vid = 407pws_id = 354700pws_id = 354700
--------------------------------------------------------
Not Logged on, Max pages: 5( 1 Seen ) ID:657 Ind:1 IP: 54.224.255.17YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Thanet Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Thanet Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Thanet Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Kent, Foreness    
Type of installation: Wind    on/offshore: off
Turbines :100  Capacity : 300 MW
Approx Date of 1st power generation: 2010 September

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

proposed 147MW extension

Thanet array was officially opened on 23 September 2010 as the largest offshore wind farm in the world. It is visible from most of the coast of Thanet.
London Array and Thanet Array are the first projects to be granted consent under round two of UK offshore wind development, expected to produce 5-7GW worth of wind power in total, enough to power 240,000 homes when running to peak effectiveness. Thanet is one of 15 Round 2 wind projects announced by the Crown Estate in January 2004.

The wind farm will be approx 12km off Foreness Point, completion is expected in 2010. Construction is based from Port Ramsgate.

Power will be brought ashore from this wind farm to an existing sub-station at Richborough.

It is currently (Sept 2010) the largest operational offshore wind farm anywhere in the World. It will make a significant contribution to the Governments national and regional renewable energy targets.
Turbine layout shows 40 proposed additional turbines, final layout will be 34 turbines

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Thanet DECC Reference:N00452W

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Thanet : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 300
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 22/06/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 300 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354700


Weather Station Name : Margate - Fulsam Rock (Beach) Latitude: 51.3928 Longitude: 1.3858 Elevation: 0

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
21/06/2018 18:00:00ENE 11 5 / 25 0
21/06/2018 21:00:00ESE 4 5 / 25 0
22/06/2018WSW 9 5 / 25 0
22/06/2018 03:00:00NW 16 5 / 25 0.215 64.57193.71
22/06/2018 06:00:00NNW 16 5 / 25 0.215 64.57387.42
22/06/2018 09:00:00NNW 11 5 / 25 387.42
22/06/2018 12:00:00N 11 5 / 25 387.42
22/06/2018 15:00:00ENE 9 5 / 25 387.42
22/06/2018 18:00:00ENE 11 5 / 25 387.42
22/06/2018 21:00:00ESE 4 5 / 25 387.42
23/06/2018SSW 7 5 / 25 387.42
23/06/2018 03:00:00SW 4 5 / 25 387.42
23/06/2018 06:00:00WSW 7 5 / 25 387.42
23/06/2018 09:00:00W 9 5 / 25 387.42
23/06/2018 12:00:00WNW 7 5 / 25 387.42
23/06/2018 15:00:00E 4 5 / 25 387.42
23/06/2018 18:00:00SE 4 5 / 25 387.42
23/06/2018 21:00:00ENE 9 5 / 25 387.42
24/06/2018ENE 7 5 / 25 387.42
24/06/2018 03:00:00ENE 4 5 / 25 387.42
24/06/2018 06:00:00NE 7 5 / 25 387.42
24/06/2018 09:00:00NE 9 5 / 25 387.42
24/06/2018 12:00:00NE 9 5 / 25 387.42
24/06/2018 15:00:00ENE 9 5 / 25 387.42
24/06/2018 18:00:00ENE 9 5 / 25 387.42
24/06/2018 21:00:00E 7 5 / 25 387.42
25/06/2018ENE 4 5 / 25 387.42
25/06/2018 03:00:00N 4 5 / 25 387.42
25/06/2018 06:00:00NNW 4 5 / 25 387.42
25/06/2018 09:00:00NE 7 5 / 25 387.42
25/06/2018 12:00:00ENE 7 5 / 25 387.42
25/06/2018 15:00:00E 9 5 / 25 387.42
25/06/2018 18:00:00ESE 7 5 / 25 387.42
25/06/2018 21:00:00ESE 7 5 / 25 387.42
Project Info
Vattenfall says public support plans to extend THANET Offshore Wind Farm project
Swedish energy firm Vattenfall wants to add a further 34 giant turbines to the THANET Offshore Wind Farm, off the coast of THANET and Sandwich.

Environmental Impact Assessment Report to Inform Scoping

Vattenfall revives plan to extend UK offshore wind farm
Swedish energy company Vattenfall plans to extend its 300-megawatt THANET offshore wind farm off the coast of Kent in southern England, it said, after scrapping the idea in 2010 due to grid constraints.

Vattenfall unveils 340MW THANET 2
Vattenfall has taken the wraps off plans for 34 turbines at an up to 340MW THANET 2 wind farm off the UK east coast.

THANET Extension

©2018 Simon Mallett
Latest News Added
Vestas receives 110 MW order for Bhlaraidh
The order includes delivery, installation, and a 10-year Active Output Management (AOM) 4000 service agreement. Installation is expected to begin in the fourth quarter of 2016, with commissioning scheduled for the first half of 2017.
Source: vestas, Date and Time of entry: 21 June 2018 00:00

The world's fifth biggest wind farm has opened off the Norfolk coast
Dubbed the Race Bank development, the wind farm is capable of powering more than half a million UK homes, according to the Danish energy firm Orsted.
Source: dailymail, Date and Time of entry: 13 June 2018 00:00

Plan for 40 acre solar power and sheep farm at Ainderby Steeple
Northallerton businessman David Kerfoot and his neighbours have announced their opposition to proposals to install 29,528 1.6m by 1m photovoltaic panels
Source: northernecho, Date and Time of entry: 08 June 2018 00:00

New wind farm can be game-changer for Aberdeen, project boss says
Vattenfall project director Adam Ezzamel said yesterday that he wants the project to change Aberdeen from a traditional oil and gas hub to a city known for renewable energy.
Source: energyvoice, Date and Time of entry: 06 June 2018 00:00

Tories claim SNP planning Borders money grab over wind farms Read more at: ht
Angry Conservatives have claimed the Scottish Government is planning a multi-million pound money grab from the Borders by charging for work undertaken by the local council on wind farm applications.
Source: scotsman, Date and Time of entry: 06 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast: