Sorry I found no matches, Please try again.
Nissan Wind Farm Sorry I found no matches, Please try again.
vid = 288pws_id = 351864pws_id = 351864
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.214.184.124YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Nissan Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Nissan Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Nissan Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Tyne & Wear    
Type of installation: Wind    on/offshore: on
Turbines :10  Capacity : 6.6 MW
Approx Date of 1st power generation: November 2005

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Nissan Motors Plant- Sunderland: The six-turbine facility is the first wind farm within the global Nissan group and will generate 4 Megawatts a year - around 5% of the factorys annual electricity requirement.

Nissan Motor Co.'s Sunderland plant in the UK will start the installation of two additional wind turbines in December 2007, bringing the total number of turbines on the site to eight. Expected to be fully operational in January 2008, the expanded farm will generate around 6% of the plant's annual energy requirement, cutting costs by nearly 1 million a year. Carbon dioxide emissions will also be cut by up to 4,000 tonnes per year at power plants supplying the factory with electricity.
Nissan Motors Extension additional 3 turbines at 0.66MW total of 1.98MW Completed December 2011

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Nissan DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Nissan : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 5.28
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/12/2019
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5.28 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351864


Weather Station Name : Hetton-Le-Hole Latitude: 54.8279 Longitude: -1.4527 Elevation: 87

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00N 7 5 / 25 0
12/07/2018 12:00:00NE 9 5 / 25 0
12/07/2018 15:00:00ENE 11 5 / 25 0
12/07/2018 18:00:00NE 9 5 / 25 0
12/07/2018 21:00:00NE 4 5 / 25 0
13/07/2018N 2 5 / 25 0
13/07/2018 03:00:00NNE 2 5 / 25 0
13/07/2018 06:00:00ENE 2 5 / 25 0
13/07/2018 09:00:00E 4 5 / 25 0
13/07/2018 12:00:00ESE 7 5 / 25 0
13/07/2018 15:00:00ESE 7 5 / 25 0
13/07/2018 18:00:00SE 9 5 / 25 0
13/07/2018 21:00:00SE 7 5 / 25 0
14/07/2018SSW 7 5 / 25 0
14/07/2018 03:00:00SW 7 5 / 25 0
14/07/2018 06:00:00WSW 4 5 / 25 0
14/07/2018 09:00:00WSW 4 5 / 25 0
14/07/2018 12:00:00SSW 7 5 / 25 0
14/07/2018 15:00:00SW 7 5 / 25 0
14/07/2018 18:00:00WSW 9 5 / 25 0
14/07/2018 21:00:00WSW 4 5 / 25 0
15/07/2018SW 4 5 / 25 0
15/07/2018 03:00:00SSW 4 5 / 25 0
15/07/2018 06:00:00SW 7 5 / 25 0
15/07/2018 09:00:00SSW 7 5 / 25 0
15/07/2018 12:00:00SSW 9 5 / 25 0
15/07/2018 15:00:00SSW 9 5 / 25 0
15/07/2018 18:00:00WSW 9 5 / 25 0
15/07/2018 21:00:00WSW 4 5 / 25 0
16/07/2018WSW 4 5 / 25 0
16/07/2018 03:00:00WSW 4 5 / 25 0
16/07/2018 06:00:00SW 4 5 / 25 0
16/07/2018 09:00:00SSW 4 5 / 25 0
16/07/2018 12:00:00SSW 7 5 / 25 0
16/07/2018 15:00:00SW 7 5 / 25 0
16/07/2018 18:00:00WSW 4 5 / 25 0
16/07/2018 21:00:00NNE 4 5 / 25 0
Project Info
bbc news item

Case Study

AutoblogGreen

New solar farm switched on at NISSAN Sunderland
NISSAN has switched on a new solar farm at its biggest manufacturing site in Europe. Made of up 19,000 photo-voltaic panels, the new 4.75MW facility is now fully operational at NISSAN Sunderland Plant.

NISSAN seeks fair wind for farm
The car maker plans to power the factory with seven turbines, capable of producing enough electricity to power the equivalent of 2,600 homes.

©2018 Simon Mallett
Latest News Added
MHI Vestas secures Seagreen turbine gig
MHI Vestas has entered into a preferred supplier agreement to supply and service up to 114 wind turbines for the 1100MW Seagreen offshore wind farm being built in Scottish waters.
Source: renews, Date and Time of entry: 18 October 2019 00:00

Corbyn says Fife wind farm contract plan -not credible
Jeremy Corbyn says plans to manufacture parts for a 2bn wind farm off the Fife coast at a site thousands of miles away are not credible.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Noisy wind farm extension paused after Barrow residents object
Residents claiming a nearby wind farm has been noisy for 20 years have convinced councillors to pause plans to keep it open for another decade.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Glenshimmeroch wind farm project approved on appeal
A 10-turbine wind farm in southern Scotland has been approved on appeal. Developers Energiekontor took the case to the Scottish government over Dumfries and Galloway Council's failure to issue a decision.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Workers at Isle of Lewis BiFab yard to lose jobs
Workers at a fabrication yard, which was brought back into use just six months ago, have been told they will not have their contracts renewed.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School