Sorry I found no matches, Please try again.
Windy Standard Wind Farm Sorry I found no matches, Please try again.
vid = 391pws_id = 371357pws_id = 371357
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.80.85.76YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Windy Standard Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Windy Standard Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Windy Standard Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Dumfries & Galloway    
Type of installation: Wind    on/offshore: on
Turbines :36  Capacity : 21.6 MW
Approx Date of 1st power generation: September 1996

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Made up of Gallows Rig and Polwhat Rig

Windy Standard became fully operational in November 1996 and at the time was Scotlands second largest wind farm. It consists of 36 wind turbines each of 600 kilowatts (kW) maximum output, manufactured by Nordtank A/S of Denmark. The wind farm has a combined maximum power of 21.6 megawatts (MW).

Agreed: Phase II shown
Proposed Phase III shown

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Windy Standard DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Windy Standard : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 103.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 21 m/s (46.977 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/12/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 103.6 start: 5 Optimum: 15/ Stop: 20.568181 / wind: / ratio 371357


Weather Station Name : Black Shoulder Latitude: 55.2489 Longitude: -4.1942 Elevation: 710

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00WNW 4 5 / 20.568181 0
12/07/2018 12:00:00NE 4 5 / 20.568181 0
12/07/2018 15:00:00N 9 5 / 20.568181 0
12/07/2018 18:00:00NNE 9 5 / 20.568181 0
12/07/2018 21:00:00NE 7 5 / 20.568181 0
13/07/2018E 9 5 / 20.568181 0
13/07/2018 03:00:00E 7 5 / 20.568181 0
13/07/2018 06:00:00ESE 4 5 / 20.568181 0
13/07/2018 09:00:00SSE 4 5 / 20.568181 0
13/07/2018 12:00:00S 7 5 / 20.568181 0
13/07/2018 15:00:00SW 7 5 / 20.568181 0
13/07/2018 18:00:00W 7 5 / 20.568181 0
13/07/2018 21:00:00WNW 9 5 / 20.568181 0
14/07/2018WSW 9 5 / 20.568181 0
14/07/2018 03:00:00S 11 5 / 20.568181 0
14/07/2018 06:00:00S 13 5 / 20.568181 0.081 8.4125.23
14/07/2018 09:00:00SSW 13 5 / 20.568181 0.081 8.4150.46
14/07/2018 12:00:00SSW 16 5 / 20.568181 0.215 22.30117.36
14/07/2018 15:00:00SSW 13 5 / 20.568181 0.081 8.41142.59
14/07/2018 18:00:00SSW 11 5 / 20.568181 142.59
14/07/2018 21:00:00S 11 5 / 20.568181 142.59
15/07/2018S 13 5 / 20.568181 0.081 8.41167.82
15/07/2018 03:00:00S 13 5 / 20.568181 0.081 8.41193.05
15/07/2018 06:00:00S 13 5 / 20.568181 0.081 8.41218.28
15/07/2018 09:00:00S 11 5 / 20.568181 218.28
15/07/2018 12:00:00S 11 5 / 20.568181 218.28
15/07/2018 15:00:00S 13 5 / 20.568181 0.081 8.41243.51
15/07/2018 18:00:00S 11 5 / 20.568181 243.51
15/07/2018 21:00:00S 9 5 / 20.568181 243.51
16/07/2018S 9 5 / 20.568181 243.51
16/07/2018 03:00:00S 9 5 / 20.568181 243.51
16/07/2018 06:00:00SW 7 5 / 20.568181 243.51
16/07/2018 09:00:00W 7 5 / 20.568181 243.51
16/07/2018 12:00:00W 9 5 / 20.568181 243.51
16/07/2018 15:00:00W 9 5 / 20.568181 243.51
16/07/2018 18:00:00WNW 9 5 / 20.568181 243.51
16/07/2018 21:00:00WNW 9 5 / 20.568181 243.51
Project Info
Brockloch Rig III
(WINDY STANDARD) Brockloch Rig Wind Ltd (a Fred. Olsen Renewables Ltd company) are investigating the potential to extend the Brockloch Rig Wind Farm at Carsphairn Forest in Dumfries and Galloway.

Advice not to oppose WINDY STANDARD turbine expansion
The scheme would see 20 turbines added to the current 66 already in operation at WINDY STANDARD north of Carsphairn.

WINDY STANDARD Phase III planning

WINDY STANDARD Wind Farm

(2007)WINDY STANDARD windfarm to be extended
The original WINDY STANDARD was consented in 1995 with a generating capacity of 21.6 MW. The new application, which will add 30 new turbines to the existing 36, will increase capacity to 111.6 MW

©2018 Simon Mallett
Latest News Added
Norfolk Vanguard
The 1.8 gigawatt (GW) capacity project would meet the equivalent electricity needs of 5% of UK households* - around 1.3 million homes.
Source: vattenfall, Date and Time of entry: 16 November 2018 00:00

Tangy Repower
In August 2018, SSE submitted a Section 36 Application to Scottish Ministers seeking consent to replace the existing 22 operational turbines for 16 modern, more efficient machines.
Source: sse, Date and Time of entry: 16 November 2018 00:00

Plans to expand Crystal Rig wind farm lodged
A bid has been lodged to expand a wind farm in the Lammermuir Hills, taking its turbine total to more than 100.
Source: bbc, Date and Time of entry: 16 November 2018 00:00

Extra 11 turbines at Crystal Rig wind farm
Fred Olsen Ltd, has submitted an application to the Scottish Governments Energy Consents Unit for an additional 11 turbines to the south of the current wind farm site that has 91 turbines, developed in three separate stages.
Source: berwickshire news, Date and Time of entry: 16 November 2018 00:00

Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (the Variation Application)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School