Loading
Page views this IP this session = 1 of 10 unsubscribed pagesTappaghan Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Tappaghan Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Tappaghan Wind Farm (Wind , Active) Location in the UK : N.Ireland, Co Fermanagh Type of installation: Wind on/offshore: on Turbines :19 Capacity : 28.5 MW Approx Date of 1st power generation: March 2005
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Initial installation of 13 turbines in 2005. The wind farm produced 19.5MW of electricity, enough to power the equivalent of approximately 12,000 houses.
As part of the development Airtricity has created the Tappaghan Community Fund. The local community will benefit directly from this new wind farm as £13,000 from the Fund will be invested in local community schemes in the area each year, £260,000 over the lifetime of the project..
Extension July 2009 Adds 6 more GE1.5 turbines producing 9 MW
All the foundations for the turbines have been constructed and six out of the 13 turbines have been erected. The development involves the erection of 1.5 MW turbines on Fermanagh's border with County Tyrone, made up of the townlands of Glenarn, Stranahone and Stranadamff. The wind farm is to be commissioned in February (2009) next year. The wind farm will produce 19.5MW of electricity, enough to power the equivalent of almost 12,000 houses. This represents 57 per cent of the domestic electricity needs of the population of Fermanagh District Council.
The local community will benefit directly from this new wind farm as £1,000 per turbine, £13,000 in total, will be invested in local community schemes in the area each year. This will begin one year after commissioning has taken place. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Tappaghan Windfarm Ltd - A Castlederg Road Lack Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Tappaghan Extension 9 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4688 / EN00194
District:
|
Applicant: |
Greencoat UK Wind
Application :
L/2006/1553/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
|
Calculated capacity: |
9 |
Site Address: |
Lack, Tappaghan Mountains, Northern Ireland
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
31856 / 31856
|
Development Status: |
Operational
|
Application Submitted: |
6/12/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
7/1/2009
|
This Record Last Updated: |
1/5/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tappaghan 19.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3130 / N00081W
District:
|
Applicant: |
Greencoat UK Wind
Application :
L/2002/1042/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
13 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
|
Calculated capacity: |
19.5 |
Site Address: |
Lack, Tappaghan Mountains, Northern Ireland
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
31856 / 31856
|
Development Status: |
Operational
|
Application Submitted: |
8/1/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/1/2005
|
This Record Last Updated: |
1/5/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tappaghan Windfarm Ltd
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R00004NQNI
|
Capacity: |
28500
|
Status: |
Live
|
Accreditation Date: |
8/1/2002
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Tappaghan Windfarm (NI) Limited
|
Applicant Address: |
2nd Floor
83 - 85 Great Victoria St
Belfast
BT2 7AF
Northern Ireland
|
Address: |
Tappaghan Windfarm Ltd - A
Castlederg Road
Lack
Northern Ireland
|
Site Name: |
Tappaghan Windfarm Ltd
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00027NWNI
|
Capacity: |
28500
|
Status: |
Live
|
Accreditation Date: |
8/1/2002
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Tappaghan Windfarm (NI) Limited
|
Applicant Address: |
2nd Floor
83 - 85 Great Victoria St
Belfast
BT2 7AF
Northern Ireland
|
Address: |
Tappaghan Windfarm Ltd - A
Castlederg Road
Lack
Northern Ireland
|
|
