vid = 3426pws_id = 350869pws_id = 350869 Sorry I found no matches, Please try again.

--------------------------------------------------------
Not Logged on, Max pages: 5( 1 Seen ) ID:657 Ind:1 IP: 54.225.55.174YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Nackington Farm Solar Farm

Subscribers see an interactive map with Nackington Farm Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Nackington Farm Solar Farm (Solar , Proposed)

 General Information.

Location in the UK : England, canterbury    
Type of installation: Solar    on/offshore: on
Solar Panels :120000  Capacity : 11 MW
Acreage:190   or approx Hectares : 76
Approx Date of 1st power generation:

/YES

 Comment

Nackington Farm Solar Park will be a 36Mw solar park located in Nackington, Canterbury. The site is 190 Acres in size and is situated on grade 3 agricultural land and will be covered in 120,780 solar panels. The site is currently open for planning consultation and is set to be submitted for planning permission in autumn 2013.

CA//14/00085/FUL: Nackington Farm, Nackington, Bridge, CT1 3NU The installation of a Solar Photovoltaic park complete with mounting
fixtures, security fence, inverters, CCTV and all necessary ancillary equipment required for such proposal. (Site C) Applicant: Green Energy
Reason: Public right of way/major development
CA//14/00086/FUL: Nackington Farm, Nackington, Lower Hardres, CT1 3NU The installation of a solar farm and solar generation equipment
complete with mounting equipment, security fence, CCTV and all necessary ancillary equipment associated with such proposal. (Site B)
Applicant: Green Energy Reason: Public right of way/major development
CA//14/00087/FUL: Nackington Farm, Nackington, Lower Hardres, CT1 3NU The construction of a solar PV generation farm complete
with security cameras, security fence, landscaping, screening, footpaths, mounting equipment, inverters, and all necessary equipment. (Site A)
Applicant: Green Energy UK Reason: Public right of way/major/conservation area

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Nackington Farm DECC Reference:C1097A

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Nackington Farm : Solar OFGEM Reference:-na-

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register
Project Info
Youtube of NACKINGTON FARM Solar Park

Green Energy UK Direct plans 10MW solar park in Canterbury
The proposed plans will see 20 hectares of land at NACKINGTON FARM turned into a 10MW solar park. Currently the agricultural land is used for wheat production.

©2018 Simon Mallett
Latest News Added
Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (‘the Variation Application’)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Pinewood Studio Wales, Cardiff
Ecotricity's first Welsh turbine - powering the development of high-tech solar panels. Sun and wind power comes together in a green revolution.
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Wind turbine on Coleraine campus
An 800 kW wind turbine generator has been installed on the Coleraine Campus since September 2008. Ulster University
Source: ulster, Date and Time of entry: 26 June 2018 00:00

Vestas receives 110 MW order for Bhlaraidh
The order includes delivery, installation, and a 10-year Active Output Management (AOM) 4000 service agreement. Installation is expected to begin in the fourth quarter of 2016, with commissioning scheduled for the first half of 2017.
Source: vestas, Date and Time of entry: 21 June 2018 00:00

The world's fifth biggest wind farm has opened off the Norfolk coast
Dubbed the Race Bank development, the wind farm is capable of powering more than half a million UK homes, according to the Danish energy firm Orsted.
Source: dailymail, Date and Time of entry: 13 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast: