vid = 2800pws_id = 354064pws_id = 354064 Sorry I found no matches, Please try again.

--------------------------------------------------------
Not Logged on, Max pages: 5( 1 Seen ) ID:657 Ind:1 IP: 54.224.247.42YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Marshborough Solar Farm

Subscribers see an interactive map with Marshborough Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Marshborough Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Marshborough Sandwich    
Type of installation: Solar    on/offshore: on
Solar Panels :12800  Capacity : 12.7 MW
Acreage:50   or approx Hectares : 20
Approx Date of 1st power generation: November 2015

/YES

 Comment

A revised application is being submitted. Has been accepted. The development is smaller and towards the Ash Road.

Construction due to start July / August 2015

Each array would measure 3.3m wide by 12.3m long, tilted at 15° from the horizontal and have a maximum height of 1.7m above ground level.

The developers say there are only a few residential dwellings from which the solar farm would be visible. The nearest dwellings lie 150m to the north-west off the A257.

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Marshborough DECC Reference:C1250

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Marshborough : Solar OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register
Project Info
MARSHBOROUGH Solar Farm Planning Application

Solar Panel Farm at Each End/MARSHBOROUGH
Not withstanding the technical content and planning argument, the documents make for fascinating reading if, like me, you have an interest in the archeologogy of the area and the conservation of its wildlife.

‘Incongruous and alien’ solar farm refused planning permission
The application, submitted by Sunsave 16 (MARSHBOROUGH) Ltd, would have seen 65,520 modules installed across 19.7 hectares of agricultural land, producing enough electricity to power 4,500 local homes.

Solar Panel Farm at Each End/MARSHBOROUGH
A planning application for a large ground based electricity generating solar panel farm to be sited in MARSHBOROUGH close to Each End has been submitted to Dover District Council’s planning department.

©2018 Simon Mallett
Latest News Added
Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (‘the Variation Application’)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Pinewood Studio Wales, Cardiff
Ecotricity's first Welsh turbine - powering the development of high-tech solar panels. Sun and wind power comes together in a green revolution.
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

Wind turbine on Coleraine campus
An 800 kW wind turbine generator has been installed on the Coleraine Campus since September 2008. Ulster University
Source: ulster, Date and Time of entry: 26 June 2018 00:00

Vestas receives 110 MW order for Bhlaraidh
The order includes delivery, installation, and a 10-year Active Output Management (AOM) 4000 service agreement. Installation is expected to begin in the fourth quarter of 2016, with commissioning scheduled for the first half of 2017.
Source: vestas, Date and Time of entry: 21 June 2018 00:00

The world's fifth biggest wind farm has opened off the Norfolk coast
Dubbed the Race Bank development, the wind farm is capable of powering more than half a million UK homes, according to the Danish energy firm Orsted.
Source: dailymail, Date and Time of entry: 13 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast: