Sorry I found no matches, Please try again.
Lynch Knoll Wind Farm Sorry I found no matches, Please try again.
vid = 256pws_id = 354163pws_id = 354163
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.80.85.76YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Lynch Knoll Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Lynch Knoll Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Lynch Knoll Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Gloucestershire    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.5 MW
Approx Date of 1st power generation: December 1996

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Ecotricity " We built this windmill on Friday the 13th (Dec 1996)"

Rotor Diameter: 40M
Hub Height: 42M

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Lynch Knoll DECC Reference:N00005W

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Lynch Knoll : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 0.5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/12/2018
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 0.5 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354163


Weather Station Name : Westonbirt - The National Arboretum Latitude: 51.6072 Longitude: -2.2145 Elevation: 131

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00NE 4 5 / 25 0
12/07/2018 12:00:00ENE 7 5 / 25 0
12/07/2018 15:00:00E 4 5 / 25 0
12/07/2018 18:00:00SSW 4 5 / 25 0
12/07/2018 21:00:00SSE 2 5 / 25 0
13/07/2018WSW 2 5 / 25 0
13/07/2018 03:00:00ESE 2 5 / 25 0
13/07/2018 06:00:00ESE 4 5 / 25 0
13/07/2018 09:00:00S 4 5 / 25 0
13/07/2018 12:00:00S 4 5 / 25 0
13/07/2018 15:00:00SSE 4 5 / 25 0
13/07/2018 18:00:00SSW 7 5 / 25 0
13/07/2018 21:00:00SW 4 5 / 25 0
14/07/2018WSW 4 5 / 25 0
14/07/2018 03:00:00W 4 5 / 25 0
14/07/2018 06:00:00NW 4 5 / 25 0
14/07/2018 09:00:00WSW 4 5 / 25 0
14/07/2018 12:00:00WSW 7 5 / 25 0
14/07/2018 15:00:00WSW 7 5 / 25 0
14/07/2018 18:00:00W 9 5 / 25 0
14/07/2018 21:00:00W 7 5 / 25 0
15/07/2018W 4 5 / 25 0
15/07/2018 03:00:00W 4 5 / 25 0
15/07/2018 06:00:00W 4 5 / 25 0
15/07/2018 09:00:00WSW 4 5 / 25 0
15/07/2018 12:00:00SW 7 5 / 25 0
15/07/2018 15:00:00WSW 7 5 / 25 0
15/07/2018 18:00:00W 9 5 / 25 0
15/07/2018 21:00:00WNW 7 5 / 25 0
16/07/2018WNW 4 5 / 25 0
16/07/2018 03:00:00NW 4 5 / 25 0
16/07/2018 06:00:00NW 4 5 / 25 0
16/07/2018 09:00:00NW 7 5 / 25 0
16/07/2018 12:00:00W 7 5 / 25 0
16/07/2018 15:00:00WNW 9 5 / 25 0
16/07/2018 18:00:00WNW 9 5 / 25 0
16/07/2018 21:00:00WNW 9 5 / 25 0
Project Info
Ecotricity: LYNCH KNOLL, Gloucestershire

Nympsfield wind turbine marks a milestone
Commissioned on Friday, December 13, 1996, the 60-metre LYNCH KNOLL turbine has, generated over 15 million units (kWh) of electricity – enough to power 227 local homes and prevented almost 6,500 tonnes of CO₂from entering the atmosphere

16 years of proving wind power
(2012) Ecotricity’s first windmill (LYNCH KNOLL) turns 16-years-old this week, standing testament to wind-power and will-power.

LYNCH KNOLL wind turbine celebrates 5 years of clean electricity!
(2001) Ecotricity, the world's first 'green' electricity company, is celebrating five years of clean electricity generated by the wind turbine at LYNCH KNOLL on the outskirts of Stroud.

©2018 Simon Mallett
Latest News Added
Norfolk Vanguard
The 1.8 gigawatt (GW) capacity project would meet the equivalent electricity needs of 5% of UK households* - around 1.3 million homes.
Source: vattenfall, Date and Time of entry: 16 November 2018 00:00

Tangy Repower
In August 2018, SSE submitted a Section 36 Application to Scottish Ministers seeking consent to replace the existing 22 operational turbines for 16 modern, more efficient machines.
Source: sse, Date and Time of entry: 16 November 2018 00:00

Plans to expand Crystal Rig wind farm lodged
A bid has been lodged to expand a wind farm in the Lammermuir Hills, taking its turbine total to more than 100.
Source: bbc, Date and Time of entry: 16 November 2018 00:00

Extra 11 turbines at Crystal Rig wind farm
Fred Olsen Ltd, has submitted an application to the Scottish Government’s Energy Consents Unit for an additional 11 turbines to the south of the current wind farm site that has 91 turbines, developed in three separate stages.
Source: berwickshire news, Date and Time of entry: 16 November 2018 00:00

Heckington Fen Onshore Wind Farm
Application under section 36C to Vary the Existing s.36 Consent for the Heckington Fen Wind Farm (‘the Variation Application’)
Source: ecotricity, Date and Time of entry: 28 June 2018 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School