vid = 3426pws_id = 350869pws_id = 350869
Not Logged on, Max pages: 5( 1 Seen ) ID:1969 Ind:1 IP: 54.81.116.187YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Nackington Farm Solar Farm

Subscribers see an interactive map with Nackington Farm Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Nackington Farm Solar Farm (Solar , Proposed)

 General Information.

Location in the UK : England, canterbury    
Type of installation: Solar    on/offshore: on
Solar Panels :120000  Capacity : 11 MW
Acreage:190   or approx Hectares : 76
Approx Date of 1st power generation:

/YES

 Comment

Nackington Farm Solar Park will be a 36Mw solar park located in Nackington, Canterbury. The site is 190 Acres in size and is situated on grade 3 agricultural land and will be covered in 120,780 solar panels. The site is currently open for planning consultation and is set to be submitted for planning permission in autumn 2013.

CA//14/00085/FUL: Nackington Farm, Nackington, Bridge, CT1 3NU The installation of a Solar Photovoltaic park complete with mounting
fixtures, security fence, inverters, CCTV and all necessary ancillary equipment required for such proposal. (Site C) Applicant: Green Energy
Reason: Public right of way/major development
CA//14/00086/FUL: Nackington Farm, Nackington, Lower Hardres, CT1 3NU The installation of a solar farm and solar generation equipment
complete with mounting equipment, security fence, CCTV and all necessary ancillary equipment associated with such proposal. (Site B)
Applicant: Green Energy Reason: Public right of way/major development
CA//14/00087/FUL: Nackington Farm, Nackington, Lower Hardres, CT1 3NU The construction of a solar PV generation farm complete
with security cameras, security fence, landscaping, screening, footpaths, mounting equipment, inverters, and all necessary equipment. (Site A)
Applicant: Green Energy UK Reason: Public right of way/major/conservation area

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Nackington Farm DECC Reference:C1097A

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Nackington Farm : Solar OFGEM Reference:-na-

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register
Project Info
Youtube of NACKINGTON FARM Solar Park

Green Energy UK Direct plans 10MW solar park in Canterbury
The proposed plans will see 20 hectares of land at NACKINGTON FARM turned into a 10MW solar park. Currently the agricultural land is used for wheat production.

©2018 Simon Mallett
Latest News Added
Wind farm aims to deliver 100m boost to South Lanarkshire economy
With construction of the 88MW Kype Muir Wind Farm, south of Strathaven, well underway, it is now estimated that the project will be worth more than 100m to the local economy.
Source: scotishconstruction, Date and Time of entry: 03 April 2018 00:00

Galloper offshore wind farm with 353MW capacity becomes fully operational
Construction of the 1.5bn wind farm began in November 2016. Full power generation was achieved on 29 March, as Siemens Gamesas last turbine was switched on.
Source: cleantech, Date and Time of entry: 03 April 2018 00:00

Blow me! Galloper wind farm off East Anglian coast hits full throttle
A 1.5bn wind farm off the coast of East Anglia has hit full throttle, just eighteen months after construction began.
Source: eadt, Date and Time of entry: 03 April 2018 00:00

First foundation installed for Aberdeen Bay wind farm
Vattenfall has released footage of the giant Asian Hercules crane vessel installing the first turbine foundation for the Aberdeen Bay wind farm.
Source: aberdeenjournals, Date and Time of entry: 03 April 2018 00:00

Glenfiddich owner loses Dorenell wind farm objection
William Grant and Sons objected to the Dorenell wind farm on the grounds it would spoil the local countryside and reduce visitor numbers.
Source: bbc, Date and Time of entry: 03 April 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom