Sorry I found no matches, Please try again.
Chelveston Wind Farm Sorry I found no matches, Please try again.
vid = 2302pws_id = 3560pws_id = 3560
--------------------------------------------------------
Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.214.224.224YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Chelveston Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Chelveston Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Chelveston Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Chelveston Airfield    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 22.5 MW
Approx Date of 1st power generation: February 2014

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Chelveston Renewable Energy park:a biomass Anaerobic Digestion plant and bio-fuelled generators have been approved with the capacity to produce 2 and 6MW of renewable electricity respectively to feed into the local network.
125m high to blade tip.
Current plans for a windfarm will complement these facilities and take the capacity to over 30MW. With the windfarm fully integrated within the renewable energy park CREL will be able to export a base load from the biomass plant of 1.5 MW with on average, approaching 7MW from the wind power. A further 6MW will be available on demand from the biofuelled engine generators at times of low windpower or high electricity demand. Together these can provide an estimated annual 109,000 MWh of renewable electricity sufficient for 27,500 households and offsetting some 47,000 tonnes a year of CO2 emissions from power stations.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Subscribed version includes full address details of project site

 Associated Companies.

Subscribed version includes associated companies along with address and other contact details, also link to company and crossreference to their projects (still being populated, 90% complete for Solar projects)
Subscriber Register

 DECC Data on this Project: Chelveston DECC Reference:

Subscribed version includes access to DECC data where it exists for this project.
Also facility to include a mix of DECC data within csv downloads

Subscriber Register

 OFGEM Data on this Project: Chelveston : Wind OFGEM Reference:

Subscribed version includes access to OFGEM data where it exists for this project.
Also facility to include a mix of OFGEM data within csv downloads

Subscriber Register

 Calculations


Capacity: 22.5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 21/02/2020
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 22.5 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 3560


Weather Station Name : Bedford Latitude: 52.225 Longitude: -0.464 Elevation: 85

DateWind DirectionWind SpeedStart / StopCapacity Factor Output MW/hrGenerated MWhrs
12/07/2018 09:00:00NNE 7 5 / 25 0
12/07/2018 12:00:00NE 7 5 / 25 0
12/07/2018 15:00:00ENE 7 5 / 25 0
12/07/2018 18:00:00ENE 7 5 / 25 0
12/07/2018 21:00:00NE 7 5 / 25 0
13/07/2018NE 7 5 / 25 0
13/07/2018 03:00:00NE 7 5 / 25 0
13/07/2018 06:00:00ENE 7 5 / 25 0
13/07/2018 09:00:00E 7 5 / 25 0
13/07/2018 12:00:00E 7 5 / 25 0
13/07/2018 15:00:00ESE 7 5 / 25 0
13/07/2018 18:00:00SSE 7 5 / 25 0
13/07/2018 21:00:00S 4 5 / 25 0
14/07/2018SSE 7 5 / 25 0
14/07/2018 03:00:00SSE 4 5 / 25 0
14/07/2018 06:00:00S 4 5 / 25 0
14/07/2018 09:00:00SSW 7 5 / 25 0
14/07/2018 12:00:00SSW 7 5 / 25 0
14/07/2018 15:00:00SSW 7 5 / 25 0
14/07/2018 18:00:00SW 7 5 / 25 0
14/07/2018 21:00:00W 4 5 / 25 0
15/07/2018SSW 4 5 / 25 0
15/07/2018 03:00:00WSW 4 5 / 25 0
15/07/2018 06:00:00WSW 4 5 / 25 0
15/07/2018 09:00:00SW 4 5 / 25 0
15/07/2018 12:00:00SSW 7 5 / 25 0
15/07/2018 15:00:00SW 7 5 / 25 0
15/07/2018 18:00:00SW 7 5 / 25 0
15/07/2018 21:00:00W 7 5 / 25 0
16/07/2018W 7 5 / 25 0
16/07/2018 03:00:00WSW 4 5 / 25 0
16/07/2018 06:00:00W 4 5 / 25 0
16/07/2018 09:00:00W 7 5 / 25 0
16/07/2018 12:00:00WSW 7 5 / 25 0
16/07/2018 15:00:00W 9 5 / 25 0
16/07/2018 18:00:00W 9 5 / 25 0
16/07/2018 21:00:00WNW 7 5 / 25 0
Project Info
CHELVESTON: Viewpoint Locations

CHELVESTON Renewable Energy home site

CHELVESTON: Flickr aerial photo

Solar installation on the old CHELVESTON airfield: aerial 2014
Geograph

Northamptonshire could become 'wind farm capital'
The government has approved turbines for Bozeat, Kelmarsh, Boddington and Watford Lodge. Best renewable energy Appeals are also pending for wind farms at Sudborough, CHELVESTON, Helmdon, Lilbourne and Winwick.

©2018 Simon Mallett
Latest News Added
MHI Vestas secures Seagreen turbine gig
MHI Vestas has entered into a preferred supplier agreement to supply and service up to 114 wind turbines for the 1100MW Seagreen offshore wind farm being built in Scottish waters.
Source: renews, Date and Time of entry: 18 October 2019 00:00

Corbyn says Fife wind farm contract plan -not credible
Jeremy Corbyn says plans to manufacture parts for a 2bn wind farm off the Fife coast at a site thousands of miles away are not credible.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Noisy wind farm extension paused after Barrow residents object
Residents claiming a nearby wind farm has been noisy for 20 years have convinced councillors to pause plans to keep it open for another decade.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Glenshimmeroch wind farm project approved on appeal
A 10-turbine wind farm in southern Scotland has been approved on appeal. Developers Energiekontor took the case to the Scottish government over Dumfries and Galloway Council's failure to issue a decision.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

Workers at Isle of Lewis BiFab yard to lose jobs
Workers at a fabrication yard, which was brought back into use just six months ago, have been told they will not have their contracts renewed.
Source: bbc, Date and Time of entry: 14 October 2019 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School