vid = 4187pws_id = 350689pws_id = 350689
--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:4247 Ind:1 IP: 52.15.63.145 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

New Albion Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with New Albion Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

New Albion Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, NN14 1QT    
Type of installation: Wind    on/offshore: on
Turbines :7  Capacity : 14.35 MW
Approx Date of 1st power generation: January 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

John Laing Operational

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

New Albion windfarm Town Close Farm (land at) Rushton Kettering NN14 1QP England

 Associated Companies.

Relationship Company (For: New Albion )
ContractorDawnus
DeveloperInfinergy
DeveloperJohn Laing Plc
OperatorJohn Laing Plc
OwnerJohn Laing Plc
ContractorWind Prospect

 DECC Data on this Project: New Albion :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: New Albion Wind Farm     14.4 MW
Energy Type: Wind Onshore
County: Northamptonshire     Country: England     LPA: Kettering Borough Council
Site ID and Reference: 4513 / EN00576     District:
Applicant: John Laing Environmental Assets Group     Application : KET/2009/0549 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 2.0499999999999998
Height of Turbines: Calculated capacity: 14.35
Site Address: Agricultural land at Towns Close Farm, between Pipewell and Rushton and close to the A6003 Road to Corby
  NN14 1QT
County: Northamptonshire Region: East Midlands
OS Coordinates: 484680 / 484680
Development Status: Operational
Application Submitted: 8/29/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/1/2015    
Generator Live 1/18/2016 This Record Last Updated: 8/25/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: New Albion: Wind :

Site Name: New Albion Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00351RQEN
Capacity: 14170 Status: Live
Accreditation Date: 8/29/2009    
Commission Date: 12/8/2015    
Applicant: John Laing Investments
Applicant Address: 1 Kingsway London WC2B 6AN England
Address: New Albion windfarm Town Close Farm (land at) Rushton Kettering NN14 1QP England

Site Name: New Albion Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02904NWEN
Capacity: 14170 Status: Live
Accreditation Date: 8/29/2009    
Commission Date: 12/8/2015    
Applicant: John Laing Investments
Applicant Address: 1 Kingsway London WC2B 6AN England
Address: New Albion windfarm Town Close Farm (land at) Rushton Kettering NN14 1QP England
 
Assumptions: Capacity: 14170kW 14.17 MW,
Thus over the month Capacity * 720 hours per month = 10202.4 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 2141 15.11% Issued
01/03/2018 2810 19.83% Issued
01/02/2018 2459 17.35% Issued
01/01/2018 3863 27.26% Issued
01/12/2017 3343 23.59% Issued
01/11/2017 2450 17.29% Issued
01/10/2017 3106 21.92% Retired
01/09/2017 1627 11.48% Retired
01/08/2017 1401 9.89% Issued
01/07/2017 1460 10.30% Issued
01/06/2017 2149 15.17% Retired
01/05/2017 1604 11.32% Issued
01/04/2017 1513 10.68% Issued
01/04/2017 6 0.04% Issued
01/03/2017 2829 19.96% Issued
01/02/2017 2618 18.48% Issued
01/01/2017 1819 12.84% Issued
Dec-16 01810 2011 14.19% Pending Tr
Nov-16 01855 2061 14.54% Pending Tr
Oct-16 01185 1323 9.34% Pending Tr
Sep-16 01395 1550 10.94% Pending Tr
Aug-16 01653 1837 12.96% Pending Tr
Jul-16 01458 1620 11.43% Pending Tr
Jul-16 01458 1620 11.43% Pending Tr
Jun-16 0899 1011 7.13% Pending Tr
May-16 01601 1778 12.55% Pending Tr
Apr-16 01578 1753 12.37% Pending Tr
Mar-16 02107 2341 16.52% Pending Tr
Feb-16 02880 3200 22.58% Pending Tr
Dec-15 02842 3158 22.29% Pending Tr

 Calculations


Capacity: 28.7
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 28.7 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 350689

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School