.133333 0
13/07/2018 03:00:00NNW 7 5 / 23.133333 0
13/07/2018 06:00:00N 7 5 / 23.133333 0
13/07/2018 09:00:00N 7 5 / 23.133333 0
13/07/2018 12:00:00NNW 7 5 / 23.133333 0
13/07/2018 15:00:00NNW 9 5 / 23.133333 0
13/07/2018 18:00:00NNW 9 5 / 23.133333 0
13/07/2018 21:00:00NW 4 5 / 23.133333 0
14/07/2018NW 4 5 / 23.133333 0
14/07/2018 03:00:00WNW 4 5 / 23.133333 0
14/07/2018 06:00:00NNW 4 5 / 23.133333 0
14/07/2018 09:00:00NW 2 5 / 23.133333 0
14/07/2018 12:00:00WNW 4 5 / 23.133333 0
14/07/2018 15:00:00WNW 7 5 / 23.133333 0
14/07/2018 18:00:00NW 9 5 / 23.133333 0
14/07/2018 21:00:00NW 4 5 / 23.133333 0
15/07/2018WNW 4 5 / 23.133333 0
15/07/2018 03:00:00WNW 4 5 / 23.133333 0
15/07/2018 06:00:00W 4 5 / 23.133333 0
15/07/2018 09:00:00WSW 7 5 / 23.133333 0
15/07/2018 12:00:00WSW 7 5 / 23.133333 0
15/07/2018 15:00:00W 9 5 / 23.133333 0
15/07/2018 18:00:00WNW 9 5 / 23.133333 0
15/07/2018 21:00:00WNW 7 5 / 23.133333 0
16/07/2018W 7 5 / 23.133333 0
16/07/2018 03:00:00W 7 5 / 23.133333 0
16/07/2018 06:00:00W 7 5 / 23.133333 0
16/07/2018 09:00:00W 9 5 / 23.133333 0
16/07/2018 12:00:00WNW 9 5 / 23.133333 0
16/07/2018 15:00:00NW 11 5 / 23.133333 0
16/07/2018 18:00:00NW 11 5 / 23.133333 0
16/07/2018 21:00:00WNW 9 5 / 23.133333 0
Project Info
RES Group, FOUR BURROWS

RES enters PV market with first UK solar farm - FOUR BURROWS
The project represents the renewable energy giant’s first foray into the UK utility-scale PV market and is located next to the company’s FOUR BURROWS Wind Farm.

(2013) RES to add solar at FOUR BURROWS
RES has won a planning nod from Cornwall Council on plans to build a 6.3MW solar array next to its existing 4.5MW FOUR BURROWS wind farm.

FOUR BURROWS Solar farm
Cornwall Council's strategic planning committee approved the development at FOUR BURROWS, near Chiverton Cross, which will provide enough electricity to meet the average daily consumption of more than 1,000 local households. FOUR BURROWS Solar Farm

©2018 Simon Mallett
Latest News Added
MHI Vestas secures Seagreen turbine gig
MHI Vestas has entered into a preferred supplier agreement to supply and service up to 114 wind turbines for the 1100MW Seagreen offshore wind farm being built in Scottish waters.
Source: renews, Date and Time of entry: 18 October 2019 00:00

Corbyn says Fife wind farm contract plan -not credible
Jeremy Corbyn says plans to manufacture parts for a £2bn wind farm off the Fife coast at a site thousands of miles away are not credible.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Noisy wind farm extension paused after Barrow residents object
Residents claiming a nearby wind farm has been noisy for 20 years have convinced councillors to pause plans to keep it open for another decade.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Glenshimmeroch wind farm project approved on appeal
A 10-turbine wind farm in southern Scotland has been approved on appeal. Developers Energiekontor took the case to the Scottish government over Dumfries and Galloway Council's failure to issue a decision.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Workers at Isle of Lewis BiFab yard to lose jobs
Workers at a fabrication yard, which was brought back into use just six months ago, have been told they will not have their contracts renewed.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School