Sorry I found no matches, Please try again. 176
vid = 4418pws_id = 354472pws_id = 354472
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 44.200.145.114 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Mynydd Brombil Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Mynydd Brombil Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Mynydd Brombil Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Port Talbot    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 8 MW
Approx Date of 1st power generation: January 2017

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

REG Windpower Under Construction

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Mynydd Brombil Brombil Farm Margam SA13 2SR Wales

 Associated Companies.

Relationship Company (For: Mynydd Brombil )
AgentPegasus Planning Group
DeveloperREG Windpower

 DECC Data on this Project: Mynydd Brombil :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Mynydd Brombil Wind Farm     8 MW
Energy Type: Wind Onshore
County: Neath Port Talbot     Country: Wales     LPA: Neath Port Talbot Council
Site ID and Reference: 4193 / B0328     District:
Applicant: REG Windpower     Application : P2012/0638 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 8
Site Address: Brombil, Port Talbot
 
County: Neath Port Talbot Region: Wales
OS Coordinates: 279141 / 279141
Development Status: Operational
Application Submitted: 8/29/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2016    
Generator Live 1/15/2017 This Record Last Updated: 4/18/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 7/8/2020    
Secretary of State - Appeal Lodged: 1/7/2015
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Mynydd Brombil: Wind :

Site Name: Mynydd Brombil Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00211RQWA
Capacity: 8000 Status: Live
Accreditation Date: 8/29/2012    
Commission Date: 1/16/2017    
Applicant: REG Windpower Ltd.
Applicant Address: R E G Holdings Ltd Edgeborough House Upper Edgeborough Road Guildford GU1 2BJ England
Address: Mynydd Brombil Wind Farm Land at Mynydd Brombil Brombil Farm Margam SA13 2SR Wales

Site Name: Mynydd Brombil Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01634NWWA
Capacity: 8000 Status: Live
Accreditation Date: 8/29/2012    
Commission Date: 1/16/2017    
Applicant: REG Windpower Ltd.
Applicant Address: R E G Holdings Ltd Edgeborough House Upper Edgeborough Road Guildford GU1 2BJ England
Address: Mynydd Brombil Wind Farm Land at Mynydd Brombil Brombil Farm Margam SA13 2SR Wales
 
Assumptions: Capacity: 8000kW 8 MW,
Thus over the month Capacity * 720 hours per month = 5760 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 1904 23.80% Issued
01/03/2018 2146 26.83% Issued
01/02/2018 2054 25.68% Issued
01/01/2018 3139 39.24% Issued
01/12/2017 2419 30.24% Issued
01/11/2017 1855 23.19% Issued
01/10/2017 2453 30.66% Issued
01/09/2017 1785 22.31% Issued
01/08/2017 1491 18.64% Issued
01/07/2017 1342 16.78% Issued
01/06/2017 1662 20.78% Issued
01/05/2017 1562 19.53% Issued
01/04/2017 992 12.40% Issued
01/03/2017 2537 31.71% Issued
01/02/2017 2400 30.00% Issued
01/01/2017 630 7.88% Issued

 Calculations


Capacity: 16
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 21 m/s (46.977 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 16 start: 5 Optimum: 15/ Stop: 21 / wind: / ratio 354472

Project Info
MYNYDD BROMBIL Meteorological Mast Archaeological Watching Brief

REG secures planning double Council grants planning permission for 9MW wind farm

MYNYDD BROMBIL Wind Farm

REG wins permit for 9-MW wind farm in Wales
On Friday, the UK renewable energy company announced permission for another wind project in Wales, the 8-MW MYNYDD BROMBIL wind farm.

GREEN LIGHT FOR PORT TALBOT WIND FARM
Renewable Energy Generation (REG) has secured planning consent for its 8MW MYNYDD BROMBIL Wind Farm in Neath Port Talbot.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School