vid = 3308pws_id = 352327pws_id = 352327
--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:4247 Ind:1 IP: 52.14.240.178 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Garreg Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Garreg Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Garreg Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales,    
Type of installation: Wind    on/offshore: on
Turbines :23  Capacity : 46 MW
Approx Date of 1st power generation: February 2017

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Refused - Appeal Lodged

The proposed Garreg Lwyd Hill Wind Farm is situated between Felindre and Llanbadarn Fynydd in Radnorshire, Powys and is located in the Newtown South Strategic Search Area (SSA), for which is described by the Welsh Assembly in Technical Advice Note 8 (TAN8) - Renewable Energy. TAN8 has set out seven SSAs in Wales which were chosen for the good wind speeds and lack of statutory designations and are considered to be suitable for large scale wind farms, such as Garreg Lwyd Hill.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Garreg Lwyd Hill Between Felindre and Llanbadarn Fynydd Newtown LD1 6YF Wales

 Associated Companies.

Relationship Company (For: Garreg )
DeveloperRES Renewable Energy Systems Ltd
OwnerRES Renewable Energy Systems Ltd
OperatorRES Renewable Energy Systems Ltd

 DECC Data on this Project: Garreg :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Garreg Lwyd     34 MW
Energy Type: Wind Onshore
County: Powys     Country: Wales     LPA: Powys County Council
Site ID and Reference: 3711 / A0287     District:
Applicant: Renewables Infrastructure Group (TRIG)     Application : P/2008/0785 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 17 Turbine Capacity: 2
Height of Turbines: 137 Calculated capacity: 34
Site Address: Garreg Lwyd Hill Between Felindre & Llanbadarn Fynydd, Llandrindod Wells, Powys
  LD1 6YF
County: Powys Region: Wales
OS Coordinates: 312758 / 312758
Development Status: Operational
Application Submitted: 5/27/2008 Planning Permission Granted
Application Determined: Permission refused: 9/5/2013
Construction Date: 1/11/2016    
Generator Live 2/22/2017 This Record Last Updated: 10/4/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 3/4/2014
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 9/5/2013

 OFGEM Data on this Project: Garreg: Wind :

Site Name: Garreg Lwyd Hill
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00205RQWA
Capacity: 33000 Status: Live
Accreditation Date: 5/27/2008    
Commission Date: 2/22/2017    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Garreg Lwyd Hill Ddol Llanbadarn Fynydd Llanddrindon Wells LD1 6YF Wales

Site Name: Garreg Lwyd Hill
Generator Type: Wind
Scheme : REGO Generator ID: G01658NWWA
Capacity: 33000 Status: Live
Accreditation Date: 5/27/2008    
Commission Date: 2/22/2017    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Garreg Lwyd Hill Ddol Llanbadarn Fynydd Llanddrindon Wells LD1 6YF Wales
 
Assumptions: Capacity: 33000kW 33 MW,
Thus over the month Capacity * 720 hours per month = 23760 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 9538 28.90% Issued
01/02/2018 9382 28.43% Issued
01/01/2018 12517 37.93% Issued
01/12/2017 12312 37.31% Issued
01/11/2017 9804 29.71% Issued
01/10/2017 9734 29.50% Issued
01/09/2017 8411 25.49% Issued
01/08/2017 7533 22.83% Issued
01/07/2017 7345 22.26% Issued
01/06/2017 9649 29.24% Issued

 Calculations


Capacity: 68
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/25/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 68 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352327

Project Info
Turbines up at GARREG Lywd
The 17th and final turbine has been installed at RES’ 30.6MW GARREG Lwyd Hill wind farm in Powys in Wales. Testing and commissioning works of the site’s Vestas V100 hardware are ongoing ahead of full operations.

This is the waterfall which formed as a reservoir
Caban Coch is part of a series of Elan Valley Reservoirs that include the Claerwen, Craig-goch, Pen-y-GARREG and GARREG-ddu.

res: GARREG LWYD HILL WIND FARM

GARREG LWYD HILL WIND FARM WEBSITE

Stonewall Hill Conservation Group
In their Officers’ report, Powys Planning Officers are recommending refusal of RES’ proposed GARREG Lwyd Hill Wind Farm (P.2008.0785) above Felindre.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School