Assumptions: Capacity: 28500kW 28.5 MW, Thus over the month Capacity * 720 hours per month = 20520 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 6735 | 23.63% | Issued | 01/02/2018 | | | 6480 | 22.74% | Issued | 01/01/2018 | | | 8888 | 31.19% | Issued | 01/12/2017 | | | 5861 | 20.56% | Retired | 01/11/2017 | | | 4836 | 16.97% | Retired | 01/10/2017 | | | 7036 | 24.69% | Retired | 01/09/2017 | | | 5599 | 19.65% | Retired | 01/08/2017 | | | 4057 | 14.24% | Retired | 01/07/2017 | | | 3805 | 13.35% | Retired | 01/06/2017 | | | 5275 | 18.51% | Retired | 01/05/2017 | | | 4321 | 15.16% | Issued | 01/04/2017 | | | 4905 | 17.21% | Issued | 01/03/2017 | | | 6696 | 23.49% | Issued | 01/02/2017 | | | 8024 | 28.15% | Issued | 01/01/2017 | | | 7181 | 25.20% | Issued | Dec-16 | | 8303 | 8302 | 29.13% | Retired | Nov-16 | | 4576 | 4576 | 16.06% | Retired | Oct-16 | | 5512 | 5512 | 19.34% | Retired | Sep-16 | | 5336 | 5336 | 18.72% | Retired | Aug-16 | | 5267 | 5267 | 18.48% | Retired | Jul-16 | | 3588 | 3588 | 12.59% | Retired | Jun-16 | | 3205 | 3205 | 11.25% | Retired | Jun-16 | | 3205 | 3205 | 11.25% | Issued | May-16 | | 5308 | 5308 | 18.62% | Issued | Apr-16 | | 5922 | 5922 | 20.78% | Issued | Mar-16 | | 5599 | 5600 | 19.65% | Issued | Feb-16 | | 7321 | 7321 | 25.69% | Issued | Jan-16 | | 8512 | 8512 | 29.87% | Issued | Dec-15 | | 11052 | 11052 | 38.78% | Retired | Nov-15 | | 8133 | 281 | 0.99% | Retired | Oct-15 | | 4624 | 4624 | 16.22% | Retired | Sep-15 | | 4072 | 4072 | 14.29% | Retired | Aug-15 | | 4199 | 4199 | 14.73% | Retired | Jul-15 | 4597 | 4598 | 4598 | 16.13% | Retired | Jun-15 | 5314 | 5314 | 5314 | 18.65% | Retired | May-15 | 7220 | 7220 | 7220 | 25.33% | Retired | Apr-15 | 3888 | 3888 | 3888 | 13.64% | Retired | Mar-15 | 7940 | 7939 | 7940 | 27.86% | Retired | Feb-15 | 6021 | 6020 | 6021 | 21.13% | Retired | Jan-15 | 10090 | 10090 | 10090 | 35.40% | Retired | Dec-14 | 7531 | 7531 | 7531 | 26.42% | Retired | Nov-14 | 4835 | 4835 | 4835 | 16.96% | Retired | Oct-14 | 7605 | 7605 | 7605 | 26.68% | Retired | Sep-14 | 2155 | 2140 | 2154 | 7.56% | Retired | Aug-14 | 5539 | 5539 | 5540 | 19.44% | Retired | Jul-14 | 3249 | 3249 | 3248 | 11.40% | Retired | Jun-14 | 2547 | 2547 | 2547 | 8.94% | Retired | May-14 | 4497 | 4497 | 4497 | 15.78% | Retired | Apr-14 | 5559 | 5558 | 5559 | 19.51% | Retired | Mar-14 | 7532 | 7532 | 7532 | 26.43% | Retired | Feb-14 | 8582 | 8582 | 8582 | 30.11% | Retired | Jan-14 | 7488 | 7488 | 7488 | 26.27% | Retired | Dec-13 | 11677 | 11678 | 11677 | 40.97% | Retired | Nov-13 | 4218 | 4218 | 4218 | 14.80% | Retired | Oct-13 | 6662 | 6662 | 1 | 0.00% | Retired | Sep-13 | 5506 | 5506 | 1 | 0.00% | Retired | Aug-13 | 4353 | 4353 | 4353 | 15.27% | Retired | Jul-13 | 2308 | 2287 | 2308 | 8.10% | Retired | Jun-13 | 3634 | 3633 | 3634 | 12.75% | Retired | May-13 | 6264 | 6264 | 6264 | 21.98% | Retired | Apr-13 | 7360 | 7360 | 7361 | 25.83% | Retired | Mar-13 | 8461 | 8461 | 8460 | 29.68% | Retired | Feb-13 | 6439 | 6439 | 6439 | 22.59% | Retired | Jan-13 | 7652 | 7651 | 7651 | 26.85% | Retired | Dec-12 | 7661 | 7662 | 7662 | 26.88% | Retired | Nov-12 | 6598 | 6598 | 6598 | 23.15% | Retired | Oct-12 | 4161 | 4161 | 4160 | 14.60% | Retired | Sep-12 | 6328 | 6328 | 6328 | 22.20% | Retired | Aug-12 | 4698 | 4699 | 4698 | 16.48% | Retired | Jul-12 | 3645 | 3645 | 3645 | 12.79% | Retired | Jun-12 | 4124 | 4123 | 4124 | 14.47% | Retired | May-12 | 4453 | 4453 | 4453 | 15.62% | Retired | Apr-12 | 5229 | 5229 | 5229 | 18.35% | Retired | Mar-12 | 1517 | 5880 | 5880 | 20.63% | Retired | Feb-12 | 6661 | 6660 | 6660 | 23.37% | Retired | Jan-12 | 9444 | 9444 | 9444 | 33.14% | Retired | Dec-11 | 8785 | 8784 | 8784 | 30.82% | Retired | Nov-11 | 9261 | 9262 | 9261 | 32.49% | Retired | Oct-11 | 7884 | 7884 | 7884 | 27.66% | Retired | Sep-11 | 8665 | 8665 | 8665 | 30.40% | Retired | Aug-11 | 2619 | 2566 | 2586 | 9.07% | Retired | Jul-11 | 2812 | 2793 | 2812 | 9.87% | Retired | Jun-11 | 3023 | 2974 | 2994 | 10.51% | Retired | May-11 | 10334 | 10202 | 10334 | 36.26% | Retired | Apr-11 | 5010 | 5205 | 5010 | 17.58% | Retired | Mar-11 | 4142 | 4119 | 4069 | 14.28% | Retired | Feb-11 | 6810 | 6811 | 6690 | 23.47% | Retired | Jan-11 | 5179 | 5179 | 92 | 0.32% | Revoked | Dec-10 | 4362 | 4363 | 4285 | 15.04% | Expired | Nov-10 | 6680 | 6475 | 6361 | 22.32% | Expired | Oct-10 | 6680 | 6681 | 6680 | 23.44% | Expired |
|
Capacity: 57 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/24/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|