vid = 327pws_id = 350283pws_id = 350283
--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:725 Ind:1 IP: 54.205.116.187 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Royal Seaforth Dock Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Royal Seaforth Dock Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Royal Seaforth Dock Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Merseyside    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 3.6 MW
Approx Date of 1st power generation: April 1999

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

This scheme comprises 6 x Vestas V44 turbines (600 kW each) with an installed capacity of 3.6 MW. It is owned and operated by Peel Energy and has been running since 1999 under a NFFO contract.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Royal Seaforth Docks Port of Liverpool Sefton Liverpool L20 1BG England

 Associated Companies.

Relationship Company (For: Royal Seaforth Dock )
DeveloperPeel Energy
OperatorPeel Energy
OwnerPeel Energy

 DECC Data on this Project: Royal Seaforth Dock :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Royal Seaforth Dock Wind Farm     3 MW
Energy Type: Wind Onshore
County: Merseyside     Country: England     LPA: Sefton Council
Site ID and Reference: 2574 / 04076W3     District:
Applicant: Mersey Docks and Harbour Company and Windcluster Limited     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 0.5
Height of Turbines: Calculated capacity: 3
Site Address: Royal Seaforth Dock Port of Liverpool Bootle, Sefton Merseyside
 
County: Merseyside Region: North West
OS Coordinates: 331100 / 331100
Development Status: Operational
Application Submitted: 10/12/1995 Planning Permission Granted
Application Determined: Permission refused: 8/22/1997
Construction Date:    
Generator Live 4/24/1999 This Record Last Updated: 2/10/2003
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/22/1997

 OFGEM Data on this Project: Royal Seaforth Dock: Wind :

Site Name: ROYAL SEAFORTH DOCKS
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00031RQEN
Capacity: 2970 Status: Live
Accreditation Date: 10/12/1995    
Commission Date: 4/9/1999    
Applicant: Seaforth Windfarm Ltd
Applicant Address: Peel Holdings Ltd The Dome MANCHESTER M17 8PL England
Address: Royal Seaforth Docks Port of Liverpool Sefton Liverpool L20 1BG England

Site Name: ROYAL SEAFORTH DOCKS
Generator Type: Wind
Scheme : REGO Generator ID: G00219NWEN
Capacity: 2970 Status: Live
Accreditation Date: 10/12/1995    
Commission Date: 4/9/1999    
Applicant: Seaforth Windfarm Ltd
Applicant Address: Peel Holdings Ltd The Dome MANCHESTER M17 8PL England
Address: Royal Seaforth Docks Port of Liverpool Sefton Liverpool L20 1BG England
 
Assumptions: Capacity: 2970kW 2.97 MW,
Thus over the month Capacity * 720 hours per month = 2138.4 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 532 17.91% Issued
01/02/2018 579 19.49% Issued
01/01/2018 959 32.29% Issued
01/12/2017 753 25.35% Issued
01/11/2017 749 25.22% Issued
01/10/2017 736 24.78% Issued
01/09/2017 585 19.70% Issued
01/08/2017 456 15.35% Issued
01/07/2017 384 12.93% Issued
01/06/2017 551 18.55% Issued
01/05/2017 300 10.10% Issued
01/04/2017 624 21.01% Issued
01/03/2017 615 20.71% Redeemed
01/02/2017 612 20.61% Redeemed
01/01/2017 636 21.41% Redeemed
Dec-16 0560 560 18.86% Issued
Nov-16 0458 458 15.42% Issued
Oct-16 0218 221 7.44% Issued
Sep-16 0543 543 18.28% Issued
Aug-16 0651 651 21.92% Issued
Jul-16 0507 507 17.07% Issued
Jun-16 0207 210 7.07% Issued
Jun-16 0207 210 7.07% Issued
May-16 0314 314 10.57% Issued
Apr-16 0519 519 17.47% Issued
Mar-16 0348 350 11.78% Redeemed
Feb-16 0620 620 20.88% Redeemed
Jan-16 0763 763 25.69% Redeemed
Dec-15 0932 932 31.38% Redeemed
Nov-15 0960 960 32.32% Redeemed
Oct-15 0347 349 11.75% Redeemed
Sep-15 0293 295 9.93% Redeemed
Aug-15 0368 368 12.39% Redeemed
Jul-15 607606 607 20.44% Expired
Jun-15 461461 461 15.52% Redeemed
May-15 852852 852 28.69% Redeemed
Apr-15 437435 437 14.71% Redeemed
Mar-15 752752 752 25.32% Redeemed
Feb-15 558558 558 18.79% Redeemed
Jan-15 11201120 1120 37.71% Redeemed
Dec-14 10471047 1047 35.25% Redeemed
Nov-14 427427 427 14.38% Redeemed
Oct-14 665665 665 22.39% Redeemed
Sep-14 146143 146 4.92% Redeemed
Aug-14 778778 778 26.20% Redeemed
Jul-14 314311 314 10.57% Redeemed
Jun-14 190188 190 6.40% Redeemed
May-14 433431 433 14.58% Redeemed
Apr-14 440440 440 14.81% Redeemed
Mar-14 599598 598 20.13% Redeemed
Feb-14 10111011 1011 34.04% Redeemed
Jan-14 847847 847 28.52% Redeemed
Dec-13 10531053 1053 35.45% Redeemed
Nov-13 653653 653 21.99% Redeemed
Oct-13 691691 691 23.27% Redeemed
Sep-13 431431 431 14.51% Redeemed
Aug-13 5454 54 1.82% Redeemed
Jul-13 244241 244 8.22% Redeemed
Jun-13 550550 550 18.52% Redeemed
May-13 739739 739 24.88% Redeemed
Apr-13 722722 722 24.31% Redeemed
Mar-13 474474 474 15.96% Redeemed
Feb-13 534535 535 18.01% Redeemed
Jan-13 690690 690 23.23% Redeemed
Dec-12 946946 946 31.85% Redeemed
Nov-12 696696 696 23.43% Redeemed
Oct-12 538538 538 18.11% Redeemed
Sep-12 815815 815 27.44% Redeemed
Aug-12 472469 472 15.89% Redeemed
Jul-12 545545 545 18.35% Redeemed
Jun-12 663664 664 22.36% Redeemed
May-12 465465 465 15.66% Redeemed
Apr-12 649649 649 21.85% Redeemed
Mar-12 409406 408 13.74% Redeemed
Feb-12 594595 595 20.03% Redeemed
Jan-12 720720 720 24.24% Redeemed
Dec-11 13301330 1330 44.78% Redeemed
Nov-11 695695 695 23.40% Redeemed
Oct-11 974974 974 32.79% Redeemed
Sep-11 905906 906 30.51% Redeemed
Aug-11 597596 596 20.07% Redeemed
Jul-11 455452 455 15.32% Redeemed
Jun-11 499499 499 16.80% Redeemed
May-11 12181218 1218 41.01% Redeemed
Apr-11 429427 429 14.44% Redeemed
Mar-11 368365 369 12.42% Redeemed
Feb-11 729729 729 24.55% Expired
Jan-11 552552 552 18.59% Expired
Dec-10 385382 384 12.93% Expired
Nov-10 622622 622 20.94% Expired
Oct-10 641641 641 21.58% Expired

 Calculations


Capacity: 7.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 3/28/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 7.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350283

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School