Page views this IP this session = 1 of 5 unsubscribed pagesLondon Array Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with London Array Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
London Array Wind Farm (Wind , Active) Location in the UK : England, London, Thames Estuary Type of installation: Wind on/offshore: off Turbines :175 Capacity : 630 MW Approx Date of 1st power generation: July 2013
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Opened on 4th July 2013 by David Cameron.
The London Array wind farm is being developed by a consortium comprising three partners E.on, Dong and Masdar. The wind farm would be located more than 20km (12 miles) from the Kent and Essex coasts in the outer Thames Estuary, one of the three strategic areas the Government has identified for offshore wind farm development.
E.ON and DONG Energy have become 50-50 partners in the 1.5billion London Array scheme, which was blown off course in May 2008 when Shell announced it was pulling out.
When fully operational, it would make a substantial contribution to the UK Government’s target of providing 15.4% of all electricity supply from renewable sources by 2015. Based on the current schedule, it is expected that the project would represent nearly 7% of this target. It would also avoid the emission of millions of tonnes of carbon dioxide over its life. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Subscribed version includes full address details of project site Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects) Subscriber Register Subscribed version includes access to DECC data where it exists for this project. Also facility to include a mix of DECC data within csv downloads Subscriber Register Subscribed version includes access to OFGEM data where it exists for this project. Also facility to include a mix of OFGEM data within csv downloads Subscriber Register
Capacity: 630.000000000002 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 25/04/2018 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Weather Station Name : Clacton-On-Sea Latitude: 51.7891 Longitude: 1.1548 Elevation: 12
| Date | Wind Direction | Wind Speed | Start / Stop | Capacity Factor | Output MW/hr | Generated MWhrs | 24/04/2018 18:00:00 | SW | 16 | 5 / 25 | 0.215 | 135.60 | 406.8 | 24/04/2018 21:00:00 | SW | 18 | 5 / 25 | 0.305 | 191.93 | 982.59 | 25/04/2018 | WSW | 18 | 5 / 25 | 0.305 | 191.93 | 1558.38 | 25/04/2018 03:00:00 | WNW | 11 | 5 / 25 | | | 1558.38 | 25/04/2018 06:00:00 | W | 11 | 5 / 25 | | | 1558.38 | 25/04/2018 09:00:00 | W | 13 | 5 / 25 | 0.081 | 51.12 | 1711.74 | 25/04/2018 12:00:00 | WSW | 16 | 5 / 25 | 0.215 | 135.60 | 2118.54 | 25/04/2018 15:00:00 | WSW | 16 | 5 / 25 | 0.215 | 135.60 | 2525.34 | 25/04/2018 18:00:00 | WSW | 13 | 5 / 25 | 0.081 | 51.12 | 2678.7 | 25/04/2018 21:00:00 | W | 11 | 5 / 25 | | | 2678.7 | 26/04/2018 | WSW | 13 | 5 / 25 | 0.081 | 51.12 | 2832.06 | 26/04/2018 03:00:00 | WSW | 13 | 5 / 25 | 0.081 | 51.12 | 2985.42 | 26/04/2018 06:00:00 | WSW | 13 | 5 / 25 | 0.081 | 51.12 | 3138.78 | 26/04/2018 09:00:00 | W | 16 | 5 / 25 | 0.215 | 135.60 | 3545.58 | 26/04/2018 12:00:00 | WSW | 16 | 5 / 25 | 0.215 | 135.60 | 3952.38 | 26/04/2018 15:00:00 | WSW | 16 | 5 / 25 | 0.215 | 135.60 | 4359.18 | 26/04/2018 18:00:00 | WSW | 11 | 5 / 25 | | | 4359.18 | 26/04/2018 21:00:00 | SW | 11 | 5 / 25 | | | 4359.18 | 27/04/2018 | WSW | 7 | 5 / 25 | | | 4359.18 | 27/04/2018 03:00:00 | WSW | 4 | 5 / 25 | | | 4359.18 | 27/04/2018 06:00:00 | SW | 4 | 5 / 25 | | | 4359.18 | 27/04/2018 09:00:00 | SSE | 7 | 5 / 25 | | | 4359.18 | 27/04/2018 12:00:00 | SE | 11 | 5 / 25 | | | 4359.18 | 27/04/2018 15:00:00 | SE | 11 | 5 / 25 | | | 4359.18 | 27/04/2018 18:00:00 | E | 11 | 5 / 25 | | | 4359.18 | 27/04/2018 21:00:00 | E | 9 | 5 / 25 | | | 4359.18 | 28/04/2018 | ESE | 7 | 5 / 25 | | | 4359.18 | 28/04/2018 03:00:00 | NNE | 7 | 5 / 25 | | | 4359.18 | 28/04/2018 06:00:00 | NNE | 9 | 5 / 25 | | | 4359.18 | 28/04/2018 09:00:00 | NNE | 11 | 5 / 25 | | | 4359.18 | 28/04/2018 12:00:00 | SSE | 11 | 5 / 25 | | | 4359.18 | 28/04/2018 15:00:00 | SSE | 11 | 5 / 25 | | | 4359.18 | 28/04/2018 18:00:00 | NNE | 11 | 5 / 25 | | | 4359.18 | 28/04/2018 21:00:00 | N | 11 | 5 / 25 | | | 4359.18 |
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Wind farm aims to deliver £100m boost to South Lanarkshire economy With construction of the 88MW Kype Muir Wind Farm, south of Strathaven, well underway, it is now estimated that the project will be worth more than £100m to the local economy. Source: scotishconstruction, Date and Time of entry: 03 April 2018 00:00
Galloper offshore wind farm with 353MW capacity becomes fully operational Construction of the £1.5bn wind farm began in November 2016. Full power generation was achieved on 29 March, as Siemens Gamesa’s last turbine was switched on. Source: cleantech, Date and Time of entry: 03 April 2018 00:00
Blow me! Galloper wind farm off East Anglian coast hits full throttle A £1.5bn wind farm off the coast of East Anglia has hit full throttle, just eighteen months after construction began. Source: eadt, Date and Time of entry: 03 April 2018 00:00
First foundation installed for Aberdeen Bay wind farm Vattenfall has released footage of the giant Asian Hercules crane vessel installing the first turbine foundation for the Aberdeen Bay wind farm. Source: aberdeenjournals, Date and Time of entry: 03 April 2018 00:00
Glenfiddich owner loses Dorenell wind farm objection William Grant and Sons objected to the Dorenell wind farm on the grounds it would spoil the local countryside and reduce visitor numbers. Source: bbc, Date and Time of entry: 03 April 2018 00:00
|
|
©2017
Simon Mallett |
|