Sorry I found no matches, Please try again.
Tir Mostyn Wind Farm Sorry I found no matches, Please try again.
vid = 370pws_id = 350703pws_id = 350703
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.233.224.8YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Tir Mostyn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Tir Mostyn Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Tir Mostyn Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Denbighshire    
Type of installation: Wind    on/offshore: on
Turbines :25  Capacity : 21.25 MW
Approx Date of 1st power generation: September 2005

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The wind farm
is located 8km South-West of the town of Denbigh in North Wales. On average, during
the wind farms anticipated 25-year lifespan, the twenty five 850kW wind turbines will together generate as much electricity as is used by approximately 15,500 homes. Tir Mostyn will make a significant contribution to Welsh targets for renewable energy production, whilst also helping achieve the national need for diverse and clean energy supplies.

the site managed and operated by Gamesa Eolica, based in Newport, South Wales.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Tir Mostyn DECC Reference:04069W4

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Tir Mostyn : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 21.25
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 24 m/s (53.688 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/12/2019
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 21.25 start: 5 Optimum: 15/ Stop: 24 / wind: / ratio 350703


Weather Station Name : Bylchau Latitude: 53.154 Longitude: -3.5289 Elevation: 314

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00SE 4 5 / 24 0
12/07/2018 12:00:00ENE 7 5 / 24 0
12/07/2018 15:00:00WNW 2 5 / 24 0
12/07/2018 18:00:00NNW 4 5 / 24 0
12/07/2018 21:00:00NW 2 5 / 24 0
13/07/2018NW 2 5 / 24 0
13/07/2018 03:00:00NNW 2 5 / 24 0
13/07/2018 06:00:00ENE 2 5 / 24 0
13/07/2018 09:00:00E 4 5 / 24 0
13/07/2018 12:00:00NNE 4 5 / 24 0
13/07/2018 15:00:00NNW 4 5 / 24 0
13/07/2018 18:00:00NNW 4 5 / 24 0
13/07/2018 21:00:00WNW 4 5 / 24 0
14/07/2018SW 4 5 / 24 0
14/07/2018 03:00:00SW 4 5 / 24 0
14/07/2018 06:00:00SSW 4 5 / 24 0
14/07/2018 09:00:00SW 4 5 / 24 0
14/07/2018 12:00:00SW 7 5 / 24 0
14/07/2018 15:00:00W 7 5 / 24 0
14/07/2018 18:00:00W 7 5 / 24 0
14/07/2018 21:00:00SW 7 5 / 24 0
15/07/2018SW 7 5 / 24 0
15/07/2018 03:00:00SW 7 5 / 24 0
15/07/2018 06:00:00SW 7 5 / 24 0
15/07/2018 09:00:00SW 7 5 / 24 0
15/07/2018 12:00:00SW 9 5 / 24 0
15/07/2018 15:00:00SW 9 5 / 24 0
15/07/2018 18:00:00SW 7 5 / 24 0
15/07/2018 21:00:00SW 4 5 / 24 0
16/07/2018SW 4 5 / 24 0
16/07/2018 03:00:00SSW 4 5 / 24 0
16/07/2018 06:00:00SW 4 5 / 24 0
16/07/2018 09:00:00WSW 4 5 / 24 0
16/07/2018 12:00:00W 4 5 / 24 0
16/07/2018 15:00:00WNW 7 5 / 24 0
16/07/2018 18:00:00NW 4 5 / 24 0
16/07/2018 21:00:00NNW 2 5 / 24 0
Project Info
Wind Direct: TIR MOSTYN & Foel Goch

Wind prospect

CASE STUDY TIR MOSTYN Wind Farm

HgCapital sells operating UK Wind portfolio to Munich Re
The portfolio includes the 21.25MW TIR MOSTYN wind farm in North Wales, the 16MW Bagmoor wind farm in Lincolnshire and the 65MW Scout Moor wind farm near Manchester.

Windfarm owner claims rival operation would steal our wind
And it has now emerged one of the more bizarre objections to the Brenig proposal came from the managers of the 25-turbine windfarm TIR MOSTYN, immediately to the north and east of the proposal.

©2018 Simon Mallett
Latest News Added
MHI Vestas secures Seagreen turbine gig
MHI Vestas has entered into a preferred supplier agreement to supply and service up to 114 wind turbines for the 1100MW Seagreen offshore wind farm being built in Scottish waters.
Source: renews, Date and Time of entry: 18 October 2019 00:00

Corbyn says Fife wind farm contract plan -not credible
Jeremy Corbyn says plans to manufacture parts for a 2bn wind farm off the Fife coast at a site thousands of miles away are not credible.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Noisy wind farm extension paused after Barrow residents object
Residents claiming a nearby wind farm has been noisy for 20 years have convinced councillors to pause plans to keep it open for another decade.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Glenshimmeroch wind farm project approved on appeal
A 10-turbine wind farm in southern Scotland has been approved on appeal. Developers Energiekontor took the case to the Scottish government over Dumfries and Galloway Council's failure to issue a decision.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Workers at Isle of Lewis BiFab yard to lose jobs
Workers at a fabrication yard, which was brought back into use just six months ago, have been told they will not have their contracts renewed.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School