vid = 406pws_id = 350931pws_id = 350931
--------------------------------------------------------
Not Logged on, Max pages: 5( 1 Seen ) ID:657 Ind:1 IP: 54.225.55.174YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

London Array Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with London Array Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

London Array Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, London, Thames Estuary    
Type of installation: Wind    on/offshore: off
Turbines :175  Capacity : 630 MW
Approx Date of 1st power generation: July 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Opened on 4th July 2013 by David Cameron.

The London Array wind farm is being developed by a consortium comprising three partners E.on, Dong and Masdar. The wind farm would be located more than 20km (12 miles) from the Kent and Essex coasts in the outer Thames Estuary, one of the three strategic areas the Government has identified for offshore wind farm development.
E.ON and DONG Energy have become 50-50 partners in the 1.5billion London Array scheme, which was blown off course in May 2008 when Shell announced it was pulling out.

When fully operational, it would make a substantial contribution to the UK Government’s target of providing 15.4% of all electricity supply from renewable sources by 2015. Based on the current schedule, it is expected that the project would represent nearly 7% of this target. It would also avoid the emission of millions of tonnes of carbon dioxide over its life.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: London Array DECC Reference:N00447W

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: London Array : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 630.000000000002
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 20/08/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 630.000000000002 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350931


Weather Station Name : Clacton-On-Sea Latitude: 51.7891 Longitude: 1.1548 Elevation: 12

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00N 4 5 / 25 0
12/07/2018 12:00:00ESE 9 5 / 25 0
12/07/2018 15:00:00ESE 7 5 / 25 0
12/07/2018 18:00:00E 7 5 / 25 0
12/07/2018 21:00:00ENE 9 5 / 25 0
13/07/2018NE 7 5 / 25 0
13/07/2018 03:00:00NNE 4 5 / 25 0
13/07/2018 06:00:00NNE 7 5 / 25 0
13/07/2018 09:00:00ENE 7 5 / 25 0
13/07/2018 12:00:00E 9 5 / 25 0
13/07/2018 15:00:00E 9 5 / 25 0
13/07/2018 18:00:00E 9 5 / 25 0
13/07/2018 21:00:00E 7 5 / 25 0
14/07/2018E 7 5 / 25 0
14/07/2018 03:00:00ESE 4 5 / 25 0
14/07/2018 06:00:00SE 7 5 / 25 0
14/07/2018 09:00:00SE 7 5 / 25 0
14/07/2018 12:00:00SE 7 5 / 25 0
14/07/2018 15:00:00ESE 9 5 / 25 0
14/07/2018 18:00:00ESE 9 5 / 25 0
14/07/2018 21:00:00SE 9 5 / 25 0
15/07/2018SSE 7 5 / 25 0
15/07/2018 03:00:00S 7 5 / 25 0
15/07/2018 06:00:00S 4 5 / 25 0
15/07/2018 09:00:00SSE 7 5 / 25 0
15/07/2018 12:00:00SSE 9 5 / 25 0
15/07/2018 15:00:00SE 9 5 / 25 0
15/07/2018 18:00:00ESE 9 5 / 25 0
15/07/2018 21:00:00SE 9 5 / 25 0
16/07/2018SE 7 5 / 25 0
16/07/2018 03:00:00SE 7 5 / 25 0
16/07/2018 06:00:00SE 4 5 / 25 0
16/07/2018 09:00:00SSE 7 5 / 25 0
16/07/2018 12:00:00SE 7 5 / 25 0
16/07/2018 15:00:00SE 9 5 / 25 0
16/07/2018 18:00:00SE 9 5 / 25 0
16/07/2018 21:00:00ESE 7 5 / 25 0
Project Info
Dong Energy to build world's biggest wind farm in the Irish Sea off UK coast
The 660-megawatt Walney Extension windfarm will overtake the current record holder, Dongs 630-megawatt (MW) LONDON ARRAY Offshore Wind Farm, when it completes in 2018. It will deliver electricity to 460,000 UK homes.

LONDON ARRAY: Boundary Map

LONDON ARRAY Website

Wikipedia

At what point should the offshore wind industry start worrying?
LONDON ARRAY and Forewind ditch plans for 2.2GW of new offshore wind capacity in one day, but DECC maintains the industry has a bright future

©2018 Simon Mallett
Latest News Added
Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (the Variation Application)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Pinewood Studio Wales, Cardiff
Ecotricity's first Welsh turbine - powering the development of high-tech solar panels. Sun and wind power comes together in a green revolution.
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Wind turbine on Coleraine campus
An 800 kW wind turbine generator has been installed on the Coleraine Campus since September 2008. Ulster University
Source: ulster, Date and Time of entry: 26 June 2018 00:00

Vestas receives 110 MW order for Bhlaraidh
The order includes delivery, installation, and a 10-year Active Output Management (AOM) 4000 service agreement. Installation is expected to begin in the fourth quarter of 2016, with commissioning scheduled for the first half of 2017.
Source: vestas, Date and Time of entry: 21 June 2018 00:00

The world's fifth biggest wind farm has opened off the Norfolk coast
Dubbed the Race Bank development, the wind farm is capable of powering more than half a million UK homes, according to the Danish energy firm Orsted.
Source: dailymail, Date and Time of entry: 13 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast: