Sorry I found no matches, Please try again. 176
vid = 2144pws_id = 353481pws_id = 353481 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.82.3.33 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Higher Hatherleigh Solar Farm

Subscribers see an interactive map with Higher Hatherleigh Solar Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Solar projects and details.


Subscribe to Solar for exact generator location including nearby generators
For an example of a solar project see: Lenham Solar Farm


Subscribe for £500 to include full csv and KML downloads of all Solar project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Higher Hatherleigh Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, North Cheriton, Templecombe, Somerset    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 5 MW
Approx Date of 1st power generation: Feb 2013

/YES

 Comment

Apr 12 - application, aug 12 - approved.
40 acres (3.5mW increased to 5mW)
Higher Hatherleigh Farm Solar Park.
Grove Lane
North Cheriton
Templecombe
Somerset
BA9 8AE

 Address

Higher Hatherleigh Farm Wincanton Somerset BA9 8AE England

 Associated Companies.

Relationship Company (For: Higher Hatherleigh )
InstallerGEW2
Land OwnerHigher Hatherleigh Farm Solar Park.
DeveloperHive Energy
OperatorHive Energy
OperatorNext Energy Solar Holdings

 DECC Data on this Project: Higher Hatherleigh :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Higher Hatherleigh Solar Farm extension     1.5 MW
Energy Type: Solar Photovoltaics
County: Somerset     Country: England     LPA: South Somerset District Council
Site ID and Reference: 1355 / C0975     District:
Applicant: Private Developer     Application : 12/03914/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land At Higher Hatherleigh Farm Grove Lane North Cheriton Templecombe Somerset
 
County: Somerset Region: South West
OS Coordinates: 371305 / 371305
Development Status: Operational
Application Submitted: 10/5/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 3/28/2013 This Record Last Updated: 7/14/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Higher Hatherleigh Solar Farm     3.5 MW
Energy Type: Solar Photovoltaics
County: Somerset     Country: England     LPA: South Somerset District Council
Site ID and Reference: 1586 / AA702     District:
Applicant: Hive Energy     Application : 12/00884/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Grove Lane, North Cheriton, Templecombe, Somerset, BA9 8AE
 
County: Somerset Region: South West
OS Coordinates: 370149 / 370149
Development Status: Operational
Application Submitted: 3/9/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 3/28/2013 This Record Last Updated: 7/14/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Higher Hatherleigh: Solar :

Site Name: Higher Hatherleigh Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00107RUEN
Capacity: 4900 Status: Live
Accreditation Date: 3/9/2012    
Commission Date: 4/15/2013    
Applicant: Next Energy Solar Holdings
Applicant Address: c/o Laggan And Associates Ltd 7-10 Chandos Street LONDON W1G 9DQ England
Address: Higher Hatherleigh Farm Wincanton Somerset BA9 8AE England

Site Name: Higher Hatherleigh Farm
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G04841PVEN
Capacity: 4900 Status: Live
Accreditation Date: 3/9/2012    
Commission Date: 4/15/2013    
Applicant: Next Energy Solar Holdings
Applicant Address: c/o Laggan And Associates Ltd 7-10 Chandos Street LONDON W1G 9DQ England
Address: Higher Hatherleigh Farm Wincanton Somerset BA9 8AE England
 
Assumptions: Capacity: 4900kW 4.9 MW,
Thus over the month Capacity * 720 hours per month = 3528 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 393 8.02% Issued
01/02/2018 392 8.00% Issued
01/01/2018 150 3.06% Issued
01/12/2017 130 2.65% Issued
01/11/2017 221 4.51% Issued
01/10/2017 336 6.86% Issued
01/09/2017 485 9.90% Issued
01/08/2017 679 13.86% Issued
01/07/2017 781 15.94% Issued
01/06/2017 763 15.57% Issued
01/05/2017 797 16.27% Issued
01/04/2017 760 15.51% Issued
01/03/2017 470 9.59% Issued
01/02/2017 219 4.47% Redeemed
01/01/2017 167 3.41% Redeemed
Dec-16 0176 117 2.39% Issued
Nov-16 0301 195 3.98% Issued
Oct-16 0651 412 8.41% Issued
Sep-16 0795 501 10.22% Issued
Aug-16 01232 770 15.71% Issued
Jul-16 01310 819 16.71% Issued
Jul-16 01310 819 16.71% Issued
Jun-16 01009 631 12.88% Issued
May-16 01369 856 17.47% Issued
Apr-16 0948 596 12.16% Issued
Feb-16 0497 316 6.45% Redeemed
Jan-16 0254 165 3.37% Redeemed
Dec-15 0143 96 1.96% Redeemed
Nov-15 0196 128 2.61% Redeemed
Oct-15 0554 12 0.24% Revoked
Sep-15 01049 659 13.45% Redeemed
Aug-15 0942 592 12.08% Redeemed
Jul-15 7721235 772 15.76% Redeemed
Jun-15 9101456 910 18.57% Redeemed
May-15 8241318 824 16.82% Redeemed
Apr-15 8311330 831 16.96% Redeemed
Mar-15 520825 520 10.61% Redeemed
Feb-15 301472 300 6.12% Redeemed
Jan-15 185287 186 3.80% Redeemed
Dec-14 156240 156 3.18% Redeemed
Nov-14 199309 198 4.04% Redeemed
Oct-14 353557 2 0.04% Revoked
Sep-14 589936 30 0.61% Redeemed
Aug-14 7541206 754 15.39% Redeemed
Jul-14 9631542 963 19.65% Redeemed
Jun-14 9131461 913 18.63% Redeemed
May-14 7751245 778 15.88% Redeemed
Apr-14 6531045 657 13.41% Redeemed
Mar-14 581928 585 11.94% Redeemed
Feb-14 308493 313 6.39% Expired
Jan-14 163260 169 3.45% Expired
Dec-13 123197 130 2.65% Expired
Nov-13 203326 209 4.27% Expired
Oct-13 326521 331 6.76% Expired
Sep-13 488780 492 10.04% Expired
Aug-13 6391023 642 13.10% Expired
Jul-13 9351501 938 19.14% Expired
Jun-13 8211317 823 16.80% Expired
May-13 589942 592 12.08% Expired
Apr-13 246394 248 5.06% Expired

Project Info
case study by installer, Hive (informative)

write up on GEW2 site of HIGHER HATHERLEIGH

planning application and map

Solar panels near Cheritons/ Holton
april 12: A 5MW “solar park” has been proposed at HIGHER HATHERLEIGH Farm, Grove Lane, about 1 km (0.62 of a mile) south of Wincanton alongside the old S&D railway line adjoining the Wincanton sewage farm

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School